Geotechnical Investigation Report

of 49

Page text read automatically using OCR, there may be inaccuracies

E
Ce.

Geotechnical Investigation Report

PTG/01059 - 0001 - RevO
Proposed Residential Development
23 Bottlebrush Avenue, Noosa QLD 4567

6 May 2025

www.ptgconsulting.com.au

 

Log in to download the original (Geotechnical Investigation Report.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 48 pages

Page 2

REPORT DETAILS

Unique Document Identification

Document Title Geotechnical Investigation Report - Proposed Residential Development
Project Number PTG/01059
Document ID PTG/01059 - 0001 - RevO
Client JTJH Developments Pty Ltd
Client Contact Cheri Hill
PTG Office Details
[oo
Location Sunshine Coast
Address U2/9-13 Matheson Street, Baringa, QLD, 4551
Telephone 1300 911 304
Email [email protected]
Web www.ptgconsulting.com.au

Revision Details

RevO

Document Approval

Written By:

Matthew Earle
Engineering Geologist

p [0448 844 926
e | [email protected]

06/05/2025

Issued to client

Reviewed By:

Justin Taing

Regional Director - Geotechnical RPEQ 30087
p | 0447 316 857

e | [email protected]

Page 3

1 REPORT SCOPE
2 SITE DESCRIPTION
3 REGIONAL GEOLOGY
4 FIELD INVESTIGATION
5 GEOTECHNICAL MODEL
6 GEOTECHNICAL COMMENTS
    EARTHWORKS ADVICE
6.1.1 SUBGRADE PREPARATION
6.1.2 FILLING
6.1.3 EXCAVATION CONDITIONS
6.1.4 SUITABILITY OF SITE WON MATERIAL
    SITE CLASSIFICATION AND SITE MOVEMENTS
    FOUNDATIONS
6.3.1 HIGH LEVEL FOUNDATIONS
6.3.2 PILED FOUNDATIONS
    SAFE TEMPORARY AND PERMANENT BATTER SLOPES
    RETAINING WALL PARAMETERS
    BASEMENT CONSTRUCTION CONSIDERATIONS
    LANDSLIDE RISK ASSESSMENT
7 LIMITATIONS




Table 1: Summary of Materials Encountered in Boreholes
Table 2: Allowable Bearing Pressures for High Level Footings
Table 3: Ultimate Geotechnical Design Parameters for Bored Piles
Table 4: Design Parameters for Temporary and Permanent Retaining Walls
Table 5: Summary of the Qualitative Slope Risk Assessment

Page 4

1 REPORT SCOPE

This report presents geotechnical reporting based on the results of a geotechnical investigation carried out by Core
Consultants Pty Ltd, for the proposed residential development to be located at 23 Bottlebrush Avenue, Noosa QLD
4567 . PTG Consulting (PTG) was engaged to re-evaluate and report on the geotechnical investigation results
considering new updated plans for the development. The investigation was commissioned by Cheri Hill on behalf of
JTJH Developments Pty Ltd.

Based on the plans provided by JTJH Developments (drawing package ref. MCU20-0116 dated 23 August 2021), it is
understood that the final usage of the site will comprise a three-storey residential dwelling with basement level
carparking and associated driveway, courtyard and swimming pool.

Geotechnical investigation for the site was completed by Core Consultants in August 2021 (report ref. JOO1369-001-
R-RevO Geotechnical Investigation Report). The investigation scope included two (2) hand auger boreholes with
dynamic cone penetrometer (DCP) testing undertaken in general accordance with 'AS1726:2017-Geotechnical Site
Investigations’.

This report includes a brief description of the fieldwork procedures, the results of the fieldwork and reporting on the
following:
Subsurface conditions including groundwater (if encountered);
Site classification and predicted ground surface movement (Ys) in accordance with AS 2870-2011;
Earthworks recommendations;
Allowable bearing pressures for high level footings and estimated settlements;
Suitable pile types, ultimate base bearing, skin frictions and estimated settlement (if required);
Landslide risk assessment per Council Legislation;
Temporary and permanent batter slopes;
Basement construction recommendations; and
Any other geotechnical issues identified that would need management (if any).

2 SITE DESCRIPTION

The site is located at 23 Bottlebrush Avenue, Noosa Heads and is identified as lot 140 on RP88934. The site has an
area of 506 m? and is bordered by residential units to the northwest and southeast, a residential house to the northeast
and Bottlebrush Ave to the southwest. Figure 1 shows an aerial view of the site and surrounds with the approximate
site boundary shown in red.

Review of contour plans provided indicates that the that the site currently slopes down from the rear of the property
towards Bottlebrush Ave from approximately RL 37 m down to RL 31m ADH.

At the time of the investigation, there was a house covering much of the lot surrounded by trees and other vegetation.
Figures 2 and 3 are images that were taken at the time of the investigation and show the general site conditions.

Page 5

 
 

os

Figure 1: Areial Imagery of the

 

3 REGIONAL GEOLOGY

Reference to available geology mapping indicates that the site is underlain by Pleistocene aged Quartz sand (Qpd/2),
which is comprised of parabolic sand dunes. Figure 2 shows an aerial view of the site (in red) with the regional geology

overlay.

site from QLD Globe (in red)

  

 

The J
IGA Noosa

7-Eleven

Former bowling club

Noosg Heads Motel

oF

ed Prince'sSUPA pz.

 

PLEISTOCENE

dunes.

 

Qpd/2 | Quartz sand; parabolic sand

 

 

 

Viewlang Dr

Nairana Rest

Eugarie St

 

Figure 2: Regional geology as extracted from the Queensland Geotechnical Database.

 

Aemel

 

 

 

 

 

Page 6

4 FIELD INVESTIGATION

The fieldwork undertaken by Core Consultants included two (2) hand auger boreholes drilled to 4.0 m below existing
ground levels. Dynamic cone penetrometer (DCP) testing was undertaken adjacent to the boreholes.

Testing and subsurface logging of the boreholes was undertaken by a geotechnical engineer, in accordance with
AS1762-2017 - Geotechnical Site Investigations. The geotechnical investigation report is attached in Appendix 1.

5 GEOTECHNICAL MODEL

Table 1 summarises the soils encountered within the hand auger boreholes. In summary the soil profile encountered
within the boreholes generally comprised a surficial 0.1m to 0.18 m thick layer of topsoil, potentially underlain by
uncontrolled sand fill to depths up to 1.0 m, underlain again by natural dune sands to termination depths.

Table 1: Summary of Materials Encountered in Hand Auger Boreholes

ste Ra Topsoil\(m) Fill- SAND (m) Natural - SP SAND (m)
oe
1

0.0 - 0.18 0.18 - 1.0 1.0 - 4.07
2 0.0 - 0.1 N/E 0.1- 4.0"

Note: TD = termination depth, N/E = material not encountered in auger hole

Dynamic cone penetrometer (DCP) testing undertaken indicated:
Fill soils typically have a loose relative density;
Natural sand soils from depths of 0.1 m to 1.6 m typically have a loose relative density;
Natural sand soils from depths of 1.6 m typically have a medium dense relative density, grading to dense at depths
of approximately 3.5 m.

Groundwater was not encountered during the drilling of the hand auger boreholes. It should be noted that groundwater
levels can be perched and fluctuate seasonally and during and after heavy rainfall events. Given this natural variability,
it is prudent to assume that water levels can fluctuate.

6 GEOTECHNICAL COMMENTS

The geotechnical comments in this report are based on the factual information collected during the fieldwork
conducted by Core Consultants, best practice, local experience and published literature, however they are
fundamentally opinion.

In summary, the ground conditions that are likely to be encountered at the site can be characterised as comprising a
0.1 m - to 0.18 m surficial layer of topsoil, potentially underlain by loose uncontrolled sand fill to depths up to 1.0 m,
underlain again by loose natural dune sands to depths up to 1.6 m. Below 1.6 m natural sands are expected to be
medium dense, grading to dense with depth.

Based on the ground conditions and the provided development plans, it is likely that the most suitable foundation
system for the building would comprise high level pad and strip footings supported on natural medium dense sand.
Piled foundations are recommended for heavily loaded or movement intolerant structures.

6.1 EARTHWORKS ADVICE

6.1.1 SUBGRADE PREPARATION

To achieve a uniformly well compacted subgrade to support slabs and pavements, the subgrade should be uniformly
compacted to a minimum 100% standard compaction. To prepare the subgrade, the upper 0.3 m depth (particularly
in cut areas) may need to be scarified, moisture-conditioned and recompacted to a minimum 100% minimum dry
density ratio (DDR) with a moisture variation not exceeding +2% of the optimum moisture content (OMC) followed
by a test roll and sealing as soon as practical.

Page 7

6.1.2 FILLING

All structural fill should be placed and compacted under Level 1 inspection and testing in accordance with site specific
design drawings and specifications. Minimum earthwork requirements should be in accordance with ‘AS3798-2007
Guidelines on Earthworks for Commercial and Residential Developments’. In summary, AS3798 guidelines
recommend the following:
Strip vegetation and uncontrolled fill (if any);
Test rolling using the following plant and load conditions. It is noted that sand/silty sand exposed at subgrade
level can be prone to displacement during the test roll however when confined (i.e. beneath pavements) performs
adequately:
© astatic smooth steel wheeled roller with a mass not less than 12 tonne and a load intensity under a wheel load
not less than 6 tonnes;
© a pneumatic tyred plant with a mass not less than 20 tonnes and a ground pressure not less than 450 kPa per
tyre; or
o ahighway truck with rear axle loaded not less than 8 tonnes with tyres inflated to 550 kPa;
Subject to site specific conditions, any soft areas identified might need to be removed and replaced with select
material; and
Structural fill should be in near horizontal layers, commonly termed ‘lifts’, and generally not to exceed 300 mm
thick (uncompacted) and compacted to a 98% minimum dry density ratio (DDR) for general fill and 100%
minimum DDR in the upper 0.5 m depth beneath slabs and pavements with a moisture variation not exceeding
+2% of the optimum moisture content (OMC). The maximum particle size should be limited to two-thirds of the
compacted layer thickness. Where structural fill abuts slopes generally steeper than 8H:1V (if any), benches equal
to the height of the fill layer should be cut into the slope before filling.

Other earthwork considerations include:
The most suitable plant for compaction is a smooth drum roller for granular (i.e. clean sand soils); and

PTG can provide Level 1 supervision and testing following site specific design drawings and specifications and AS
3798-2007 if required.

6.1.3 EXCAVATION CONDITIONS

Excavation of the encountered fill and natural sand soils could be achieved using excavators of any size. Based on the
development plans and site conditions, a 14t excavator is suggested as most suitable.

6.1.4 SUITABILITY OF SITE WON MATERIAL

Topsoil encountered across the site is not considered suitable for reuse as engineered fill. Topsoil material (excluding
rootlets) can be stockpiled and reused as topsoil post earthworks.

Provided that there are no limitations on fill (ie shrink-swell, CBR, WPI), clean dune sands encountered onsite could
be considered suitable for reuse as engineered fill.

6.2 SITE CLASSIFICATION AND SITE MOVEMENTS

In accordance with AS2870, the site is classified as ‘P’ due to:
The bearing strength is less than that specified in Clause 2.4.5 as per Section 2.1.3(a);
The site contains uncontrolled or controlled fill as identified in Clause 2.5.3;
o Removal of an existing building or structure likely to have significantly modified the soil moisture conditions
under the footprint of the footing system of the building as per section 1.3.3 (a);
o Removal of trees prior to construction as per section 1.3.3(b);
o. Presence of trees on the building site or adjacent site as per section 1.3.3(c);

Page 8

The site can however be re-classified, and this re-classification is provided below, assigning an equivalent site class in
response to normal soil moisture conditions. The estimated characteristic ground surface movement in normal soil
moisture conditions for the site is expected to be between O mm and 20 mm, consistent with a ‘Class S’ site.

This classification is relevant to sites subject to normal moisture conditions. Abnormal moisture conditions, such as
from the removal or planting of trees (including on adjacent sites), poor site drainage, and development of gardens
adjacent to the footings, may cause higher movements to occur, probably resulting in damage, which may or may not
be within acceptable limits. It is noted that characteristic ground surface movement for the site is based on the existing
soil profile, and the moisture content changes withing soils due to normal seasonal variations. It does not consider soil
settlement under building foundation load.

6.3 FOUNDATIONS

Based on an interpretation of the typical structural loads anticipated, basement levels for the building and subsurface
conditions encountered during the investigation, both high level and piled foundations could be considered as suitable
for the development. Discussion on the suitability of high level foundations can be found in section 6.3.1 below.

Based on the information available at the time of writing this report, general design parameters and recommendations
have been provided in the subsections below which can be used for design of the foundation system of the structure.
The design of the structure must consider the structural loads against serviceability.

All footing excavations should be inspected by PTG to confirm that bearing pressures have been achieved, and
footings are clean and free from loose and/or water softened materials.

6.3.1 HIGH LEVEL FOUNDATIONS

Preliminary design of high-level pad footings up to 3m wide or strip footings with a minimum 0.5m depth can be
designed using the allowable bearing pressures in Table 2. Elastic settlements of properly designed and constructed
high level footings are usually in the order of 10 mm for 0.5m wide strip footings to 25 mm for large square pad
footings up to 3 m wide.

It is anticipated that the ground conditions at basement foundation level across the majority of the buildings footprint
will comprise medium dense or denser natural sands. Where medium dense natural sands are present at basement
foundation levels, PTG’s below preliminary design of high level footings can be considered suitable.

If any areas of uncontrolled fill or loose soils are found to be present at basement foundation levels, these would not
be considered as suitable founding soils for the below high level footing design, and are suggested to be removed and
replaced with engineered structural fill, in accordance with '‘AS3798-2007 Guidelines on Earthworks for Commercial
and Residential Developments’.

