Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Attach G- Engineering Report

Attached to the e-mail MCU16/0012 - 5 Garnet Street Cooroy.

of 145

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 87, section 1. The text section number identifies this passage in the reader.

    1. Insert the lifting hooks beneath the grate. (Position indicated in Plate 2)
    2. Check hinge point is not damaged and debris is not caught in the hinge area.
    3. Note many cast iron hinges are not hinged securely (to enable the removal of the grate). This may
       result in the pit grate not being able to sit in an open position. Additionally the hinge pins may also be
       damaged or corroded, which may allow for the pit grate to fall into pit. Such pit grates can be
       removed using the method indicated below for non-hinged grates.
    4. Fully open pit grate, ensuring that the grate will stay in the open position without any external forces
       applied. Grates which do not remain open without being held should be removed or secured during
       cleaning or maintenance activities. Plate 3 and Plate 4 indicate the grate being opened and grate
       resting freely in the open position, respectively.




             Plate 2 Lifting the grate                   Plate 3 Opening Grate




             Plate 4 Fully open grate                    Plate 5 Lowing grate




3.2.2 Non-Hinged Pit Grates

To remove a non-hinged pit grate:
    1. Place lifting hooks beneath grate, where possible in the four corners of the grate (Plate 6). Concrete
       lids may have Gatic lifting points, a key arrangement or holes in the lid, as such special equipment,
       such as Gatic lifters may be required.
    2. Position each person either side of the grate. (Plate 7)
    3. Lift the grate, ensuring that good heavy lifting posture is used at all times.
    4. Place the grate on an angle on the gutter, to allow for the lifting hooks to be removed. (Plate 8)
    5. For extremely heavy one piece grates and concrete Gatic covers, insert the lifters in place and slide the
       lids back. Note some lids may still require two people. (Picture required)




©2011 Stormwater360
Log in to download the original file

Attach G- Engineering Report.pdf · 8.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.