Council archive · source document
06/1354 - Formally suspend appeals period and submit following for consideration [As Published] · 132006.1354
If neither of the foregoing conclusions is correct then it is absolutely essential that the issue of hazard reduction burning of this area be addressed frequently. In reality it is likely that the 4 metre covenant within the building blocks will undergo the removal of undergrowth as a tidying procedure — and therefore reduce the fuel load - but there can be no guarantee of this. 2.3 Southern Cleared Area This area includes the playing area of Boreen Field and an adjacent park area of mown grass among ornamental trees. Both of these areas were shown in the 2006 report to be substantial firebreaks. They are divided by a narrow area of vegetation that surrounds a drainage line that runs in a north-south direction. This vegetation was previously not considered an issue for fire purposes due to its narrow extent and the fact that being a drainage line it would be frequently wet. However an extra 15 metre wide area adjacent to this drainage vegetation has undergone rehabilitation by tree planting and mulching. It cannot be predicted with any certainty how this rehabilitation area will be managed. Unfortunately most similar projects do not enjoy the ongoing management zeal that is associated with their installation and it is likely that the area will become an extension of the mowed park rather than an extension of the vegetated corridor. In all events it can be stated with some certainty that — due to flat terrain, extensive surrounding cleared areas and the extent of the vegetation itself— this vegetation will not present a significant hazard to intending residents. However its presence should be noted and included in any hazard reduction burning in Tewah Rd. 2.4 Western Vegetation Covenant This area is contiguous with the Vegetation Covenant in Laguna St but is approximately twice as wide. It would be expected that its perimeter which fronts Boreen Rd and Tewah Rd will receive a higher level of maintenance during and after development than it presently enjoys — if not landscaping treatment as has already occurred in Laguna St - and this will result in a reduction of available fuel for fires. The 2006 assessment calculated the hazard of this area as High but — as for the entire site — the following mitigating circumstances still apply: Taylor Ecology Laguna St Aug 2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1354 - Formally suspend appeals period and submit following for consideration [As Published]Related documentApplication case desk ↗
About this file
- File size
- 556 KB (small file)
- File type
No other editions are linked here.