Table 2: Allowable Bearing Pressures for High Level Footings

Material Type Allowable Bearing Pressure (kPa)

‘Uncontrolled’ fill Not Recommended
‘Controlled’ fill 100

Loose sand Not Recommended
Medium dense sand 100
Dense sand 200

It is noted that in sand soils, bearing capacity increases with footing base depth. While suitable bearing capacity may
be achieved in loose sands be designing the footings at greater depths, high level footings are not recommended on
loose sands due to the potential for instantaneous settlement of foundations.

Page 9

6.3.2 PILED FOUNDATIONS

Pile foundations can be used to support the proposed structures to transfer building loads to the more competent soils
at depth.

The piled foundation options which are suitable for the site include:
Continuous flight auger (CFA) concrete.

Driven steel tube, H pile or precast concrete.
Screw piles.

Bored piles can be designed using the ultimate skin friction and base bearing capacities in Table 3 below.

Table 3: Ultimate Geotechnical Design Parameters for Bored Piles

Material Type Ultimate Skin Friction (kPa) Ultimate Base Bearing (kPa)

Loose sand/silty sand Not Recommended Not Recommended
Medium dense sand/silty sand 2 500
Dense sand/silty sand 4 1000

The above parameters are only suitable where the excavation of piled foundations are supervised and at a minimum
inspected by a suitably qualified geotechnical engineer to confirm the founding conditions and materials encountered
in the side walls.

The design of piled foundations should be undertaken in accordance with:
AS 2159-2009: Piling - Design and installation;
Any other relevant design standards (Australian or international); and
Engineering Principles.

The piled foundation design should also consider:
Piles should be founded a minimum of two pile diameters into the nominated strata and have a minimum pile
length of four times the pile diameter;
The upper 1 m of pile length should be ignored due to pile load development and shrink swell effects; and
Settlement of properly designed and constructed footings should be less than 1% to 2% of the pile diameter.

To calculate the design geotechnical strength (Rd,g), the ultimate geotechnical strength should be multiplied by a
suitable geotechnical strength reduction factor (@g) as per Section 4 of AS 2159-2009. The geotechnical strength
reduction factor (@g) is based on:

gb = The basic geotechnical strength reduction factor, calculated using a risk assessment procedure;

otf = Intrinsic testing factor, based on the type of pile testing adopted; and

K = The testing benefit factor, based on a percentage of the piles that are tested.

Typically, where no pile testing is undertaken and the piles have a low redundancy, the assessed risk rating would be
high and a $g value of 0.45 would apply. It should be noted this assessment has been undertaken by PTG to assist
with the design of the foundations, however as assessment of each risk rating and factors must be undertaken by the
designer of the piles for the final design.

Specialist piling contractors should be consulted when selecting and installing piles.

6.4 SAFE TEMPORARY AND PERMANENT BATTER SLOPES

Excavations up to 1.5 m depth could generally be designed with a safe 1.5H:1V temporary batter slope. This assumes
that soils are not wet/saturated and groundwater is not present, and is subject to the below recommendations:
All temporary batters should not have construction loads (i.e. plant, equipment or soil stockpiles) or people at the
crest of the batters at a distance equal to the height of the slope;
Permanent batters (at a minimum) should be protected from erosion. Topsoiling and planting, or erosion matting
should be applied to the batter as soon as possible;
Suitable drainage and stormwater provisions must be installed for the batters. Surface and stormwater runover
must be directed away from batters and prevented from pooling at the base and crest. At a minimum, spoon
drained should be installed at the crest and base of permanent batters;
Temporary batters should not remain open for extended periods of time. Vertical excavations of up to 1.2 m are
usually formed near vertical for short periods of time to allow for the installation of services and construction of

Page 10

footings. Any batters or excavations exceeding this should be inspected by a suitably qualified geotechnical
engineer to assess to the temporary stability of the batter; and

Batters exceeding the heights or slopes stated above, or batters that contain buildings or surcharge loads within
a distance equal to one batter height from the crest, should undergo detailed stability analysis to determine risk
levels.

If temporary batters steeper than 1.5H:1V are proposed for the site these will require the design of a suitable retention
system.

6.5 RETAINING WALL PARAMETERS

It is understood that retaining walls may be required for the development. Retaining wall type and height are unknown
at the time of writing this report.

Any temporary or permanent retaining structures at the site should be designed in accordance with AS4678-2002
‘Earth Retaining Structures’.

Based on the results of the fieldwork, retaining wall design parameters for temporary or permanent walls are
summarised in Table 4.

Table 4: Design parameters for temporary and permanent retaining walls

   

nee Coefficient of Melis oma)
, Dry unit weight ite earth NS oTT aks)
Material Type Angle
(kKN/m3) ne IRS Ceee| mike g modulus
. Co) (MPa)
Loose sand 7 28 0.53 2
Medium dense sand 18 34 0.43 6
Dense sand 19 39 0.36 10

Retaining wall design should consider the below:
The distance from the crest and magnitude of any surcharge loads (ie buildings, roads).
Whether the selected wall type is suitable for the proposed loading conditions.
Wall geometry and the presence of any slopes at the crest or toe of the wall.
Type of backfill to be used behind the wall, and whether compaction will exert additional forces onto the wall.

6.6 BASEMENT CONSTRUCTION CONSIDERATIONS

Based on the provided drawings, it is implied that a temporary soil retention system may be necessary for the
excavation and construction of the building’s basement level. Temporary retention options and considerations are as
follows:

A secant pile wall can be used, however it should be noted that standard piling tolerances might lead to the
formation of gaps within the wall, which could result in potential leakage issues.

Sheet piles may also be contemplated, taking into account the vibrations caused by their installation and the
challenges associated with reaching the required depths. The installation of sheet piles in loose sand can result in
movement and damage to adjacent assets such as services, pavements and structures. The impact of potential
ground movement, as well as noise and vibration, should be considered where f=driven or vibratory sheet piles
are being considered for ground retention.

It's important to recognise that some ground movement may occur behind retaining walls. The amount of
movement will depend on factors such as the height of the wall, the type of wall chosen, and the construction
methods used. These factors should be considered during the design and construction of the retaining walls to
ensure that surrounding facilities are not negatively impacted.

Page 11

6.7 LANDSLIDE RISK ASSESSMENT

Noosa Shire Council mapping indicates that the proposed site is mapped as a ‘moderate hazards area’, as shown in
Figure 3.

 

 

      
  
  

OSP325724 <OSP197112 48 y
a 20
: 121RP88934" =.
AZ0BUBIS ITE OSRIITTIT
QSPI12077,

   
   

   
  

125RP88934
v
28
126RP88934
30

1gfepseo34
Se 25 A
1B a ieg19648 iS
ges Cr: PBB934
3 34

 
    
  
 

9 rR

    
 

 
  

25
27

    
 
 
 
  
  

    
   

i , y 1364 ¥ 29 w
1RP173872,"~ Pe 34S 38RP 88934 MeatgL8934
mee 1GTP2033
3 x
2GTP2033
29 Co es 130RP88934 =
oGTP203 Ri 3 a
a o
r, OBUP6343 g— 9 &
Rie TPs 0BUP6343
yy JEM e 2GTP596 OBURD S45 oO
i 3 IPS77!
OGTRR96 S9BUPSI7, -ppeg934

 

OBUPS776

Based on the results of the ground conditions encountered at the site, two potential failure mechanics can be
considered, these include:
Hazard 1- Small rotational failure through the natural loose sands - volume of failure less than 20m3 (failure will
required an unusual sever triggering event)
Hazard 2 - Large rotational failure through the natural loose sands - volume of failure less than 2000m3 (failure
will required an extreme triggering event)

A qualitative landslip risk assessment was completed for these potential failure mechanisms in general accordance
with Australian Geomechanics (2007) Guideline for Landslip Susceptibility, Hazard and Risk Zoning for Land Use
Planning). The slope risk assessment is summarised in Table 5.

The small and large rotational failures through the loose sands are of very low and low risk, respectively and are
unlikely to impact the property and people who live or spend time in the area, provided the following recommendation
are adhered too:
All temporary and permanent retaining walls and excavations shall be designed in accordance with AS4678, and
stability analysis be carried out by a geotechnical engineering ensuring minimum Factors of Safety (FOS) for
temporary and permanent conditions of 1.3 and 1.5, respectively are achieved.
All foundations of the house to be extended to the medium dense sand, as a minimum.
The development shall adhere to good hill side practice. Examples of good and poor hill side practice for the
construction of residential dwelling on slopes is presented in Appendix D, Practice Note Guidelines for landslide
risk management 2007, from Australian Geomechanics Journal Vo 42, No. 1 dated March 2007.

Page 12

Table 5: Summary of the qualitative slope risk assessment

here Hazard 1 - small rotational failure though | Hazard 2 - Large rotational failure though
the natural loose sands up to 20m? the natural loose sands up to 2,000 m?

Property People, who either Property People, who either
live, or may that live, or may that
Risk Element spend some time in spend some time in
Htilee-lecr dicate} LtuTeM-1 ect M-LAKreLn=xe|
by the landslip by the landslip

Likelihood Frequency POSSIBLE POSSIBLE BARLEY CREDIBLE = BARLEY CREDIBLE
estimate, expressed Cc C F F

as an annualised

probability and

taking into account

the probability of

spatial impact

   

Measure of INSIGNIFICANT INSIGNIFICANT MAJOR CATASTROPHIC
consequence 5 5 2 1
RISK LEVEL VERY LOW VERY LOW VERY LOW LOW

VL VL VL L

7 LIMITATIONS

PTG Consulting has prepared this report (or services) for this project in accordance with PTG's proposal and
acceptance received from the Client. These limitations apply whether the report was created under PTG’s own terms
and conditions or otherwise.

This report is provided for the exclusive use of the JTJH Developments Pty Ltd for the Geotechnical scope of works at
23 Bottlebrush Avenue, Noosa QLD 4567 . The report should not be used by or relied upon for other projects or
purposes on the same or other site or by a third party. Any party so relying upon this report beyond its exclusive use
and purpose as stated above, and without the express written consent of PTG, does so entirely at its own risk and
without recourse to PTG for any loss or damage. In preparing this report, PTG has necessarily relied upon information
provided by the client and/or their agents.

PTG's advice is based on information gained from limited subsurface excavations and sampling supplemented by
knowledge of local geology and experience. The accuracy of the advice provided by PTG in this report may be affected
by undetected variations in ground conditions across the site between and beyond the sampling and/or testing
locations. For this reason our reports include an interpretation of conditions between the test points. There are
unknowns or variations in ground conditions between test locations that cannot be inferred or predicted. Such
variations may occur after PTG's field testing has been completed. The precision and reliability of interpretive
assessment between discrete points is dependent on the uniformity of the subsurface strata, as well as the frequency,
detail, and method of sampling or testing.

Geotechnical information represents an opinion and is based extensively on judgment of both data and interpretive
assessments or observation. This report and its associated documentation are provided explicitly based on PTG's
opinion of the site at the time of inspection, and cannot be extended beyond this. Any recommendations or design
suggestions will need to be verified on site during project implementation or construction. Inspection and verification
onsite may be conducted by a suitably qualified geotechnical consultant or engineer, and where subsurface conditions
or interpretations differ from those provided in this document or otherwise anticipated, PTG must be notified and be
provided with an opportunity to review the recommendations

The report has been prepared by qualified personnel, and is based on the information obtained from field and
laboratory testing, and has been undertaken to current engineering standards of interpretation and analysis. The
information and interpretation may not be relevant if the development proposal is changed. If this happens then PTG
Engineering will be pleased to review the report and the sufficiency of the investigation work.

Every care is taken with the report as it relates to interpretation of subsurface conditions, and the discussion and
recommendations or suggestions relating to the geotechnical aspects of the scope of works. However, PTG
Engineering cannot always anticipate or assume responsibility for:

Unexpected variations in ground conditions.

Page 13

Changes in policy or interpretations of policy by statutory authorities.
The actions of contractors responding to commercial pressures.

The contents of this report do not constitute formal design components, as required by Health and Safety Legislation
and Regulations, to be included in a Safety Report specifying the hazards likely to be encountered during construction
and the controls required to mitigate risk. This design process requires risk assessment to be undertaken, with such
assessment being dependent upon factors relating to the likelihood of occurrence and consequences of damage to
property and to life. This, in turn, requires project data and analysis presently beyond the knowledge and project role
respectively of PTG.

This report must be read in conjunction with all of the attached documents and should be kept in its entirety without
separation of individual pages or sections. PTG cannot be held responsible for interpretations or conclusions made by
others unless they are supported by an expressed statement, interpretation, outcome, or conclusion stated in this
report.

Page 14

 

Appendix 1

Geotechnical Investigation
Report

 

 

Page 15

Geotechnical Investigation Report
Proposed Development
23 Bottlebrush Avenue, Noosa Heads




Prepared for:
Russell Green
RG Strategic
PO Box 1818
Noosa Heads QLD 4567


Report Number: J001369-001-R-Rev0


August 2021

Page 16

J001369-001-R-Rev0                                                                                     August 2021



Executive Summary
Core Consultants Pty Ltd (Core) has carried out a geotechnical investigation for a proposed development at
23 Bottlebrush Avenue, Noosa Heads.
The proposed development comprises a three-level apartment with a single-level basement and associated
driveway, visitor carparking, courtyard and pool. It is anticipated that earthworks for the project will generally
include cuts of between 2 m to 5 m depths, with minor filling to form finished surface levels.
The fieldwork comprised a walk-over survey and the drilling of two boreholes (designated HA1 and HA2) to
4 m below ground level (BGL).
The subsurface profile encountered in the boreholes generally comprised sand topsoil of between 0.1 m to
0.18 m thickness, overlying sand fill up to 1 m depth (HA1) over natural aeolian sand. The sand is generally
loose to medium dense, becoming dense from about 1.5 m depth. The fill encountered in HA1 is assumed to
be uncontrolled.
Groundwater was not encountered in the boreholes during the investigation. Due to the relatively permeable
nature of the sand, prolonged periods of high groundwater or saturated soils are not anticipated except
following periods of high rainfall.
The site is classified as ‘Class ‘P’ due to the presence of uncontrolled fill. However, the natural soils on site
may be classed as equivalent ‘Class ‘S’ in accordance with AS 2870-2011. The estimated characteristic
ground surface movement due to seasonal moisture variation (‘y s’ value) for this site is less than 20 mm.
Due to space constraints preventing trimming of batters to safe slopes, positive support by engineer-
designed retaining structures will be required for excavation of the basement. Possible retention systems
could include sheet pile walls.
High level footings may be designed for the basement using an allowable bearing capacity of 200 kPa in the
dense natural sand.
A qualitative slope stability risk assessment for this project has been carried out following the Australian
Geomechanics Society (AGS) Guidelines for Landslide Risk Management (March 2007). The assessed risk
is Low for the proposed development. This level of risk is normally acceptable to regulators.
Comments and recommendations regarding site preparation and trafficability, filling and compaction,
excavatability, retaining wall design parameters, drainage and general foundation maintenance are provided
in this report.
From a geotechnical viewpoint, our assessment is that the site is suitable for the proposed development
subject to the implementation of the recommendations in this report.




