Original source · versioned page text
MCU -Cooroy
Noosa Council documents MCU15/0111 Building and Construction Industry (Portable Long Service Leave) Levy 2. The QLeave levy must be paid prior to the issue of a development permit where it is required. Council will not be able to issue a Decision Notice without receipt of details that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212 6855. Qualified Person 3. For the purpose of preparing a Geotechnical Report, and for certifying geotechnical stability for the development, a qualified person is considered to be a person who: a. is a Registered Professional Engineer of Queensland (RPEQ); and b. has a degree in civil engineering or engineering geology; and c. has a minimum of 5 years experience in the field of geotechnical engineering or engineering geology. Preparation of a Preliminary Construction Management Plan 4. A preliminary Construction Management Plan must be submitted with the Operational Works application and must address the following: a. traffic management during all aspects of the construction phase including: i. a Traffic Management Control Plan in accordance with the Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures prior to construction ii. maintenance of safe pedestrian access for the areas affected by the works during and after daily construction has ceased iii. | proposed fencing to the site during the construction phase of the development iv. approval of the Traffic Management Control Plan by the Department of Transport and Main Roads (DTMR) for any works on State controlled roads Vv. provision for worker car parking b. maintenance and protection of water quality and existing drainage lines through the construction site, through the implementation of appropriate erosion and sediment control measures Cc. works programme identifying key components of the works and their respective durations d. establishment of a communication protocol with the general public, adjoining owners, emergency services and local businesses to advise of agreed construction times, impacts on traffic, services and other relevant issues e. _ identification of complaint management procedures including: i. contact details for the on-site manager ii. dispute resolution procedures f. details on the location of external fill sites/sources, the haulage route, type of vehicle to be utilised during filling operations and frequency of usage. NB any damage to the existing road system as a result of haulage operations shall be fully repaired at the applicant's expense Page 17 of 37 Document Set ID: 20103451 Version: 1, Version Date: 25/07/2016 Print Date: 25 July 2016, 3:34 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (MCU -Cooroy.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.