Skip to the record
Accept no imitations.

Original source · versioned page text

Attach G- Engineering Report

Attached to the e-mail MCU16/0012 - 5 Garnet Street Cooroy.

of 145

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 143, section 1. The text section number identifies this passage in the reader.

                                       3 Garnet Street Cooroy, QLD 4563
                                               Water Supply & Sewerage Reticulation Code



Water Supply & Sewerage Reticulation Code
Specific Outcomes                             Acceptable Solutions/Probable Solutions                Compliance
                                                                                                     designed and constructed in
                                                                                                     accordance with SEQ D & C Code
                                                                                                     and PSP6 Engineering Design
                                                                                                     Standards – Water and Sewerage.
                                              S9.2 Erosion and sediment control measures are         The proposed development will
                                              designed and implemented in accordance with the        incorporate erosion and sediment
                                              Institution of Engineers Australia (Queensland         control measures as shown on
                                              Division) Soil Erosion and Sediment Control -          the preliminary civil engineering
                                              Guidelines for Queensland Construction Sites.          design drawings.
O10 Sewerage reticulation infrastructure is   No solution provided.                                  The proposed development
proven to be suitable for its use prior to                                                           works will comply with this
Council accepting the dedicated asset.                                                               requirement, with the proposed
                                                                                                     internal sewer reticulation being
                                                                                                     privately owned and constructed
                                                                                                     in accordance with AS3500.
                                                                                                     Sewer reticulation will be
                                                                                                     designed and constructed in
                                                                                                     accordance with SEQ D & C Code
                                                                                                     and PSP6 Engineering Design
                                                                                                     Standards – Water and Sewerage.
O11 Sewerage reticulation infrastructure is   No solution provided.                                  The proposed development
provided with all supporting technical                                                               works will comply with this
documentation.                                                                                       requirement.
O12 Where buildings or other structures       S12.1 The footing of any structure or building is      The proposed development
are developed adjacent to Council’s           located clear of the zone of influence but no closer   works will comply with this
sewerage reticulation infrastructure;         than 1.5m (measured horizontally) from                 requirement.
satisfactory provision is made to protect     infrastructure including sewers, water mains and
Log in to download the original file

Attach G- Engineering Report.pdf · 8.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.