Council archive · source document
0015E664.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
INTEGRATED PLANNING ACT 1997, {DAS Assessment Checklist, Version 20, 2 April 2007
. Integration of-land‘use and public 22. The application involves: (tick the applicable box’es)—
“Ferns reat rtr'6 ude 28 schedule [_] (i) a material change of use assessable against the planning scheme for a purpose
" BA of the IPA;& schediite 2-of the IP Regulation. mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that ~
“Unlass youjafiswered “nione of the above", the. schedule. oe
* applicatioritriggers referaltoQTasa “*-: [>
concurrerice agency. [1] (ii) reconfiguring a fot— .
Soe Be, ot * [J (a@) _ onland that is completely or partly within a public transport corridor, andthe —
BO total number of lots increases;
yo, oe (]{b) on land that is completely or partly within a future public transport corridor or
o |t an airport's public safety area;
} , . ‘ (1 {c) on land that is within 400m of a public passenger transport facility or a future
ot: public passenger transport facility, and the total site area is 5000m? or greater,
. tpt. . (J (d) for residential purpose within the 25 ANEF contour for an airport;
) gf f . [J (e) _ fora residential purpose resulting in 100 or more allotments.
js OFS ; (_] (iii) operational work assessable against the planning scheme, but not associated with a
peo. } fF ; material change of use mentioned in {i) above or reconfiguring a lot mentioned in (ii)
; oP SS f . ' above, on land that—_. ‘
. fo ; (1) (a) _ is completely or partly within a public transport corridor or a future public
’ tp, }. transport corridor; : -
,. ) | (J (b) will result in work that encroaches into an airport's operational airspace.
; f fo. — Hi none of the above. © @
Railway safety and efficiency 23. The application involves: (tick the applicable box/és)— .
‘Fox more information refer to Guide 23, schedule [_] (i) a material change of use assessable against the planning scheme for a purpose
. _Bhofthe IPA'8 schedule 2 of te IP Requiation ” mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
} :application triggers referral to OT-as a schedule, . ;
- Unless.you answered *none of the:above’, the 4
a concurrence agency." a, es” (] {ii) reconfiguring a lot— . a =
I. f f ee ee rene ee (] (a) on land that is completely or partly within a future public transport corridor,
J / sled Te sang _+ future railway land or a railway tunneleasement;
“ty ee Rei ho on ([] {b) on land that is within 400m of a Citytrain passenger railway station or a future
aM ys or UY Citytrain passenger railway station, and the total site area is 5000m? or
i me _ greater; a a
De, 4 [J (c) ‘on land that abuts rail corridor tand, commercial corridor land or future railway
So ee Uy Ben land, and the total number of lots increases;
a (0 (4) ~ on land. that abuts rail corridor !and, commercial corridor tand or future railway .
a ea - land and an easement abutting the corridor or future railway land is created; -
ood OS ee oo ie [J (e) on land that is completely or partly within 100m of, and abutting an approach
i PE ad Bee Ro AP to, a railway level crossing, and the total number of lotsincreases; «=
a ee 2S Mg : C1 (f) for a residential purpose resulting in 100 or more allotments.
Weel PYRO Saat Ps od (] (iii) operational work assessable against the planning scheme, but not associated with a @
: pg / ‘material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
: eokash byt ih. ce above, involving extracting, excavating or filling greater than 50m3, on land that—
we FE BR ee [J (a) is completely or partly within rail corridor land or commercial corridor land, and
a the work is not for rail transport infrastructure or other rail infrastructure;
; ee : (-] {b) _ is completely or partly within future railway land, or a railway tunnel easement;
Co te ee (J {c) abuts rail corridor and, commercial corridor land or future railway land, and .
CAE the work is within 25m of the railway boundary. ;
Ce iw none of the above. -
‘Moonieto:Brisbane-pipeline =. -|24. The application involves the easement for the:construction or operation of the Moonie to
“For more information refer to schedule 2of the P| Brisbane strategic pipeline, and involves: {tick the epplicable box/es)— ae
Tete torscbrcd irk in@akonsh he: - [J (i) a material change of use assessable against the planning scheme and not associated
vappicaton biggers reféralto the holder of he with reconfiguring a fot, and any structure or work will be located wholly or partly in the
‘pipeline licence No 4:iSsued under:the Petroleum) . easement. | 7 .
*AGt'1923; curently Santos ONT-Ply Utd; for. (1 (ii) reconfiguring a fot -
: vadvicg.”* IE re as . . «pe "
. Po ‘ C (ii) operational work assessable against the planning scheme, thatis filing, excavation, .
oy vo ae Jo compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
ne 4 work is located wholly or partly in the easement. Lo
foe a , ‘ wiv none of the above, uO moe
_ Pages SO aeSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015E664.001.pdfRelated documentPublic source context ↗
07/1529 - MCU - Retail Type Business -Type 2 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.