                                                         i

Page 17

J001369-001-R-Rev0                                                                                                                               August 2021


Table of Contents
1.0     INTRODUCTION .................................................................................................................................... 4
2.0     PROPOSED DEVELOPMENT ............................................................................................................... 4
3.0     SITE DESCRIPTION .............................................................................................................................. 4
4.0     INVESTIGATION .................................................................................................................................... 6
4.1     Fieldwork................................................................................................................................................. 6
5.0     INVESTIGATION FINDINGS .................................................................................................................. 7
5.1     Desktop Study ........................................................................................................................................ 7
5.2     Subsurface Conditions ............................................................................................................................ 7
5.3     Groundwater ........................................................................................................................................... 7
5.4     Surface Drainage .................................................................................................................................... 7
5.5     Vegetation ............................................................................................................................................... 7
5.6     Existing Structures .................................................................................................................................. 8
6.0     ASSESSMENT OF LAND STABILITY ................................................................................................... 8
6.1     Existing Conditions ................................................................................................................................. 8
6.2     Stability Risk Assessment ....................................................................................................................... 8
7.0     DEVELOPMENT IMPACTS AND MITIGATION MEASURES ............................................................... 9
7.1     Site Preparation and Trafficability ........................................................................................................... 9
7.2     Filling and Compaction ........................................................................................................................... 9
7.3     Excavations...........................................................................................................................................10
7.4     Foundations ..........................................................................................................................................10
7.4.1      Site Classification .............................................................................................................................10
7.4.2      Footing Design ..................................................................................................................................10
7.5     Retaining Wall Design Parameters .......................................................................................................11
7.6     Drainage and Erosion ...........................................................................................................................11
7.7     General Foundation Maintenance ........................................................................................................12
8.0     SUMMARY AND CONCLUSIONS .......................................................................................................12
9.0     LIMITATIONS .......................................................................................................................................12




                                                                               ii

Page 18

J001369-001-R-Rev0                                                                                                                           August 2021




Tables
Table 1: Stability Risk Levels. ............................................................................................................................ 8
Table 2: Qualitative Risk Assessment for Property (Based on AGS 2007) ....................................................... 9
Table 3: Retaining Wall Design Parameters.................................................................................................... 11



Figures
Figure 1 – Test Location Plan



Appendices
APPENDIX A Reports of Boreholes and Explanatory Notes
APPENDIX B AGS Practice Note Guidelines for Landslide Risk Management
APPENDIX C Guidelines for Hillside Construction
APPENDIX D CSIRO Foundation maintenance and footing performance: A Homeowner’s Guide
APPENDIX E Limitations




                                                                              iii

Page 19

J001369-001-R-Rev0                                                                                   August 2021


1.0     INTRODUCTION
As requested by RG Strategic, Core Consultants Pty Ltd (Core) has carried out a geotechnical investigation
for a proposed development at 23 Bottlebrush Avenue, Noosa Heads.
Presented in this report are the investigation results together with a qualitative slope stability assessment
and comments regarding:

 ▪     Site preparation and trafficability.
 ▪     Filling and compaction.
 ▪     Excavatability and temporary excavation support.
 ▪     Foundation design and parameters.
 ▪     Retaining wall design parameters.
 ▪     Drainage and general foundation maintenance.

2.0     PROPOSED DEVELOPMENT
Preliminary concept drawings were provided by the client (refer Drawing No. A202, dated 13 July 2021).
Based on these drawings we understand the proposed development will comprise a three-level apartment
development with a single-level basement and associated driveway, visitor carparking, courtyard and pool. It
is anticipated that earthworks will generally include cuts of between 2 m and 5 m depth and minor filling to
form finished surface levels.

3.0     SITE DESCRIPTION
The site is described as Lot 140 of RP88934 and covers an area of about 506 m2. The site is bounded by
Bottlebrush Avenue to the south-west and residential units and houses elsewhere. At the time of our
investigation there was an existing brick dwelling with an associated concrete driveway and footpath. The
dwelling was generally surrounded by scattered large trees and vegetation. Further details regarding site
conditions are given in Section 5.0.
The site generally slopes down to the south-west between about 10° and 12°, with the lower portion and
driveway steeper at about 18°. Available survey drawings (refer Drawing No. 12831-DTM-01, dated 25
March 2021) generally confirms the on-site slope measurements. Elevation levels across the site ranged
from between RL 37 m and RL 31 m. Image 1 below shows an extract of the abovementioned survey
drawing.
Photographs 1 to 3 show the general site conditions at the time of our investigation.




Image 1: Extract from survey drawings 12831-DTM-01 (dated 25 March 2021).

                                                        4

Page 20

J001369-001-R-Rev0                                                                               August 2021




Photograph 1: View looking approximately north-west across the rear of the site towards the northern boundary
(3 August 2021).




Photograph 2: View looking approximately north-east from Bottlebrush Avenue (3 August 2021).



                                                      5

Page 21

J001369-001-R-Rev0                                                                                August 2021




                        Brick retaining wall




     Timber sleeper retaining wall




Photograph 3: View looking approximately north-west towards the existing retaining walls (3 August 2021).

4.0      INVESTIGATION
The investigation included the following:

 ▪     A review of geological and landslide hazard overlay plans

 ▪      Walk-over survey and subsurface investigation and sampling at two locations

4.1     Fieldwork
A walkover survey was carried out by a geotechnical engineer to map topographical and surface features,
such as slope angles, signs of slope instability and groundwater seepage.
Following the walkover, a subsurface investigation was undertaken, which comprised the drilling of two
boreholes (designated HA1 and HA2) to 4 m below ground level (BGL). Due to site access constraints, the
boreholes were drilled using hand augering techniques. Dynamic cone penetrometer (DCP) testing was
undertaken adjacent to the boreholes to assess soil density/consistency. Soil samples were also collected
from the boreholes.
Borehole positions were recorded in the field using a handheld GPS unit.
The test locations are shown on the attached Figure 1. Reports of Boreholes are attached in Appendix A,
together with explanatory notes. The subsurface conditions are discussed in Section 5.2.
The fieldwork was carried out on 3 August 2021 by a geotechnical engineer from Core who logged
subsurface conditions in accordance with AS1726-2017 Geotechnical site investigations and undertook the
field testing and sampling.




                                                      6

Page 22

J001369-001-R-Rev0                                                                                                                             August 2021


5.0            INVESTIGATION FINDINGS
5.1         Desktop Study
The Gympie Special Geology Map1 indicates that the site is underlain by Pleistocene aged quartz sand dune
deposits (Qpd2). Image 2 below shows an extract from the geology map.




                                                                                            Approximate site location




Image 2: Extract from Gympie Special Geology Map1.

5.2         Subsurface Conditions
The subsurface conditions encountered in the boreholes generally comprised the following:

        ▪      TOPSOIL: comprising loose sand to depths of 0.1 m and 0.18 m BGL; overlying
        ▪      FILL: comprising loose sand to 0.5 m depth with possible fill further observed to 1 m depth BGL in
               HA1; overlying
        ▪      AEOLIAN SOIL: comprising loose to medium dense sand becoming dense from about 1.5 m depth
               to the termination depth of 4 m BGL.
Fill was only observed in borehole HA1 and was located on a garden bed on the southwest portion of the
site. The fill encountered is assumed to be uncontrolled. The fill material was generally consistent with the
aeolian soils, with the addition of occasional rootlets and organics.

5.3         Groundwater
Groundwater was not encountered in the boreholes during the investigation. Due to the relatively permeable
nature of the sand, prolonged periods of high groundwater or saturated soils are not anticipated except
following periods of high rainfall.

5.4         Surface Drainage
Surface drainage is anticipated to follow the natural contours of the land towards the south-west, with flows
directed into the roadside stormwater drainage system on Bottlebrush Avenue.

5.5         Vegetation
At the time of our investigation, site vegetation comprised short grass, shrubs and scattered large trees.
Densely vegetated areas (natural vegetation or garden beds) were concentrated in the south-west and north-
east portion of the site.

1
    GYMPIE SPECIAL 1:100,000 Geological Series. Map Sheet 9445 and Part 9545, First Edition, Department of Mines and Energy, Brisbane, 1999.



                                                                                      7

Page 23

J001369-001-R-Rev0                                                                                            August 2021


5.6    Existing Structures
The existing residence comprised a two-storey brick dwelling on a levelled building pad with an associated
concrete driveway and footpath. It is anticipated that cut and fill earthworks were required for construction of
the existing dwelling. The structures and ground conditions did not show any signs of instability. Tenants on
site further advised that no cracking or major issues have been observed within the existing dwelling.
A timber sleeper retaining wall of about 0.8 m height extends across part of the rear of the site. A brick
retaining wall of about 1.2 m to 1.5 m height extends along the along the northern boundary of the site. The
adjacent property is situated on the high side of the existing brick retaining wall.

6.0     ASSESSMENT OF LAND STABILITY
6.1    Existing Conditions
The Noosa Planning Scheme 2020 includes a landslide hazard overlay map. The overlay map indicates that
the site is within a moderate landslide hazard area. Image 3 below presents an extract of the overlay map.



                                                                                            Lot boundary




Image 3: Extract from Noosa Shire Council landslide hazard overlay mapping.

6.2    Stability Risk Assessment
A qualitative slope stability risk assessment for this project has been carried out following the Australian
Geomechanics Society (AGS) Guidelines for Landslide Risk Management (March 2007), refer Table 2. The
risk assessment relates to property. Relative levels of risk and their implications are given in Table 1 below
and the qualitative terminology (i.e. likelihood and consequence definitions) for use in assessing risk to
property are attached in Appendix B.
Table 1: Stability Risk Levels.
         Risk Level                                                 Example Implications(1)

              VERY HIGH           Unacceptable without treatment. Extensive detailed investigation and research, planning
VH                                and implementation of treatment options essential to reduce risk to Low; may be too
              RISK
                                  expensive and not practical. Work likely to cost more than value of property.
                                  Unacceptable without treatment. Detailed investigation, planning and implementation of
H             HIGH RISK           treatment options required to reduce risk to Low. Work would cost a substantial sum in
                                  relation to the value of the property.
              MODERATE            May be tolerated in certain circumstances (subject to regulators’ approval) but requires
M                                 investigation, planning and implementation of treatment options to reduce risk to Low.
              RISK
                                  Treatment options to reduce to Low risk should be implemented as soon as practicable.
L             LOW RISK            Usually acceptable to regulators. Where treatment has been required to reduce the risk to
                                  this level, ongoing maintenance required.
              VERY LOW
VL                                Acceptable. Manage by normal slope maintenance procedures.
              RISK

Note:
1) The implications for a particular situation are to be determined by all parties to the risk assessment and may depend on
the nature of the property at risk; these are only given as a general guide.




                                                              8

Page 24

J001369-001-R-Rev0                                                                                          August 2021


Table 2: Qualitative Risk Assessment for Property (Based on AGS 2007)
                                                              Assessed
           Hazard           Likelihood   Consequence                                        Comments
                                                                Risk
                                                                          The likelihood of shallow failure is assessed
 Shallow failure through
                                                                          as Unlikely. The consequence is considered
  loose fill and natural
                             Unlikely       Medium              Low       Medium, if the proposed development is
 aeolian soils above the
                                                                          founded as per the recommendations in this
    foundation depth
                                                                          report. The resultant risk is Low.
                                                                          The likelihood of a deep failure through the
Deep failure through the                                                  natural aeolian soil is assessed as Rare due
  dense (or denser)                                                       to historically low prevalence of instability in
 natural aeolian soils        Rare           Major              Low       this geological formation and no signs of
 below the foundation                                                     slope instability. Although the consequence
         depth                                                            of such a failure would be Major, the
                                                                          resultant risk is Low.

Based on the available information and the results of our investigation, it is our opinion that there is a Low
Risk of slope instability for the proposed development, subject to implementation of the recommendations in
this report, assessed in accordance with the AGS guidelines (March 2007).

7.0        DEVELOPMENT IMPACTS AND MITIGATION MEASURES
The potential impacts of the proposed development on slope stability have been considered, and the
measures recommended below have been designed to mitigate potential impacts. Building development
should follow normal slope maintenance procedures and the document ‘Guidelines for Hillside Construction’,
which is attached in Appendix C.

7.1       Site Preparation and Trafficability
Site preparation across the development footprint should include the following:

      ▪    Remove vegetation and ‘grub out’ stumps, large roots and root balls
      ▪    Remove any topsoil and uncontrolled fil. Topsoil was encountered between 0.1 and 0.18 m BGL,
           however deeper pockets may exist across the site. It is noted that dense vegetation was observed in
           the south-west and north-east portion of the site, where deeper organic materials may be present.
The base of the excavation is anticipated to comprise dense sands, which may become disturbed/loose at
the surface from excavation/construction traffic. Compaction of such loose sands may be required, using a
smooth-drum roller (4 tonne). Vibration and the application of water may be required. However vibration
impacts on adjacent sites must be assessed.
Allowance should be made for the placement of a 150 mm thick layer of aggregate across the base to form
an even and stable working platform, or on access/laydown areas.
The site must be maintained to shed water and prevent ponding during the construction phase. Erosion and
sediment control measures must be put in place during construction.
It would be prudent to carry out a dilapidation survey of adjacent structures and sites prior to site works.

