ENG
Engineering Report & Stormwater Management Plan
Date: 5/02/2016 Document No.: 15087-ENG-01.Docx
By: MRS Revision No.: A
A new 150dia sewer connection will be provided from the supply in Garnet Street to the
proposed development to Unitywater standards.
For more details of the sewer reticulation refer to the engineering plans in Appendix B.
Internal house drainage design for this proposed development will be by others.
8. Water Reticulation
Figure 6.3 shows the existing water reticulation infrastructure for the proposed site. A hydrant
is situated adjacent to the site in Garnet Street.
SITE
Hydrant
Figure 6.3: Existing water reticulation infrastructure (DBYD)
A new water connection will be provided from the supply in Garnet Street to the proposed
development to Unitywater and SEQwater standards.
The Internal water supply design for this proposed development will be by others.
A PO Box 26, Carina Q 4152 15 | P a g e
E [email protected]
W www.vtce.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.