Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Attach G- Engineering Report

Attached to the e-mail MCU16/0012 - 5 Garnet Street Cooroy.

of 145

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 81, section 1. The text section number identifies this passage in the reader.

    4. Evaluation is conducted using full-scale systems with details of treatable flow rates sampled and
       how they correlate to discrete removal efficiencies and comparisons to the designed treatable flow
       rates of the device. A comparison should also be made to the climatic conditions especially where
       un-restricted filters are used.

Maintenance Overview

The primary purpose of the Stormwater Treatment Train is to filter out and prevent pollutants from entering
our waterways. Like any effective filtration system, periodically these pollutants must be removed to restore
the system to its full efficiency and effectiveness. Maintenance requirements and frequency are dependent on
the pollutant load characteristics of each site. Maintenance must be performed in accordance with the
Treatment Trains Operation & Maintenance Guidelines.




©2011 Stormwater360
Log in to download the original file

Attach G- Engineering Report.pdf · 8.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.