7.2       Filling and Compaction
It is anticipated that filling will be minimal and will only be required to form finished surface levels or on
removal and replacement of unsuitable material.
Where filling is undertaken, the following measures should be adopted:

      ▪    Fill should be compacted at moisture contents within the range of ±2% of optimum moisture content
           for Standard Compaction.
      ▪    Confirmatory compaction testing must be carried out at regular intervals. Guidance on testing
           frequency is provided in AS 3798-2007 Table 8.1.
      ▪    Fill should have a maximum particle size of 100 mm.




                                                          9

Page 25

J001369-001-R-Rev0                                                                                      August 2021


      ▪    Fill should be compacted in layers, typically about 250 mm thick (loose thickness). However, layer
           thickness will be dependent upon the type/size of compaction plant, use of vibration, material type
           and condition.
      ▪    Fill shall be compacted by repeated rolling to achieve a dry density ratio of at least 95% of the
           Maximum Standard Dry Density for cohesive soils, or 70% Dry Density Index for cohesionless soils.
      ▪    Imported fill (if required) should be cohesive in nature and have a plasticity index of < 15%, a
           maximum particle size of 100 mm, and a soaked CBR of > 10%.
      ▪    Slopes and existing drainage channels should be benched to assist with fill placement and
           compaction.
Further details for control and testing of fill are given in Australian Standard AS 3798-2007 Guidelines on
Earthworks for Commercial and Residential Developments.
If filling greater than 0.5 m thickness is proposed, Core must assess the impacts on slope stability before
construction. Fill greater than 1 m thickness (if required) must be retained (refer Section 7.6).

7.3       Excavations
Due to space constraints, basement excavation will require positive support by engineer-designed retaining
structures. Possible retention systems include sheet piles (cantilevered, anchored or propped). Design and
construction of temporary support must consider adjacent structures (e.g. loads or undermining). It is
recommended that information on adjacent footings is obtained through site investigation or certified ‘as built’
plans. Vibration impacts of sheet piling must be considered. Temporary support must be designed by a
suitably experienced engineer (RPEQ) and installed by a specialist piling/shoring contractor.
Temporary excavations of less than 1 m height into the loose to medium dense sand (e.g. trenches) could be
battered at 1V:2H. Any cuts greater than 1 m must be retained (refer Section 7.6).
Based on the materials encountered in the boreholes, excavation for the basement is expected to encounter
loose to dense sands. Excavations in the anticipated soil materials should be achievable using conventional
earthmoving equipment.

7.4       Foundations
      7.4.1    Site Classification
Site classification derived in accordance with Australian Standard AS2870-2011 Residential slabs and
footings can provide an indication of the likely magnitude of reactive (shrink and swell) movements
associated with normal seasonal moisture variations.
Based on the results of the investigation the site is classified as ‘Class ‘P’ due to the presence of
uncontrolled fill.
However, the natural soils on site may be classed as equivalent ‘Class ‘S’ in accordance with AS 2870-2011.
The estimated characteristic ground surface movement due to seasonal moisture variation (‘ys’ value) for this
site is less than 20 mm.
It should be noted that the predicted order of movement is based on the existing soil profile (i.e. no cutting or
filling), and moisture content changes within soils due to normal seasonal moisture variations only (i.e. does
not consider soil settlement).

      7.4.2    Footing Design
The proposed building could be supported on high-level footings founded in the dense natural sands. A
design allowable bearing pressure of 200 kPa may be adopted for the dense sand.
Footing excavations should be inspected by an engineer from Core to confirm the foundation material meets
the design pressure requirements.
To achieve the recommended allowable bearing pressures, founding materials must be dry and cleaned of
any loose, disturbed or saturated materials prior to pouring concrete. Allowance should be made for
compaction of disturbed sand in the base of footing excavations.



                                                        10

Page 26

J001369-001-R-Rev0                                                                                                August 2021


If any soil conditions encountered during the footing excavations are found to differ from those noted in the
geotechnical investigation, Core should be notified immediately, and an inspection of the footing excavations
should be carried out to assess if changes to footing design are required.
Adequate site drainage should be carried out to ensure that natural runoff is directed away from the building
walls and footings.
All proposed footings should found such that they are not adversely affected by any adjacent excavations,
batter slopes, trenches, or retaining walls that are not designed to support building or fill loads.
To minimise the potential for any adverse interaction effects, footings should found at least below a plane
extending 1 m horizontally from the base of trenches/batter slopes/excavations/ retaining walls, then rising
up at 1V:1H. This requirement is illustrated in the following diagram.




                                      Diagram 1: Exclusion zone for base of footings.

7.5     Retaining Wall Design Parameters
Design for retaining structures could be carried out using a triangular pressure distribution applicable to the
wall type (i.e. active pressures for a cantilever wall or ‘at rest’ pressures for a propped wall) and based on the
parameters in Table 33. These values do not include an allowance for hydrostatic pressures, construction
loading, adjacent foundation loadings, the effect of sloping ground, or backfill compaction stresses.
Table 3: Retaining Wall Design Parameters.
                                      Unit           Friction                   Lateral Earth Pressure Coefficients
      Retained Material             Weight            Angle          Cantilever Wall        Non-yielding Wall
                                                                                                                      Kp
                                     (t/m3)        (Degrees)              (Ka)                    (Ko)
Loose Sand                             1.7              28                0.36                    0.53                2.77
Medium Dense Sand                      1.9              34                0.27                    0.43                3.61
Dense Sand                             2.0              39                0.22                    0.36                4.5
Compacted Fill                          *                *                  *                       *                  *
*: Variable depending on the type of material used and the degree of compaction achieved.

7.6     Drainage and Erosion
Site drainage should be designed to readily remove surface water, minimise water infiltration into the slope,
and to prevent ponding of water on subgrade areas during construction and also adjacent to foundations,
perimeter slabs, and driveways once construction is completed.
Roof water, including overflow from rainwater tanks, and water collected from hard surfaces (e.g. driveways)
must be directed by pipes or lined channels to a legal point of discharge.
Shallow subsurface cut-off drains should be installed upslope of building areas in order to intercept and
divert potential subsurface seepage. Diversion drains should be constructed above the crest of any cut or fill
embankments.
Any exposed soil on sloping ground must be protected from erosion (e.g. through re-vegetation).




                                                                11

Page 27

J001369-001-R-Rev0                                                                                August 2021


7.7   General Foundation Maintenance
The CSIRO document Foundation maintenance and footing performance: A Homeowner’s Guide (2003) is
attached in Appendix D for your information. This advice should be considered in the construction and
maintenance of the proposed development.

8.0     SUMMARY AND CONCLUSIONS
From a geotechnical viewpoint, our assessment is that the site is suitable for the proposed development, and
that there is a Low Risk of slope instability subject to implementation of the recommendations in this report.

9.0     LIMITATIONS
Your attention is drawn to the document, Limitations which is attached in Appendix E.
Yours sincerely,
CORE CONSULTANTS PTY LTD




Mark Conway                              Walter Mastenbroek
BSc (Earth Science)                      MEngPr MSc BSc (Hons) CPEng NER RPEQ 16149
Engineering Geologist                    Associate/Senior Geotechnical Engineer


MC/WM/mc




                                                      12

Page 28

C CORE CONSULTANTS PTY. LTD. INFORMATION CONTAINED ON THIS DRAWING IS THE COPYRIGHT OF CORE CONSULTANTS PTY. LTD. UNAUTHORISED USE OR REPRODUCTION OF THIS PLAN EITHER WHOLLY OR IN PART WITHOUT WRITTEN PERMISSION INFRINGES COPYRIGHT.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 HA2




                                                                                                                                                                                                                                                                                                                                                                                                                         HA1
                                                                                                                                                                                                                                                                                                                 BO
                                                                                                                                                                                                                                                                                                                    TT
                                                                                                                                                                                                                                                                                                                       LE
                                                                                                                                                                                                                                                                                                                         BR
                                                                                                                                                                                                                                                                                                                              US
                                                                                                                                                                                                                                                                                                                                  H
                                                                                                                                                                                                                                                                                                                                    AV
                                                                                                                                                                                                                                                                                                                                        EN
                                                                                                                                                                                                                                                                                                                                           U E




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            0                      4                   8            12 m

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            1:200



                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    CLIENT                                                 PROJECT

                                                                                                                                                                                                                                                 LEGEND                                                                                                                                                                                                                                                            RG STRATEGIC                            PROPOSED DEVELOPMENT - 23 BOTTLEBRUSH AVENUE, NOOSA HEADS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    DRAWN BY                   DATE                        DRAWING TITLE
                                                                                                                                                                                                                                                              Denotes approximate hand auger borehole location
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      MD                         05/08/2021
                                                                                                                                                                                                                                                              Denotes lot boundary
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    CHECKED BY                 DATE                                                  TEST LOCATION PLAN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      MC                         17/08/2021

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    SCALE                                     SHEET SIZE   PROJECT No       DOC No      DOC TYPE       FIGURE No   REVISION
                                                                                                                                                                                                                                            Base plan drawn by Natani Design. Drawing Title - Landscale Areas. Drawing No.- A0002. Dated 13 July 2021. Aerial image sourced from Nearmap Pty Ltd, image dated 21 July 2021. Annotations by Core Consultants Pty Ltd.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                       www.coreconsultants.com.au
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       1:200                     A3               J001369       001         R             F001        0       SHEET 1 OF 1
                                                                                                                                                                                                                                           Plot Date: 18 August 2021 Time:3:21:51 PM By: CAD Path: J:\2021 - J1228 -\J001369 - RGStrategic-Development-Bottlebrush Ave\PHASE 1000\Figures Drawings - File Name:J001369-001-R-Rev0-F001.dwg

Page 29

J001369-001-R-RevO August 2021

 

APPENDIX A

Reports of Boreholes and Explanatory Notes

 

Page 30

                                                                                                                                                                                                                                                                                                                                                                   REPORT OF HAND AUGER BOREHOLE: HA1
                                                                                                                                                                                                                                                                                                                                                                       East             509106.0 m
                                                                                                                                                                                                                                                                                                                                                                       North            7080405.0 m MGA94 Zone 56                                     Sheet               1 OF 1
                                                                                                                                                                                                                                              Client                            RG Strategic                                                                           Surface RL       31.50 m AHD                                                   Logged:             MD
                                                                                                                                                                                                                                              Project                           Proposed Development                                                                   Contractor       Core Consultants                                              Logged Date:        03/08/21
                                                                                                                                                                                                                                              Location                          23 Bottlebrush Avenue, Noosa Heads                                                     Drill Rig        Hand Auger                                                    Checked:            MC
                                                                                                                                                                                                                                              Job No.                           J001369                                                                                Inclination      -90° Hole Dia. 100 mm                                         Checked Date:       17/08/21

                                                                                                                                                                                                                                                             Drilling                                   Sampling                                                                                      Field Material Description




                                                                                                                                                                                                                                                                                                                                             GROUP SYMBOL




                                                                                                                                                                                                                                                                                                                                                                                                                                CONSISTENCY
                                                                                                                                                                                                                                               PENETRATION




                                                                                                                                                                                                                                                                                                                                                                                                                                                          DCP TEST




                                                                                                                                                                                                                                                                                                                       RECOVERED
                                                                                                                                                                                                                                               RESISTANCE




                                                                                                                                                                                                                                                                                                                                                                                                                                CONDITION
                                                                                                                                                                                                                                                                                                                                                                                                                                MOISTURE
                                                                                                                                                                                                                                                                                                      SAMPLE OR




                                                                                                                                                                                                                                                                                                                                   GRAPHIC




                                                                                                                                                                                                                                                                                                                                                                                                                                DENSITY
                                                                                                                                                                                                                                     METHOD




                                                                                                                                                                                                                                                                                                                                                                      SOIL/ROCK MATERIAL DESCRIPTION                                                   Blows per 100 mm
                                                                                                                                                                                                                                                                               (metres)




                                                                                                                                                                                                                                                                                                      FIELD TEST
                                                                                                                                                                                                                                                             WATER

                                                                                                                                                                                                                                                                               DEPTH




                                                                                                                                                                                                                                                                                                                                   LOG
                                                                                                                                                                                                                                                                                          DEPTH                                                                                                                                               0   5           10     15    20   25
                                                                                                                                                                                                                                                                                           RL
                                                                                                                                                                                                                                                                               0.0
                                                                                                                                                                                                                                                                                          31.50                                              SP-            TOPSOIL SAND with silt trace cobbles: fine to medium grained,
                                                                                                                                                                                                                                                                                                                                             SM             dark brown and pale grey; cobbles up to 200 mm in diameter;
                                                                                                                                                                                                                                                                                          0.18                                                              rootlets up to 4 mm in diameter.
                                                                                                                                                                                                                                                                                          31.32                                              SP-
                                                                                                                                                                                                                                                                                                                                                            FILL SAND with silt: fine to medium grained, dark brown and pale     D
                                                                                                                                                                                                                                                                                                                                             SM
                                                                                                                                                                                                                                                                                                                                                            grey.

