Council archive · source document
0015E664.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
~ INTEGRATED PLANNING ACT 1997 , IDAS Assessment Checklist, Version 20, 2 Aprit 2007 '
State-controlled.road:matters ~. ° ‘ 2. The application involves: (tick applicable box/es) .
‘Rot more information refer to Guides.) (i) development on tand contiguous* to a State controlled road andfor-
Unless youranswered “none of the above" to 2, : . . i,
“the application triggers referalto the Department J {a} material change of use assessable against the planning scheme;
RE a Seva ks te (J (b) reconfiguring a fot unless - .
, ‘tn certain-circumstances OMR will be-an advice: . . oo. Lo :
. agency; while in.other crcumstarices OMR will » the total number of lots is not increased; and
berconcurence agency, od ¢ the total number of lots abutting the State-controlied road is not increased: ss
Schedule ?er the cReaulaton “i = you to (J (c) operational work (not associated with a material change of use assessable against the
concurrence agency for the application. . .planning scheme or reconfiguring a lot mentioned in (b) above)-
7 cues ‘ _* associated. with access to a State-controlled road; or ;
, es ' _« forfilling or excavation; or .
; mt : : * involving the redirection or intensification of site stormwater from the land, through a
Bo pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a ;
ee State-controlled road.
ook De Ee, - C0 (ii) development on land not contiguous to a State-controlled road and -
Pe (CI (a) material change of use —
mS a , te, « assessable against the local government's planning scheme; and _
. oo "es 7 * mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
oo, . that schedule;
ce a [1] (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
; be and exceeding the thresholds set by that schedule; @
we OTE ae yo [J (c) operational work (not associated with a material change of use assessable against the
Ee planning scheme or reconfiguring a fot mentioned in (b) above)-
; wis den Tye Fie e assessable against the local government's planning scheme; and
Sg CEO ag a SR ae *_¢ mentioned in schedule 5 of the [P Regulation and exceeding the thresholds set by
CRORES Be Ew wpa that schedule. :
“ee elie ch opi cal eae a Hii none of the above a
Clearing vegetation. .....-- .~ [3. The application involves: (tick applicable box/es)
. “For more information refer-to Guide 12, .-- | (i) material change ofuse— _
‘Uiiless you answered “none of:the abover-to Q3, : . .- oO Te,
‘the. application requires.assessment bythe.” _ + {a} assessable against the planning scheme;
“Department of Natural Resouives.and Water. (b) on alot containing - sO .
ANRW)lr toes TE OE n ; . .
‘ffan'agency other than NRW\Is the assessment * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
Manager for the application NRW isa. e if there is no property map of assessable vegetation for the lot - remnant vegetation; .
pepcuenice, agency forthe application in elation (c) ‘where the existing use of the land is a rural or environmental use; and _
“ityoutick ed (3() or ih-your application reiuites (d) where the size of the land is 2 hectares or larger - completa Part J of Form 1 ;
referral to.NRW for:assessment regardless of “| ~ [} (ii) reconfiguring a lot- .
whether vegetation clearing Is: proposed ‘or.not: 7 oo .
Doe ep an le Td (a) on a fot containing a category 1, 2 or 3 area shown on a property map of ,
a go et ita ee "assessable vegetation or, if there is no property map of assessable vegetation for ©.
POT IND pope ty the lot, remnant vegetation; ON vs
. Ga oped ake Enea at alg .{b) where the size of the lot before the reconfiguration is 2 hectares or larger;
pop MA ber.” es PAR oe (c) where 2 or more lots are created; and :
Pe. ya Sl Se ybae (d)_ where the size of any {ot created is 25 hectares or smaller - complete Part J of Form 1
ok a IST PE) 2) (itl) operational work - -
Bee ee eee ra Nee (a): for the clearing of native vegetation where the vegetation clearing is made
We a Ste Ege assessable under Schedule 8 of the IPA; and
| (b) not associated with a material change of use assessable against the planning .
.. nie scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
. - " 4 Form 1
Pots ; 7 ivy - hone of the above.
Strategic portland. =. ~~ 14” The application involves: “
. For.more information refer to Guide tt. | LQ) development on strategic port land’as defined in the Transport Infrastructure Act 1994 (TI
‘Hyou ticked ()- the relevant Fort Authonty.isithe | Act) - complete Part | of Form 1
‘assessment manager-for the application.” .' . ; ;
‘you ticked. (3) Queensland "Transport isa a (1 (ii) a material change of use that is inconsistent with the land use plan approved under the
Concurrence agency.for the application: TI Act.for the strategic port land - complete Part ! of Form 1 ,
Lo, ey w (iii) none of the above a
4 Land contiguous to.a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land ig within 100m of the State-controliad road; or that is part of afuune State-
controlled road. . : : '
. Page 2 - :
. . ~ ~ .- . eeSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015E664.001.pdfRelated documentPublic source context ↗
07/1529 - MCU - Retail Type Business -Type 2 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.