Civil Package

of 47

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 21, section 1. The text section number identifies this passage in the reader.

     1. Sediment fencing downstream of the work areas within the site to prevent sediment from leaving the
        disturbed construction area.

     2. Providing a stabilised construction entry and washdown area to minimise sediment carried by construction
        vehicles from the site.

     3. Minimising disturbed areas where possible.

     4. Diverting clean upstream run-off around disturbed areas within the site.

     5. Protecting material and equipment stockpile areas with upstream diversion banks and downstream
        sediment fencing to prevent sediment transport.

     6. Providing grass filter strips within the downstream verge

     7. Ensuring any loose material tracked onto roads by construction vehicles is swept and removed from the
        access road before the end of the day.




Project number 20220051                                                                                       Page 9 of 16
File RECOR Stormwater Management Report - 20220051.docx, 2022-05-05 Revision 0

P +61 7 5211 1003                         A 37 Mary St, Noosaville Qld 4566      E [email protected]    recorconsulting.com
Log in to download the original file

Civil Package.pdf · 9.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.