                                                                                                                                                                                                                                                                                                  DS 0.37-0.50 m
                                                                                                                                                                                                                                                                                          0.50
                                                                                                                                                                                                                                                                               0.5
                                                                                                                                                                                                                                                                                          31.00   DS 0.50-0.95 m                             SP-            Possibly FILL SAND with silt: fine to medium grained, dark brown;
                                                                                                                                                                                                                                                  M                                                                                          SM             occasional rootlets and organics up to 5 mm in diameter.
                                                                                                                                                                                                                                                                                                                                                                                                                                       L




                                                                                                                                                                                                                                                                                          1.00
                                                                                                                                                                                                                                                                               1.0
                                                                                                                                                                                                                                                                                          30.50                                              SP-            SAND (AEOLIAN SOIL) with silt: fine to medium grained, grey
                                                                                                                                                                                                                                                                                                                                             SM             brown and pale grey.
                                                                                                                                                                                                                                                                                          1.20
                                                                                                                                                                                                                                                                                          30.30                                                             Trace silt: pale grey with grey brown.
CORE 2.01.1 LIB.GLB Log IS AU BOREHOLE 3 J001369 RGSTRATEGIC-23 BOTTLEBRUSH AVE-BH1, BH2.GPJ <<DrawingFile>> 18/8/2021 17:55 10.02.00.04 Datgel Lab and In Situ Tool - DGD | Lib: Core 2.01.1 2020-05-19 Prj: Core 2.00 2020-03-24




                                                                                                                                                                                                                                                                                                                                                                                                                                      L-
                                                                                                                                                                                                                                                                               1.5                                                                                                                                                    MD




                                                                                                                                                                                                                                               M-H
                                                                                                                                                                                                                                                             Not Encountered
                                                                                                                                                                                                                                     HA




                                                                                                                                                                                                                                                                               2.0



                                                                                                                                                                                                                                                                                                  DS 2.20-2.50 m                                                                                                                D-M



                                                                                                                                                                                                                                                                               2.5




                                                                                                                                                                                                                                                                                                                                                                                                                                       D
                                                                                                                                                                                                                                                                                          2.90
                                                                                                                                                                                                                                                                                          28.60                                                             Silt no longer observed.
                                                                                                                                                                                                                                                                               3.0



                                                                                                                                                                                                                                                  H



                                                                                                                                                                                                                                                                               3.5




                                                                                                                                                                                                                                                                                           4.00
                                                                                                                                                                                                                                                                               4.0
                                                                                                                                                                                                                                                                                                                                                            Hole Terminated at 4.00 m
                                                                                                                                                                                                                                                                                                                                                            Target depth
                                                                                                                                                                                                                                                                                                                                                            Backfilled on completion




                                                                                                                                                                                                                                                                               4.5




                                                                                                                                                                                                                                                                               5.0
                                                                                                                                                                                                                                                                                              This report must be read in conjunction with accompanying notes and abbreviations. It has been prepared for geotechnical
                                                                                                                                                                                                                                                                                             purposes only, without attempt to assess possible contamination. Any references to potential contamination are for information
                                                                                                                                                                                                                                                                                                          only and do not necessarily indicate the presence or absence of soil or groundwater contamination.

Page 31

                                                                                                                                                                                                                                                                                                                                                                   REPORT OF HAND AUGER BOREHOLE: HA2
                                                                                                                                                                                                                                                                                                                                                                       East             509131.0 m
                                                                                                                                                                                                                                                                                                                                                                       North            7080418.0 m MGA94 Zone 56                                   Sheet               1 OF 1
                                                                                                                                                                                                                                              Client                            RG Strategic                                                                           Surface RL       36.00 m AHD                                                 Logged:             MD
                                                                                                                                                                                                                                              Project                           Proposed Development                                                                   Contractor       Core Consultants                                            Logged Date:        03/08/21
                                                                                                                                                                                                                                              Location                          23 Bottlebrush Avenue, Noosa Heads                                                     Drill Rig        Hand Auger                                                  Checked:            MC
                                                                                                                                                                                                                                              Job No.                           J001369                                                                                Inclination      -90° Hole Dia. 100 mm                                       Checked Date:       17/08/21

                                                                                                                                                                                                                                                             Drilling                                   Sampling                                                                                       Field Material Description




                                                                                                                                                                                                                                                                                                                                             GROUP SYMBOL




                                                                                                                                                                                                                                                                                                                                                                                                                              CONSISTENCY
                                                                                                                                                                                                                                               PENETRATION




                                                                                                                                                                                                                                                                                                                                                                                                                                                        DCP TEST




                                                                                                                                                                                                                                                                                                                       RECOVERED
                                                                                                                                                                                                                                               RESISTANCE




                                                                                                                                                                                                                                                                                                                                                                                                                              CONDITION
                                                                                                                                                                                                                                                                                                                                                                                                                              MOISTURE
                                                                                                                                                                                                                                                                                                      SAMPLE OR




                                                                                                                                                                                                                                                                                                                                   GRAPHIC




                                                                                                                                                                                                                                                                                                                                                                                                                              DENSITY
                                                                                                                                                                                                                                     METHOD




                                                                                                                                                                                                                                                                                                                                                                      SOIL/ROCK MATERIAL DESCRIPTION                                                 Blows per 100 mm
                                                                                                                                                                                                                                                                               (metres)




                                                                                                                                                                                                                                                                                                      FIELD TEST
                                                                                                                                                                                                                                                             WATER

                                                                                                                                                                                                                                                                               DEPTH




                                                                                                                                                                                                                                                                                                                                   LOG
                                                                                                                                                                                                                                                                                          DEPTH                                                                                                                                             0   5           10     15    20   25
                                                                                                                                                                                                                                                                                           RL
                                                                                                                                                                                                                                                                               0.0
                                                                                                                                                                                                                                                                                          36.00                                              SP             TOPSOIL SAND: fine to medium grained, pale grey; rootlets up to
                                                                                                                                                                                                                                                                                          0.10
                                                                                                                                                                                                                                                                                                                                                            4 mm in diameter.
                                                                                                                                                                                                                                                                                          35.90                                              SP
                                                                                                                                                                                                                                                                                                                                                            SAND (AEOLIAN SOIL): fine to medium grained, pale grey;
                                                                                                                                                                                                                                                                                                                                                            occasional roots up to 10 mm in diameter.
                                                                                                                                                                                                                                                                                          0.30
                                                                                                                                                                                                                                                                                                                                                                                                                               D
                                                                                                                                                                                                                                                                                          35.70                                                             With silt: grey brown.

                                                                                                                                                                                                                                                                               0.5
                                                                                                                                                                                                                                                                                          0.60
                                                                                                                                                                                                                                                  M                                                                                                                                                                                  L
                                                                                                                                                                                                                                                                                          35.40                                                             Trace silt: grey brown and pale grey.




                                                                                                                                                                                                                                                                               1.0


                                                                                                                                                                                                                                                                                          1.20
                                                                                                                                                                                                                                                                                          34.80                                                             Pale grey with grey brown; silt no longer observed.
CORE 2.01.1 LIB.GLB Log IS AU BOREHOLE 3 J001369 RGSTRATEGIC-23 BOTTLEBRUSH AVE-BH1, BH2.GPJ <<DrawingFile>> 18/8/2021 17:55 10.02.00.04 Datgel Lab and In Situ Tool - DGD | Lib: Core 2.01.1 2020-05-19 Prj: Core 2.00 2020-03-24




                                                                                                                                                                                                                                                                                                                                                                                                                                    MD

                                                                                                                                                                                                                                                                               1.5
                                                                                                                                                                                                                                                             Not Encountered
                                                                                                                                                                                                                                     HA




                                                                                                                                                                                                                                                                               2.0




                                                                                                                                                                                                                                                                                                                                                                                                                              D-M


                                                                                                                                                                                                                                                                               2.5
                                                                                                                                                                                                                                               M-H

                                                                                                                                                                                                                                                                                                                                                                                                                                     D



                                                                                                                                                                                                                                                                               3.0




                                                                                                                                                                                                                                                                               3.5




                                                                                                                                                                                                                                                                                           4.00
                                                                                                                                                                                                                                                                               4.0
                                                                                                                                                                                                                                                                                                                                                            Hole Terminated at 4.00 m
                                                                                                                                                                                                                                                                                                                                                            Target depth
                                                                                                                                                                                                                                                                                                                                                            Backfilled on completion




                                                                                                                                                                                                                                                                               4.5




                                                                                                                                                                                                                                                                               5.0
                                                                                                                                                                                                                                                                                              This report must be read in conjunction with accompanying notes and abbreviations. It has been prepared for geotechnical
                                                                                                                                                                                                                                                                                             purposes only, without attempt to assess possible contamination. Any references to potential contamination are for information
                                                                                                                                                                                                                                                                                                          only and do not necessarily indicate the presence or absence of soil or groundwater contamination.

Page 32

                                              EXPLANATION OF NOTES, ABBREVIATIONS & TERMS
                                              USED ON BOREHOLE AND TEST PIT REPORTS
DRILLING/EXCAVATION METHOD
AS       Auger Screwing                  RD             Rotary blade or drag bit                  NQ           Diamond Core - 47 mm
AD       Auger Drilling                  RT             Rotary Tricone bit                        NMLC         Diamond Core - 52 mm
*V       V - Bit                         RAB            Rotary Air Blast                          HQ           Diamond Core - 63 mm
T        TC - Bit, e.g. ADT              RC             Reverse Circulation                       HMLC         Diamond Core – 63mm
HA       Hand Auger                      PT             Push Tube                                 BH           Tractor Mounted Backhoe
ADH      Hollow Auger                    CT             Cable Tool Rig                            EX           Tracked Hydraulic Excavator
DTC      Diatubre Coring                 JET            Jetting                                   EE           Existing Excavation

WB       Washbore or Bailer              NDD            Non-destructive digging                   HAND         Excavated by Hand Methods

PENETRATION/EXCAVATION RESISTANCE
L        Low resistance . Rapid penetration possible with little effort from the equipment used
M        Medium resistance. Excavation possible at an acceptable rate with moderate effort from equipment used
H        High resistance to penetration/excavation. Further penetration is possible at a slow rate
R        Refusal or Practical Refusal. No further progress possible without the risk of damage or unacceptable wear to the digging implement
         or machine.
These assessments are subjective and are dependent on many factors including the equipment power, weight, condition of excavation or drilling tools,
and the experience of the operator.

WATER
                               Water level shown at date                                                 Partial water loss
                               Water inflow                                                              Complete water loss
GROUNDWATER NOT                The observation of groundwater whether present or not, was not possible due to drilling water, surface seepage or cave in
OBSERVED                       of the borehole/test pit.
GROUND WATER NOT               The borehole/test pit was dry soon after excavation. However, groundwater could be present in less permeable strata.
ENCOUNTERED                    Inflow may have been observed had the borehole/test pit been left open for a longer period.
SAMPLING AND TESTING
SPT                   Standard Penetration Test to AS1289.6.3.1-2004
4,7,11 N=18           4,7,11 = Blows per 150mm            N = Blows per 300mm penetration following 150mm seating
30/80mm                 Where practical refusal occurs, the blows and penetration for that interval are reported
RW                    Penetration occurred under the rod weight only
HW                    Penetration occurred under the hammer and rod weight only
HB                    Hammer double bouncing on anvil
DS                    Disturbed Sample
BDS                   Bulk disturbed sample
G                     Gas Sample
W                     Water sample
FP                    Field permeability test over section noted
FV                    Field vane shear test expressed as uncorrected shear strength (sv = peak value)
PID                   Photoionisation Detector reading in ppm
PM                    Pressuremeter test over section noted
PP                    Pocket penetrometer test expressed as instrument reading in kPa
U63                   Thin walled tube sample - number indicates nominal sample diameter in millimetres
WPT                   Water pressure tests
DCP                   Dynamic cone penetration test
CPT                   Dynamic cone penetration test

CPTu                  Static cone penetration test with pore pressure (u) measurement

ROCK CORE RECOVERY

        TCR = Total Core Recovery (%)                         SCR = Solid Core Recovery (%)                        RQD = Rock Quantity Designation (%)

Page 33

                                            METHOD OF SOIL DESCRIPTION USED ON BOREHOLE AND TEST PIT
                                            REPORTS
                           FILL                                                          CLAY (CL,CI, or CH)

                           GRAVEL (GP or SW)                                             ORGANIC SOILS (OL or OH or Pt)


                           SAND (SP or SW)                                               COBBLES or BOULDERS

                           SILT (ML or MH)

Combinations of these basic symbols may be used to indicate mixed materials such as sandy clay.

CLASSIFICATION AND INFERRED STRATIGRAPHY
Soil and Rock is classified and described in Reports of Boreholes and Test Pits using the preferred method given in AS 1726 - 2017. The material proper-
ties are assessed in the field by visual/tactile methods.

                         PARTICLE SIZE                                                                  PLASTIC PROPERTIES

      Major
                    Sub Division               Particle Size
     Division

               Boulders                          >200 mm

               Cobbles                         63 - 200 mm

      Gravel              Coarse               20 - 63 mm

      Gravel             Medium                6.7 - 20 mm

      Gravel               Fine               2.36 - 6.7 mm

      Sand                Coarse              0.6 - 2.36 mm

      Sand               Medium               0.21 - 0.6 mm

      Sand                 Fine             0.075 - 0.21 mm


                 Silt                    0.002 - 0.075 mm

                Clay                           <0.002 mm

MOISTURE CONDITION FOR COARSE GRAINED SOIL                        AS 1726 - 2017

Symbol             Term                                           Description

D                  Dry                                            Non-cohesive and free running

M                  Moist                                          Soil feels cool, darkened in colour, tends to stick together

W                  Wet                                            Soil feels cool, darkened in colour, soil sticks together, free water forms when handling

MOISTURE CONDITION FOR FINE GRAINED SOIL                          AS1726 - 2017


Symbol             Term                                           Description
W<PL               Moist dry of liquid limit                      Hard and friable or powdery
W = PL             Moist near plastic limit                       Soils can be molded at a moisture condition approximately equal to the plastic limit
W >PL              Moist, wet of plastic limit                    Soils usually weakened and free water forms on hands when handling
W = LL             Wet near plastic limit
W > LL             Wet, wet of liquid limit
CONSISTENCY TERMS FOR                           AS1726—2017           RELATIVE DENSITY OF COARSE GRAINED SOILS                                   AS1726—2017
COHESIVE SOILS
                                                                      Symbol                 Term                      Density Index %           SPT ‘N’ #
Symbol           Term                           Undrained Shear
                                                                      VL                     Very Loose                Less than 15              0 to 4
                                                Strength
                                                                      L                      Loose                     15 to 35                  4 to 10
VS               Very Soft                      0 to 12 kPa

S                Soft                           12 to 25 kPa          MD                     Medium Dense              35 to 65                  10 to 30

F                Firm                           25 to 50 kPa          D                      Dense                     65 to 85                  30 to 50

St               Stiff                          50 to 100 kPa         VD                     Very Dense                Above 85                  Above 50

VSt              Very Stiff                     100 to 200 kPa        In the absence of test results, consistency and density may be assessed from correlations with
                                                                      the observed behaviour of the material.
H                Hard                           Above 200 kPa

Page 34

                                              TERMS FOR ROCK MATERIAL STRENGTH & WEATHERING AND
                                              ABBREVIATIONS FOR DEFECT DESCRIPTIONS
ROCK MATERIAL STRENGTH CLASSIFICATION                                 AS1726—2017

Symbol          Term               Uniaxial         Point Load                                                Field Guide
                                                   Strength Is (50)
                                Compressive
                                                       (MPa)
                               Strength (MPa)
VL        Very Low             0.6 to 2            0.03 to 0.1        Material crumbles under firm blows with sharp end of pick. Pieces up to 30 mm thick can
          Strength                                                    be broken with finger pressure.

