MCU15/0111

Building and Construction Industry (Portable Long Service Leave) Levy

2. The QLeave levy must be paid prior to the issue of a development permit where it
is required. Council will not be able to issue a Decision Notice without receipt of
details that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or
(07) 3212 6855.

Qualified Person

3. For the purpose of preparing a Geotechnical Report, and for certifying geotechnical
stability for the development, a qualified person is considered to be a person who:

a. is a Registered Professional Engineer of Queensland (RPEQ); and
b. has a degree in civil engineering or engineering geology; and

c. has a minimum of 5 years experience in the field of geotechnical engineering
or engineering geology.

Preparation of a Preliminary Construction Management Plan

4. A preliminary Construction Management Plan must be submitted with the
Operational Works application and must address the following:

a. traffic management during all aspects of the construction phase including:

i. a Traffic Management Control Plan in accordance with the Manual of
Uniform Traffic Control Devices (MUTCD) detailing all temporary
signage and traffic control measures prior to construction

ii. maintenance of safe pedestrian access for the areas affected by the
works during and after daily construction has ceased

iii. | proposed fencing to the site during the construction phase of the
development

iv. approval of the Traffic Management Control Plan by the Department of
Transport and Main Roads (DTMR) for any works on State controlled
roads

Vv. provision for worker car parking

b. maintenance and protection of water quality and existing drainage lines
through the construction site, through the implementation of appropriate
erosion and sediment control measures

Cc. works programme identifying key components of the works and their
respective durations

d. establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise of agreed
construction times, impacts on traffic, services and other relevant issues

e. _ identification of complaint management procedures including:
i. contact details for the on-site manager
ii. dispute resolution procedures

f. details on the location of external fill sites/sources, the haulage route, type of
vehicle to be utilised during filling operations and frequency of usage. NB any
damage to the existing road system as a result of haulage operations shall
be fully repaired at the applicant's expense

Page 17 of 37

Document Set ID: 20103451
Version: 1, Version Date: 25/07/2016 Print Date: 25 July 2016, 3:34 PM

Log in to download the original (MCU -Cooroy.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.