SITE DESCRIPTION AYOUT _P'

LOTS ! ON SP182880
PARISH OF TEWANTIN SCALE 11000 AT At
COUNTY OF MARCH

 
    
 

SEDIMENT AND EROSION PLAN

Objective/target

    
    
    

  
 
 

Comply with all statutory regulations and maintain them
during construction and the maintenance period. Comply with
this erosion and sediment controt plan, ta control erosion
and sediment flows.

 

EROSION CONTROL DEVICES

These devices are designed to minimise erosion at o construction
site and consequently decrease downstream sediment transport.
They include diversion drains, slope drains, energy dissipators

and level spreaders.

DIVERSION DRAINS may be formed as a cut drain, bank or berm

or a combination of both.

SLOPE DRAINS are generally stabilised drains which discharge water
from the end of a diversion drain down an exposed slope.

ENERGY DISSIPATORS (eg: HAY BALES) may be necessary at the
ends of slope drains,

LEVEL SPREADERS are excavated outlets constructed at zero grade Performance Indicators | Site foreman to check erosion and sediment flows at the
at the end of diversion drains to convert concentrated flow to sheet How. base of embankments after rain.

Check that check dams arte working during rain periods.

These devices are designed to remove sediment from runoff before it downfall.

leaves the site and includes temporary measures such as hay-bale

barriers and semi-permanent measures such as sedimentation basins. Responsible Person/
all sediment traps require regular cleaning and should be checked after Organisation
each storm tor damage and clogging by silt or debris,

LEVEL SPREADERS are temporary measures used to control sediment
transport. Oepending on the time period over which they are expected

to operate in a satisfactory manner, level spreaders need to be checked
regularly due to clogging by sediment and general matter.

SILT FENCES are used in a similar manner to hay bale barriers

except that they are not intended to intercept concentrated flow.

GULLY INLET PROTECTION is often necessary once road construction has
been completed and altotments and footpaths have been topsoiled and seeded,
FIELO INLET SEDIMENT TRAPS are formed either by over-excavating around
a field intet or by the use of hay bales around a field intet.

CULVERT INLET PROTECTION is often necessary where a natural channel
has been disturbed during construction of a man-made channel or to
control sediment transport resulting from the culvert construction itself.

MAXIMUM CATCHMENT AREAS FOR SEDIMENT CONTROL DEVICES

Device Type Maximum Catchment Area
Diversion Drain

10 ha (depending on type)
Slope Drain

0.5 ha
Level Spreader

 
 

 

   

  
   
  
  
  

Management Strategy Site foreman to identify and check direction of stormwoter
land flows as shown on the plan. Provide barriers and other
measures shown on the plan to prevent stormwater flows

over embankments and sediments into catchpits.

   
  
  

  
  
    
  

     

Tasks/Actions Erect sediment barriers at the top of embankments as
shown on the drawing. Strategically place check dams around

guily pits.

  
  

 
 
    

 
    
   

 
    
  

Site foreman ta be responsible for inspections

  

 
 

 

   
  

   

   
  

Reporting/Review Site workers to advise foreman if they notice any barrier

needing repair.

  
  

     
   

 
 

Corrective Actians Site foreman to report and order through supervisor, extra

borrier or check dams as required,

  

 

 

 

 

 

 

 

 

 
   
    
  

 

 
  
   
 

0,5 ha

   
      
   
  
     

  
  
 

 
  
  
  

~'r .

 
 
   
    
 

Sitt Fence 0.6 ha per 100m

  
 

  
   
 

  

Field Inlet Sediment Trap tha , TYPICAL SILT FENCE’ >. \,
Grass Outlet Sediment Trap 2 ha : REFER DWG 43068/(07\\
Stone Outlet Sediment Trap Zhao \ 4

Rip-Rap Outtet Sediment Trap 5S ha

  

Sedimentation Basin 10 ha (or greater depending an design}

 

 

 

CONTR OF T ID CARRIAGE OF DUST us" ;
To ensure that all works do not detrimentally affect the amenity of AND oT Pence
the general neighbourhood and the environment surrounds the following 2 fs os REFER OWG M3048/C07

 

measures should be addopted:
Provide o water truck on site for the duration of the contract period.
All topsoited areas to be treated by surface spraying a minimum of
three (3) times per day at maximum three (3) hour intervals, until
satisfactory ground cover is achieved.

 

 

 

     
 

 

© © © 1 80 50 ote
arp et

 
   
   
    
 
  
    

 
 

EROSION -CONTROL

     

   
   
     
    
   
  
 
   

     
    
      
   
  
  

NOTES:

1 This is the property of the engineer, ond aay not -_
be sed, Copied, o¢ reproduced vbally, oF in part

PROJECT:
LOT RECONFIGURATION at
LOT 1 SP 182880

  
    
     
   
  
   
 

TITLE:
REGG wermmnna_|SEDIMENT AND EROSION
scertlesteenes CONTROL LAYOUT PLAN

ABS 7710 957 85 AC NS 957 BS

   

witboct the express permissics af the engneer.

 

  
   
   
   

  
  

Infringement any way may ees i eg atin pemeams (SHEET 1 OF 2 EENIE CREEK ROAD
1 Figured Gmensions tate precedence ever scated. CORAL COAST: ‘ASSOCIATED CONSULTANTS NOOSAVILLE aT SR SUBSET-SHEET-REVISION

  

Fi, 3 Verily oll dimensions on site roe aniseus KEN HICKS & ASSOCIATES

aii | ate [BylNo] Amendment = fee wach aT? Ph; (07) 5443 2864 Fax: 107) 5643 7166 M3048 = C 05

   
   

Used in these records

About this file

File size
6.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Application part 1 [As Published].pdf · 6.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.