L         Low Strength         2 to 6              0.1 to 0.3         Easily scored with knife. Indentations 1 mm to 3 mm show in the specimen with firm
                                                                      blows of the pick point. A piece of core 150 mm by 50 mm may be broken by hand. Sharp
                                                                      edges of core are friable and break during handling.

M         Medium               6 to 20             0.3 to 1           Readily scored with a knife. A piece of core 150 mm by 50 mm can be broken by hand
          Strength                                                    with difficulty.

H         High Strength        20 to 60            1 to 3             A piece of core 150 mm by 50 mm cannot be broken by hand but can be broken by a pick
                                                                      with a single firm blow. Rock rings under hammer.

VH        Very High            60 to 200           3 to 10            Hand specimen breaks with pick after more than one blow. Rock rings under hammer.
          Strength

EH        Extremely High       Above 200           Above 10           Specimen requires many blows with geological pick to break through intact material. Rock
          Strength                                                    rings under hammer.

       = Diametral Point Load Test                  = Axial Point Load Test

CLASSIFICATION OF MATERIAL                        AS1726—2017
WEATHERING
     Symbol                   Term                                                                  Field Guide
RS                  Residual Soil (Note 1)        Material is weathered to such an extent that it has soil properties. Mass structure and material texture and
                                                  fabric of original rock are no longer visible but the soil has not been significantly transported.

XW                  Extremely Weathered           Material is weathered to such an extent that is has soil properties. Mass structure and material texture and
                    (Note 1)                      fabric of original rock are still visible.

HW                  Highly Weathered (Note 2) The whole rock mass is discoloured, usually by iron staining or beaching to the extent that the colour of the
                                              original rock is not recognizable. Rock strength is significantly changed by weathering. Some primary miner-
                                              als have weathered to clay minerals. Porosity may be increased by leaching, or may be decreased due to
                                              deposition of weathering products in pores.

MH                  Moderately Weathered          The whole of the rock material is discoloured, usually by iron staining or bleaching to the extent that the
                    (Note 2)                      colour of the original rock is not recognizable, but shows little or no change in strength from fresh rock.

SW                  Slightly Weathered            Pock is partially discoloured with staining or bleaching along joints but shows little or no change of strength
                                                  from fresh rock.

FR                  Fresh                         Rock shows no signs of decomposition of individual minerals or colour change.

Note 1              The term ‘Extremely Weathered rock’ is misleading as the material has soil properties. The word ‘rock’ should be replaced with the name
                    of the original rock of the word ‘material’, eg. Extremely Weathered granite or Extremely Weathered material.

Note 2              Where it is not possible to distinguish between ‘Highly Weathered’ and ‘Moderately Weathered’ rock the term ‘Distinctly Weathered’ may
                    be used.
                       DEFECT TYPE/DESCRIPTION                                           DEFECT PROFILE                          DEFECT ROUGHNESS
                                                                               Symbol               Description                       DESCRIPTION
B           Bedding Parting               V           Vein
                                                                               PL                   Planar
                                                                                                                         Symbol               Description
J           Joint                         HB/DB       Handling/Drilling        St                   Stepped
                                                      Break                                                              Sl                   Slickenside
                                                                               Un                   Undulating
EW          Extremely Weathered           C           Contact                                                            Sm                   Smooth
                                                                                    DEFECT INFILL DESCRIPTION
            Seam
                                                                               Symbol               Description          Ro                   Rough
FZ          Fracture Zone                 L           Cleavage                                                           Vertical Boreholes - The dip
                                                                               Cn                   Clean: No visible
                                                                                                    coating              (inclination from horizontal) for the
CZ/S        Crushed Zone/Seam             X           Foliation                                                          defect is given.
                                                                               Sn                   Stain: Coated 1 to
                                                                                                    3 mm               Inclined Boreholes - The inclination
IS          Infilled Seam                 S           Schistocity                                                      is measured as the acute angle to the
                                                                               Vr                   Veneer: < 1 mm     core axis.
SZ/S        Sheared Zone/Seam                                                  Ct                   Coating: 1 to 3
                                                                                                    mm

Page 35

J001369-001-R-Rev0                                August 2021




APPENDIX B
AGS Practice Note Guidelines for Landslide Risk
Management

Page 36

                                      PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
                                                              APPENDIX C: LANDSLIDE RISK ASSESSMENT
                                    QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY


   QUALITATIVE MEASURES OF LIKELIHOOD

Approximate Annual Probability
                                             Implied Indicative Landslide
                                                                                                                     Description                                           Descriptor               Level
Indicative          Notional                    Recurrence Interval
  Value             Boundary
   10-1                5x10-2
                                              10 years                           The event is expected to occur over the design life.                                ALMOST CERTAIN                   A
                                                                    20 years     The event will probably occur under adverse conditions over the
        -2
   10                                      100 years
                                                                                 design life.
                                                                                                                                                                     LIKELY                           B
                            -3
     -3               5x10                                       200 years
   10                                      1000 years                            The event could occur under adverse conditions over the design life.                POSSIBLE                         C
                      5x10-4                                     2000 years
                                                                                 The event might occur under very adverse circumstances over the
   10-4                                   10,000 years
                                                                                 design life.
                                                                                                                                                                     UNLIKELY                         D
     -5               5x10-5                                     20,000 years
   10                                                                            The event is conceivable but only under exceptional circumstances
                                         100,000 years                                                                                                               RARE                             E
                                                                                 over the design life.
     -6                5x10-6                                    200,000 years
   10                                   1,000,000 years                          The event is inconceivable or fanciful over the design life.                        BARELY CREDIBLE                  F
   Note:     (1)   The table should be used from left to right; use Approximate Annual Probability or Description to assign Descriptor, not vice versa.


   QUALITATIVE MEASURES OF CONSEQUENCES TO PROPERTY

  Approximate Cost of Damage
                                                                                               Description                                                                 Descriptor               Level
Indicative           Notional
  Value              Boundary
                                         Structure(s) completely destroyed and/or large scale damage requiring major engineering works for
   200%                                                                                                                                                             CATASTROPHIC                      1
                                         stabilisation. Could cause at least one adjacent property major consequence damage.
                     100%
                                         Extensive damage to most of structure, and/or extending beyond site boundaries requiring significant
   60%                                                                                                                                                              MAJOR                             2
                                         stabilisation works. Could cause at least one adjacent property medium consequence damage.
                       40%
                                         Moderate damage to some of structure, and/or significant part of site requiring large stabilisation works.
   20%                                                                                                                                                              MEDIUM                            3
                                         Could cause at least one adjacent property minor consequence damage.
                       10%
    5%                 1%                Limited damage to part of structure, and/or part of site requiring some reinstatement stabilisation works.                 MINOR                             4
                                         Little damage. (Note for high probability event (Almost Certain), this category may be subdivided at a
   0.5%                                                                                                                                                             INSIGNIFICANT                     5
                                         notional boundary of 0.1%. See Risk Matrix.)
   Notes:    (2)   The Approximate Cost of Damage is expressed as a percentage of market value, being the cost of the improved value of the unaffected property which includes the land plus the
                   unaffected structures.
             (3)   The Approximate Cost is to be an estimate of the direct cost of the damage, such as the cost of reinstatement of the damaged portion of the property (land plus structures), stabilisation
                   works required to render the site to tolerable risk level for the landslide which has occurred and professional design fees, and consequential costs such as legal fees, temporary
                   accommodation. It does not include additional stabilisation works to address other landslides which may affect the property.
             (4)   The table should be used from left to right; use Approximate Cost of Damage or Description to assign Descriptor, not vice versa


   91                                                          Australian Geomechanics Vol 42 No 1 March 2007

Page 37

                                        PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
                APPENDIX C: – QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY (CONTINUED)


      QUALITATIVE RISK ANALYSIS MATRIX – LEVEL OF RISK TO PROPERTY
                      LIKELIHOOD                                                  CONSEQUENCES TO PROPERTY (With Indicative Approximate Cost of Damage)
                                           Indicative Value of         1: CATASTROPHIC                 2: MAJOR                3: MEDIUM                4: MINOR                    5:
                                          Approximate Annual                 200%                         60%                      20%                     5%                INSIGNIFICANT
                                              Probability                                                                                                                         0.5%
A –    ALMOST CERTAIN                              10-1                          VH                         VH                      VH                       H                   M or L (5)
                                                     -2
B -    LIKELY                                      10                            VH                         VH                       H                       M                       L
C -    POSSIBLE                                    10-3                          VH                          H                       M                       M                      VL

D -    UNLIKELY                                    10-4                           H                         M                        L                       L                      VL
                                                     -5
E -    RARE                                        10                             M                          L                       L                      VL                      VL
                                                     -6
F -    BARELY CREDIBLE                             10                             L                         VL                      VL                      VL                      VL
      Notes:    (5)   For Cell A5, may be subdivided such that a consequence of less than 0.1% is Low Risk.
                (6)   When considering a risk assessment it must be clearly stated whether it is for existing conditions or with risk control measures which may not be implemented at the current
                      time.


      RISK LEVEL IMPLICATIONS
                         Risk Level                                                                                  Example Implications (7)
                                                                  Unacceptable without treatment. Extensive detailed investigation and research, planning and implementation of treatment
           VH                    VERY HIGH RISK                   options essential to reduce risk to Low; may be too expensive and not practical. Work likely to cost more than value of the
                                                                  property.
                                                                  Unacceptable without treatment. Detailed investigation, planning and implementation of treatment options required to reduce
           H                          HIGH RISK
                                                                  risk to Low. Work would cost a substantial sum in relation to the value of the property.
                                                                  May be tolerated in certain circumstances (subject to regulator’s approval) but requires investigation, planning and
           M                     MODERATE RISK                    implementation of treatment options to reduce the risk to Low. Treatment options to reduce to Low risk should be
                                                                  implemented as soon as practicable.
                                                                  Usually acceptable to regulators. Where treatment has been required to reduce the risk to this level, ongoing maintenance is
           L                          LOW RISK
                                                                  required.
                                                                  Acceptable. Manage by normal slope maintenance procedures.
           VL                     VERY LOW RISK

       Note:    (7)   The implications for a particular situation are to be determined by all parties to the risk assessment and may depend on the nature of the property at risk; these are only
                      given as a general guide.




      92                         Australian Geomechanics Vol 42 No 1 March 2007

Page 38

J001369-001-R-RevO August 2021

 

APPENDIX C

Guidelines for Hillside Construction

 

