Original source · versioned page text
Attach G- Engineering Report
Attached to the e-mail MCU16/0012 - 5 Garnet Street Cooroy.
Original PDF page 57, section 1. The text section number identifies this passage in the reader.
This document consists primarily of the processes and tasks associated with the hand maintenance and inductor maintenance procedures. It does not include detail of the traffic management requirements or occupational health and safety requirements. Contractors or IES staff should utilise their own Employee Health and Safety Manual, which details the policies and procedures for safe work.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.