Page 39

     PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007



          APPENDIX G - SOME GUIDELINES FOR HILLSIDE CONSTRUCTION

                 GOOD ENGINEERING PRACTICE                                                            POOR ENGINEERING PRACTICE
ADVICE
GEOTECHNICAL     Obtain advice from a qualified, experienced geotechnical practitioner at early       Prepare detailed plan and start site works before
ASSESSMENT       stage of planning and before site works.                                             geotechnical advice.
PLANNING
SITE PLANNING    Having obtained geotechnical advice, plan the development with the risk              Plan development without regard for the Risk.
                 arising from the identified hazards and consequences in mind.
DESIGN AND CONSTRUCTION
                 Use flexible structures which incorporate properly designed brickwork, timber        Floor plans which require extensive cutting and
                 or steel frames, timber or panel cladding.                                           filling.
 HOUSE DESIGN
                 Consider use of split levels.                                                        Movement intolerant structures.
                 Use decks for recreational areas where appropriate.
SITE CLEARING    Retain natural vegetation wherever practicable.                                      Indiscriminately clear the site.
    ACCESS &     Satisfy requirements below for cuts, fills, retaining walls and drainage.            Excavate and fill for site access before
   DRIVEWAYS     Council specifications for grades may need to be modified.                           geotechnical advice.
                 Driveways and parking areas may need to be fully supported on piers.
EARTHWORKS       Retain natural contours wherever possible.                                           Indiscriminatory bulk earthworks.
                 Minimise depth.                                                                      Large scale cuts and benching.
      CUTS       Support with engineered retaining walls or batter to appropriate slope.              Unsupported cuts.
                 Provide drainage measures and erosion control.                                       Ignore drainage requirements
                 Minimise height.                                                                     Loose or poorly compacted fill, which if it fails,
                 Strip vegetation and topsoil and key into natural slopes prior to filling.           may flow a considerable distance including
                 Use clean fill materials and compact to engineering standards.                       onto property below.
      FILLS      Batter to appropriate slope or support with engineered retaining wall.               Block natural drainage lines.
                 Provide surface drainage and appropriate subsurface drainage.                        Fill over existing vegetation and topsoil.
                                                                                                      Include stumps, trees, vegetation, topsoil,
                                                                                                      boulders, building rubble etc in fill.
 ROCK OUTCROPS   Remove or stabilise boulders which may have unacceptable risk.                       Disturb or undercut detached blocks or
  & BOULDERS     Support rock faces where necessary.                                                  boulders.
                 Engineer design to resist applied soil and water forces.                             Construct a structurally inadequate wall such as
                 Found on rock where practicable.                                                     sandstone flagging, brick or unreinforced
   RETAINING
                 Provide subsurface drainage within wall backfill and surface drainage on slope       blockwork.
     WALLS
                 above.                                                                               Lack of subsurface drains and weepholes.
                 Construct wall as soon as possible after cut/fill operation.
                 Found within rock where practicable.                                                 Found on topsoil, loose fill, detached boulders
                 Use rows of piers or strip footings oriented up and down slope.                      or undercut cliffs.
   FOOTINGS
                 Design for lateral creep pressures if necessary.
                 Backfill footing excavations to exclude ingress of surface water.
                 Engineer designed.
                 Support on piers to rock where practicable.
SWIMMING POOLS   Provide with under-drainage and gravity drain outlet where practicable.
                 Design for high soil pressures which may develop on uphill side whilst there
                 may be little or no lateral support on downhill side.
   DRAINAGE
                 Provide at tops of cut and fill slopes.                                              Discharge at top of fills and cuts.
                 Discharge to street drainage or natural water courses.                               Allow water to pond on bench areas.
    SURFACE      Provide general falls to prevent blockage by siltation and incorporate silt traps.
                 Line to minimise infiltration and make flexible where possible.
                 Special structures to dissipate energy at changes of slope and/or direction.
                 Provide filter around subsurface drain.                                              Discharge roof runoff into absorption trenches.
                 Provide drain behind retaining walls.
   SUBSURFACE
                 Use flexible pipelines with access for maintenance.
                 Prevent inflow of surface water.
                 Usually requires pump-out or mains sewer systems; absorption trenches may            Discharge sullage directly onto and into slopes.
    SEPTIC &
                 be possible in some areas if risk is acceptable.                                     Use absorption trenches without consideration
    SULLAGE
                 Storage tanks should be water-tight and adequately founded.                          of landslide risk.
   EROSION       Control erosion as this may lead to instability.                                     Failure to observe earthworks and drainage
  CONTROL &      Revegetate cleared area.                                                             recommendations when landscaping.
 LANDSCAPING
DRAWINGS AND SITE VISITS DURING CONSTRUCTION
   DRAWINGS      Building Application drawings should be viewed by geotechnical consultant
   SITE VISITS   Site Visits by consultant may be appropriate during construction/
INSPECTION AND MAINTENANCE BY OWNER
   OWNER’S       Clean drainage systems; repair broken joints in drains and leaks in supply
RESPONSIBILITY   pipes.
                 Where structural distress is evident see advice.
                 If seepage observed, determine causes or seek advice on consequences.




                         Australian Geomechanics Vol 42 No 1 March 2007                                                                 113

Page 40

      PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007




114             Australian Geomechanics Vol 42 No 1 March 2007

Page 41

J001369-001-R-Rev0                               August 2021




APPENDIX D
CSIRO Foundation maintenance and footing performance:
A Homeowner’s Guide

Page 42

          Foundation Maintenance
          and Footing Performance:                                                                                                                                              BTF 18-2011


          A Homeowner’s Guide
                                                                                                                                                                                  replaces
                                                                                                                                                                                Information
                                                                                                                                                                                Sheet 10/91


          Buildings can and often do move. This movement can be up, down, lateral or rotational. The fundamental cause of movement in
          buildings can usually be related to one or more problems in the foundation soil. It is important for the homeowner to identify the
          soil type in order to ascertain the measures that should be put in place in order to ensure that problems in the foundation soil can
          be prevented, thus protecting against building movement.
          This Building Technology File is designed to identify causes of soil-related building movement, and to suggest methods of
          prevention of resultant cracking in buildings.

          Soil Types                                                                                    Erosion
          The types of soils usually present under the topsoil in land zoned for                        All soils are prone to erosion, but sandy soil is particularly susceptible
          residential buildings can be split into two approximate groups –                              to being washed away. Even clay with a sand component of say 10%
          granular and clay. Quite often, foundation soil is a mixture of both                          or more can suffer from erosion.
          types. The general problems associated with soils having granular
          content are usually caused by erosion. Clay soils are subject to                              Saturation
          saturation and swell/shrink problems.                                                         This is particularly a problem in clay soils. Saturation creates a bog-
                                                                                                        like suspension of the soil that causes it to lose virtually all of its
          Classifications for a given area can generally be obtained by                                 bearing capacity. To a lesser degree, sand is affected by saturation
          application to the local authority, but these are sometimes unreliable                        because saturated sand may undergo a reduction in volume,
          and if there is doubt, a geotechnical report should be commissioned.                          particularly imported sand fill for bedding and blinding layers.
          As most buildings suffering movement problems are founded on clay                             However, this usually occurs as immediate settlement and should
          soils, there is an emphasis on classification of soils according to the                       normally be the province of the builder.
          amount of swell and shrinkage they experience with variations of
          water content. The table below is Table 2.1 from AS 2870-2011, the                            Seasonal swelling and shrinkage of soil
          Residential Slab and Footing Code.                                                            All clays react to the presence of water by slowly absorbing it, making
                                                                                                        the soil increase in volume (see table below). The degree of increase
          Causes of Movement                                                                            varies considerably between different clays, as does the degree of
          Settlement due to construction                                                                decrease during the subsequent drying out caused by fair weather
          There are two types of settlement that occur as a result of                                   periods. Because of the low absorption and expulsion rate, this
          construction:                                                                                 phenomenon will not usually be noticeable unless there are
          • Immediate settlement occurs when a building is first placed                                 prolonged rainy or dry periods, usually of weeks or months,
                                                                                                        depending on the land and soil characteristics.
            on its foundation soil, as a result of compaction of the soil under
            the weight of the structure. The cohesive quality of clay soil                              The swelling of soil creates an upward force on the footings of the
            mitigates against this, but granular (particularly sandy) soil is                           building, and shrinkage creates subsidence that takes away the
            susceptible.                                                                                support needed by the footing to retain equilibrium.
          • Consolidation settlement is a feature of clay soil and may take
                                                                                                        Shear failure
            place because of the expulsion of moisture from the soil or because
                                                                                                        This phenomenon occurs when the foundation soil does not have
            of the soil’s lack of resistance to local compressive or shear stresses.
                                                                                                        sufficient strength to support the weight of the footing. There are
            This will usually take place during the first few months after                              two major post-construction causes:
            construction, but has been known to take many years in
            exceptional cases.                                                                          • Significant load increase.
                                                                                                        • Reduction of lateral support of the soil under the footing due to
          These problems are the province of the builder and should be taken
                                                                                                          erosion or excavation.
          into consideration as part of the preparation of the site for
          construction. Building Technology File 19 (BTF 19) deals with these                           In clay soil, shear failure can be caused by saturation of the soil
          problems.                                                                                     adjacent to or under the footing.


                                                                           GENERAL DEFINITIONS OF SITE CLASSES
                 Class                                                                              Foundation
                   A          Most sand and rock sites with little or no ground movement from moisture changes
                   S          Slightly reactive clay sites, which may experience only slight ground movement from moisture changes
                   M          Moderately reactive clay or silt sites, which may experience moderate ground movement from moisture changes
                  H1          Highly reactive clay sites, which may experience high ground movement from moisture changes
                  H2          Highly reactive clay sites, which may experience very high ground movement from moisture changes
                   E          Extremely reactive sites, which may experience extreme ground movement from moisture changes
          Notes
          1. Where controlled fill has been used, the site may be classified A to E according to the type of fill used.
          2. Filled sites. Class P is used for sites which include soft fills, such as clay or silt or loose sands; landslip; mine subsidence; collapsing soils; soil subject to erosion;
             reactive sites subject to abnormal moisture conditions or sites which cannot be classified otherwise.
          3. Where deep-seated moisture changes exist on sites at depths of 3 m or greater, further classification is needed for Classes M to E (M-D, H1-D, H2-D and E-D).




081203 BTF 18 3pp.indd 1                                                                                                                                                                    25/10/12 12:40:29

Page 43

          Tree root growth
                                                                                                   Trees can cause shrinkage and damage
          Trees and shrubs that are allowed to grow in the vicinity of footings
          can cause foundation soil movement in two ways:
          • Roots that grow under footings may increase in cross-sectional
            size, exerting upward pressure on footings.
          • Roots in the vicinity of footings will absorb much of the moisture
            in the foundation soil, causing shrinkage or subsidence.

          Unevenness of Movement
          The types of ground movement described above usually occur                            Wall cracking
          unevenly throughout the building’s foundation soil. Settlement due                    due to uneven
                                                                                                looting settlement
          to construction tends to be uneven because of:
          • Differing compaction of foundation soil prior to construction.
          • Differing moisture content of foundation soil prior to
            construction.
          Movement due to non-construction causes is usually more uneven                external footings. The doming is accentuated and cracking reduces
          still. Erosion can undermine a footing that traverses the flow or can         or disappears where it occurred because of dishing, but other cracks
          create the conditions for shear failure by eroding soil adjacent to a         open up. The roof lines may become convex.
          footing that runs in the same direction as the flow.
                                                                                        Doming and dishing are also affected by weather in other ways. In
          Saturation of clay foundation soil may occur where subfloor walls create      areas where warm, wet summers and cooler dry winters prevail, water
          a dam that makes water pond. It can also occur wherever there is a            migration tends to be toward the interior and doming will be
          source of water near footings in clay soil. This leads to a severe            accentuated, whereas where summers are dry and winters are cold
          reduction in the strength of the soil which may create local shear failure.   and wet, migration tends to be toward the exterior and the
          Seasonal swelling and shrinkage of clay soil affects the perimeter of         underlying propensity is toward dishing.
          the building first, then gradually spreads to the interior. The swelling
          process will usually begin at the uphill extreme of the building, or on       Movement caused by tree roots
          the weather side where the land is flat. Swelling gradually reaches the       In general, growing roots will exert an upward pressure on footings,
          interior soil as absorption continues. Shrinkage usually begins where         whereas soil subject to drying because of tree or shrub roots will tend
          the sun’s heat is greatest.                                                   to remove support from under footings by inducing shrinkage.

          Effects of Uneven Soil Movement on Structures                                 Complications caused by the structure itself
                                                                                        Most forces that the soil causes to be exerted on structures are
          Erosion and saturation                                                        vertical – i.e. either up or down. However, because these forces are
          Erosion removes the support from under footings, tending to create            seldom spread evenly around the footings, and because the building
          subsidence of the part of the structure under which it occurs.                resists uneven movement because of its rigidity, forces are exerted
          Brickwork walls will resist the stress created by this removal of             from one part of the building to another. The net result of all these
          support by bridging the gap or cantilevering until the bricks or the          forces is usually rotational. This resultant force often complicates the
          mortar bedding fail. Older masonry has little resistance. Evidence of         diagnosis because the visible symptoms do not simply reflect the
          failure varies according to circumstances and symptoms may include:           original cause. A common symptom is binding of doors on the
          • Step cracking in the mortar beds in the body of the wall or above/          vertical member of the frame.
            below openings such as doors or windows.
          • Vertical cracking in the bricks (usually but not necessarily in line        Effects on full masonry structures
            with the vertical beds or perpends).                                        Brickwork will resist cracking where it can. It will attempt to span
                                                                                        areas that lose support because of subsided foundations or raised
          Isolated piers affected by erosion or saturation of foundations will          points. It is therefore usual to see cracking at weak points, such as
          eventually lose contact with the bearers they support and may tilt or         openings for windows or doors.
          fall over. The floors that have lost this support will become bouncy,
                                                                                        In the event of construction settlement, cracking will usually remain
          sometimes rattling ornaments etc.
                                                                                        unchanged after the process of settlement has ceased.
          Seasonal swelling/shrinkage in clay                                           With local shear or erosion, cracking will usually continue to develop
          Swelling foundation soil due to rainy periods first lifts the most exposed    until the original cause has been remedied, or until the subsidence
          extremities of the footing system, then the remainder of the perimeter        has completely neutralised the affected portion of footing and the
          footings while gradually permeating inside the building footprint to lift     structure has stabilised on other footings that remain effective.
          internal footings. This swelling first tends to create a dish effect,         In the case of swell/shrink effects, the brickwork will in some cases
          because the external footings are pushed higher than the internal ones.       return to its original position after completion of a cycle, however it
          The first noticeable symptom may be that the floor appears slightly           is more likely that the rotational effect will not be exactly reversed,
          dished. This is often accompanied by some doors binding on the                and it is also usual that brickwork will settle in its new position and
          floor or the door head, together with some cracking of cornice                will resist the forces trying to return it to its original position. This
          mitres. In buildings with timber flooring supported by bearers and            means that in a case where swelling takes place after construction
          joists, the floor can be bouncy. Externally there may be visible              and cracking occurs, the cracking is likely to at least partly remain
          dishing of the hip or ridge lines.                                            after the shrink segment of the cycle is complete. Thus, each time the
          As the moisture absorption process completes its journey to the               cycle is repeated, the likelihood is that the cracking will become
          innermost areas of the building, the internal footings will rise. If the      wider until the sections of brickwork become virtually independent.
          spread of moisture is roughly even, it may be that the symptoms will          With repeated cycles, once the cracking is established, if there is no
          temporarily disappear, but it is more likely that swelling will be            other complication, it is normal for the incidence of cracking to
          uneven, creating a difference rather than a disappearance in                  stabilise, as the building has the articulation it needs to cope with the
          symptoms. In buildings with timber flooring supported by bearers              problem. This is by no means always the case, however, and monitoring
          and joists, the isolated piers will rise more easily than the strip           of cracks in walls and floors should always be treated seriously.
          footings or piers under walls, creating noticeable doming of flooring.        Upheaval caused by growth of tree roots under footings is not a
          As the weather pattern changes and the soil begins to dry out, the            simple vertical shear stress. There is a tendency for the root to also
          external footings will be first affected, beginning with the locations        exert lateral forces that attempt to separate sections of brickwork
          where the sun’s effect is strongest. This has the effect of lowering the      after initial cracking has occurred.




081203 BTF 18 3pp.indd 2                                                                                                                                     25/10/12 12:40:49

Page 44

          The normal structural arrangement is that the inner leaf of                   • Corroded guttering or downpipes can spill water to ground.
          brickwork in the external walls and at least some of the internal walls       • Downpipes not positively connected to a proper stormwater
          (depending on the roof type) comprise the load-bearing structure on             collection system will direct a concentration of water to soil that is
          which any upper floors, ceilings and the roof are supported. In these           directly adjacent to footings, sometimes causing large-scale
          cases, it is internally visible cracking that should be the main focus of       problems such as erosion, saturation and migration of water under
          attention, however there are a few examples of dwellings whose                  the building.
          external leaf of masonry plays some supporting role, so this should be
          checked if there is any doubt. In any case, externally visible cracking       Seriousness of Cracking
          is important as a guide to stresses on the structure generally, and it
          should also be remembered that the external walls must be capable of          In general, most cracking found in masonry walls is a cosmetic
          supporting themselves.                                                        nuisance only and can be kept in repair or even ignored. The table
                                                                                        below is a reproduction of Table C1 of AS 2870-2011.
          Effects on framed structures                                                  AS 2870-2011 also publishes figures relating to cracking in concrete
          Timber or steel framed buildings are less likely to exhibit cracking due      floors, however because wall cracking will usually reach the critical
          to swell/shrink than masonry buildings because of their flexibility.          point significantly earlier than cracking in slabs, this table is not
          Also, the doming/dishing effects tend to be lower because of the              reproduced here.
          lighter weight of walls. The main risks to framed buildings are
          encountered because of the isolated pier footings used under walls.           Prevention/Cure
          Where erosion or saturation causes a footing to fall away, this can
          double the span which a wall must bridge. This additional stress can          Plumbing
          create cracking in wall linings, particularly where there is a weak           Where building movement is caused by water service, roof
          point in the structure caused by a door or window opening. It is,             plumbing, sewer or stormwater failure, the remedy is to repair the
          however, unlikely that framed structures will be so stressed as to suffer     problem. It is prudent, however, to consider also rerouting pipes
          serious damage without first exhibiting some or all of the above              away from the building where possible, and relocating taps to
          symptoms for a considerable period. The same warning period should            positions where any leakage will not direct water to the building
          apply in the case of upheaval. It should be noted, however, that where        vicinity. Even where gully traps are present, there is sometimes
          framed buildings are supported by strip footings there is only one leaf       sufficient spill to create erosion or saturation, particularly in modern
          of brickwork and therefore the externally visible walls are the               installations using smaller diameter PVC fixtures. Indeed, some
          supporting structure for the building. In this case, the subfloor             gully traps are not situated directly under the taps that are installed
          masonry walls can be expected to behave as full brickwork walls.              to charge them, with the result that water from the tap may enter
                                                                                        the backfilled trench that houses the sewer piping. If the trench has
          Effects on brick veneer structures                                            been poorly backfilled, the water will either pond or flow along the
          Because the load-bearing structure of a brick veneer building is the          bottom of the trench. As these trenches usually run alongside the
          frame that makes up the interior leaf of the external walls plus              footings and can be at a similar depth, it is not hard to see how any
          perhaps the internal walls, depending on the type of roof, the                water that is thus directed into a trench can easily affect the
          building can be expected to behave as a framed structure, except that         foundation’s ability to support footings or even gain entry to the
          the external masonry will behave in a similar way to the external leaf        subfloor area.
          of a full masonry structure.
                                                                                        Ground drainage
          Water Service and Drainage                                                    In all soils there is the capacity for water to travel on the surface and
                                                                                        below it. Surface water flows can be established by inspection during
          Where a water service pipe, a sewer or stormwater drainage pipe is in         and after heavy or prolonged rain. If necessary, a grated drain system
          the vicinity of a building, a water leak can cause erosion, swelling or       connected to the stormwater collection system is usually an easy
          saturation of susceptible soil. Even a minuscule leak can be enough to        solution.
          saturate a clay foundation. A leaking tap near a building can have the
          same effect. In addition, trenches containing pipes can become                It is, however, sometimes necessary when attempting to prevent water
          watercourses even though backfilled, particularly where broken                migration that testing be carried out to establish watertable height
          rubble is used as fill. Water that runs along these trenches can be           and subsoil water flows. This subject is referred to in BTF 19 and
          responsible for serious erosion, interstrata seepage into subfloor areas      may properly be regarded as an area for an expert consultant.
          and saturation.
                                                                                        Protection of the building perimeter
          Pipe leakage and trench water flows also encourage tree and shrub             It is essential to remember that the soil that affects footings extends
          roots to the source of water, complicating and exacerbating the               well beyond the actual building line. Watering of garden plants,
          problem. Poor roof plumbing can result in large volumes of rainwater          shrubs and trees causes some of the most serious water problems.
          being concentrated in a small area of soil:
                                                                                        For this reason, particularly where problems exist or are likely to
          • Incorrect falls in roof guttering may result in overflows, as may           occur, it is recommended that an apron of paving be installed around
            gutters blocked with leaves etc.                                            as much of the building perimeter as necessary. This paving should


                                             CLASSIFICATION OF DAMAGE WITH REFERENCE TO WALLS
                                                                                                          Approximate crack width               Damage
                             Description of typical damage and required repair                               limit (see Note 3)                 category
               Hairline cracks                                                                                      <0.1 mm                         0
               Fine cracks which do not need repair                                                                  <1 mm                          1
               Cracks noticeable but easily filled. Doors and windows stick slightly.                                <5 mm                          2
               Cracks can be repaired and possibly a small amount of wall will need to be              5–15 mm (or a number of cracks               3
               replaced. Doors and windows stick. Service pipes can fracture. Weathertightness           3 mm or more in one group)
               often impaired.
               Extensive repair work involving breaking-out and replacing sections of walls,            15–25 mm but also depends on                4
               especially over doors and windows. Window and door frames distort. Walls lean                  number of cracks
               or bulge noticeably, some loss of bearing in beams. Service pipes disrupted.




081203 BTF 18 3pp.indd 3                                                                                                                                    25/10/12 12:41:09

Page 45

                                   Gardens for a reactive site
                                                                                             • Water that is transmitted into masonry, metal or timber building
                                                                                               elements causes damage and/or decay to those elements.
                                                                                             • High subfloor humidity and moisture content create an ideal
                                                                                               environment for various pests, including termites and spiders.
                                                                                             • Where high moisture levels are transmitted to the flooring and
                                                                                               walls, an increase in the dust mite count can ensue within the
                                                                                               living areas. Dust mites, as well as dampness in general, can be a
                                                                                               health hazard to inhabitants, particularly those who are
                                                                                               abnormally susceptible to respiratory ailments.

                                                                                             The garden
                                                                                             The ideal vegetation layout is to have lawn or plants that require only
                                                                                             light watering immediately adjacent to the drainage or paving edge,
                                                                                             then more demanding plants, shrubs and trees spread out in that order.
                                                                                             Overwatering due to misuse of automatic watering systems is a
                                                                                             common cause of saturation and water migration under footings. If it
                                                                                             is necessary to use these systems, it is important to remove garden
                                                                                             beds to a completely safe distance from buildings.

                                                                                             Existing trees
                                                                                             Where a tree is causing a problem of soil drying or there is the
                                                                                             existence or threat of upheaval of footings, if the offending roots are
                                                                                             subsidiary and their removal will not significantly damage the tree,
                                                                                             they should be severed and a concrete or metal barrier placed
                                                                                             vertically in the soil to prevent future root growth in the direction of
                                                                                             the building. If it is not possible to remove the relevant roots without
                                                                                             damage to the tree, an application to remove the tree should be made
                                                                                             to the local authority. A prudent plan is to transplant likely offenders
                                                                                             before they become a problem.

                                                                                             Information on trees, plants and shrubs
                                                                                             State departments overseeing agriculture can give information
                                                                                             regarding root patterns, volume of water needed and safe distance
                                                                                             from buildings of most species. Botanic gardens are also sources of
          extend outwards a minimum of 900 mm (more in highly reactive                       information. For information on plant roots and drains, see Building
          soil) and should have a minimum fall away from the building of                     Technology File 17.
          1:60. The finished paving should be no less than 100 mm below
          brick vent bases.                                                                  Excavation
                                                                                             Excavation around footings must be properly engineered. Soil
          It is prudent to relocate drainage pipes away from this paving, if                 supporting footings can only be safely excavated at an angle that
          possible, to avoid complications from future leakage. If this is not               allows the soil under the footing to remain stable. This angle is called
          practical, earthenware pipes should be replaced by PVC and                         the angle of repose (or friction) and varies significantly between soil
          backfilling should be of the same soil type as the surrounding soil                types and conditions. Removal of soil within the angle of repose will
          and compacted to the same density.                                                 cause subsidence.
          Except in areas where freezing of water is an issue, it is wise to
          remove taps in the building area and relocate them well away from                  Remediation
          the building – preferably not uphill from it (see BTF 19).                         Where erosion has occurred that has washed away soil adjacent to
          It may be desirable to install a grated drain at the outside edge of the           footings, soil of the same classification should be introduced and
          paving on the uphill side of the building. If subsoil drainage is                  compacted to the same density. Where footings have been
          needed this can be installed under the surface drain.                              undermined, augmentation or other specialist work may be required.
                                                                                             Remediation of footings and foundations is generally the realm of a
          Condensation                                                                       specialist consultant.
          In buildings with a subfloor void such as where bearers and joists                 Where isolated footings rise and fall because of swell/shrink effect,
          support flooring, insufficient ventilation creates ideal conditions for            the homeowner may be tempted to alleviate floor bounce by filling
          condensation, particularly where there is little clearance between the             the gap that has appeared between the bearer and the pier with
          floor and the ground. Condensation adds to the moisture already                    blocking. The danger here is that when the next swell segment of the
          present in the subfloor and significantly slows the process of drying              cycle occurs, the extra blocking will push the floor up into an
          out. Installation of an adequate subfloor ventilation system, either               accentuated dome and may also cause local shear failure in the soil. If
          natural or mechanical, is desirable.                                               it is necessary to use blocking, it should be by a pair of fine wedges
          Warning: Although this Building Technology File deals with                         and monitoring should be carried out fortnightly.
          cracking in buildings, it should be said that subfloor moisture can                This BTF was prepared by John Lewer FAIB, MIAMA, Partner,
          result in the development of other problems, notably:                              Construction Diagnosis.


                       The information in this and other issues in the series was derived from various sources and was believed to be correct when published.
                           The information is advisory. It is provided in good faith and not claimed to be an exhaustive treatment of the relevant subject.
                                   Further professional advice needs to be obtained before taking any action based on the information provided.
                                                                                    Distributed by
                                                 CSIRO PUBLISHING PO Box 1139, Collingwood 3066, Australia
                                                  Tel (03) 9662 7666    Fax (03) 9662 7555    www.publish.csiro.au
                                                                          Email: [email protected]

                                                 © CSIRO 2003. Unauthorised copying of this Building Technology File is prohibited




081203 BTF 18 3pp.indd 4                                                                                                                                         25/10/12 12:41:26

Page 46

J001369-001-R-RevO August 2021

 

APPENDIX E

Limitations

 

Page 47

                                             LIMITATIONS

This Document has been provided by Core Consultants Pty Ltd (“Core”) subject to the following
limitations:

This Document has been prepared for the particular purpose outlined in Core’s proposal and no
responsibility is accepted for the use of this Document, in whole or in part, in other contexts or for
any other purpose.

The scope and the period of Core’s Services are as described in C o r e ’s proposal, and are
subject to restrictions and limitations. Core did not perform a complete assessment of all possible
conditions or circumstances that may exist at the site referenced in the Document. If a service
is not expressly indicated, do not assume it has been provided. If a matter is not addressed, do not
assume that any determination has been made by Core in regards to it.

Conditions may exist which were undetectable given the limited nature of the enquiry Core was
retained to undertake with respect to the site. Variations in conditions may occur between
investigatory locations, and there may be special conditions pertaining to the site which have not
been revealed by the investigation and which have not therefore been taken into account in
the Document. Accordingly, additional studies and actions may be required.

In addition, it is recognised that the passage of time affects the information and assessment provided
in this Document. Core’s opinions are based upon information that existed at the time of the
production of the Document. It is understood that the Services provided allowed Core to form no
more than an opinion of the actual conditions of the site at the time the site was visited and cannot
be used to assess the effect of any subsequent changes in the quality of the site, or its surroundings,
or any laws or regulations.

Any assessments made in this Document are based on the conditions indicated from published
sources and the investigation described. No warranty is included, either express or implied, that
the actual conditions will conform exactly to the assessments contained in this Document.

Where data supplied by the client or other external sources, including previous site investigation
data, have been used, it has been assumed that the information is correct unless otherwise stated.
No responsibility is accepted by Core for incomplete or inaccurate data supplied by others.

Core may have retained subconsultants affiliated with Core to provide Services for the benefit of
Core. To the maximum extent allowed by law, the Client acknowledges and agrees it will not have
any direct legal recourse to, and waives any claim, demand, or cause of action against, Core’s
affiliated companies, and their employees, officers and directors.

This Document is provided for sole use by the Client and is confidential to it and its professional
advisers. No responsibility whatsoever for the contents of this Document will be accepted to any
person other than the Client. Any use which a third party makes of this Document, or any reliance
on or decisions to be made based on it, is the responsibility of such third parties. Core accepts no
responsibility for damages, if any, suffered by any third party as a result of decisions made or
actions based on this Document.




Limitations                                Page 1 of 1                                   Date: 12/07/2018
FRM-065                             Uncontrolled When Printed                                  Issue: 1.02

Page 48

Page 49

www.ptgconsulting.com.au

 

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.