                                           NOOSA COUNCIL
                                        REFERENCE DOCUMENT
                                        OPW26/0094 9 SEP 2026




                                       ACID SULFATE SOIL REPORT: Proposed Residence

                                                                     30 Mossman Court

                                                                          Noosa Heads

                                                      DD Sunnyside CD Sunnyside Pty Ltd

                                                                        November 2023

                                                                              PG-10899

                                                                             VERSION 3




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024
Full text of pages 2 to 64 (of 75)

Page 2

                 Ref:                  PG-10899, 2023-10-16, ASR VER 3
                 Author:               Robert Maxwell



                                                                                28th November, 2023

                 DD Sunnyside CD Sunnyside Pty Ltd
                 Email: [email protected]

                 ATTENTION:              DAVID DODD

                 Dear Sir,

                                ACID SULFATE SOIL INVESTIGATION – PROPOSED RESIDENCE
                                          30 MOSSMAN COURT, NOOSA HEADS


                 Enclosed is a copy of our report for the above project dated November 2023. An
                 electronic copy of the report has been issued.

                 It should be noted that access to the site was restricted by the existing on-site
                 residence and testing was therefore restricted to one location only. Additional
                 borehole drilling and testing will be required when access becomes available.

                 Should you have any queries regarding this report, please do not hesitate to contact
                 Robert Maxwell or Peter Elkington at this office.

                 Yours faithfully,




                 R. MAXWELL (RPEQ 16596)

                 For and on behalf of
                 PACIFIC GEOTECH PTY LTD




                                                         [email protected]
                                                         www.pacgeo.com.au

Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 3

                                                        TABLE OF CONTENTS
                 1.0      INTRODUCTION ..................................................................................................... 1
                 2.0      METHODOLOGY .................................................................................................... 2
                 3.0      SITE DESCRIPTION ................................................................................................. 2
                 4.0      GEOLOGICAL MODEL .......................................................................................... 4
                 5.0      GROUNDWATER .................................................................................................... 4
                 6.0      LABORATORY TESTING ......................................................................................... 5
                 7.0      LIMITATIONS .......................................................................................................... 7


                 Appendices
                    Appendix A
                       Notes relating to this report

                    Appendix B
                       Borehole Record Sheets

                    Appendix C
                       Laboratory Test Certificates

                    Appendix D
                       Site Plan

                    Appendix E
                       Acid Sulfate Soil Management Plan




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 4

                  Project No. PG-10899                                                                                                      Page | 1
                  November 2023
                  Ref: PG-10899, 2023-10-16, ASR VER 3
                  DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Investigation - Proposed Residence, 30 Mossman Court, Noosa Heads




                 1.0 INTRODUCTION

                 This report contains the results of the acid sulfate soil investigation by Pacific Geotech
                 and contains advice and recommendations relating to:

                           Acid sulfate soil conditions
                           Development of an Acid Sulfate Soil Management Plan
                 Proposed Development

                 It is understood that the proposed development is to consist of the construction of a
                 two-storey residence above a single level basement at the above site. Earthworks are
                 envisaged to consist of cuts of up to 3m for the basement. The total volume of material
                 to be disturbed is in the order 900m3.

                 The proposed development is indicated below.

                                                                    PROPOSED DEVELOPMENT




                                                                         PROPOSED SECTION




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 5

                  Project No. PG-10899                                                                                                      Page | 2
                  November 2023
                  Ref: PG-10899, 2023-10-16, ASR VER 3
                  DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Investigation - Proposed Residence, 30 Mossman Court, Noosa Heads




                 2.0 METHODOLOGY

                 The investigation comprised the drilling and sampling of one (1) boreholes to a depth
                 of 9.0m, using a Compac 018 drilling rig fitted with 100mm solid flight augers, and one
                 (1) hand auger across the proposed building area. Dynamic Cone Penetrometer
                 (DCP) testing was conducted adjacent to the boreholes.

                 The deeper borehole was sampled for Acid Sulfate purposes, in addition to
                 geotechnical sampling.

                 Additional borehole drilling and testing will be required when access to the remainder
                 of the site becomes available.

                 The boreholes were located by an experienced geotechnical engineer with
                 reference to the site features and locations were recorded. At the completion of the
                 drilling, the holes were checked for groundwater intrusion and then backfilled.

                 The soil classification descriptions and field tests were carried out in general
                 accordance with Australian Standards.

                                AS 1726                                      Geotechnical Site Investigations

                                QASSIT                                       Queensland Acid Sulfate Soil Investigation
                                                                             Team Dept. of Natural Resources, 'Guidelines
                                                                             for Sampling and Analysis of Lowland Acid
                                                                             Sulfate Soils (ASS) in Queensland, 1998' (Oct.
                                                                             1998, Revision 4.0).

                                NOOSA COUNCIL                                'SC6.9.3 Acid Sulfate Soils (ASS) Investigation
                                                                             and management plan

                                QUEENSLAND                                   State Planning Policy Guideline, December
                                GOVERNMENT                                   2013, Acid Sulfate Soils

                 Borehole records, Dynamic Cone Penetrometer test results and a site plan showing
                 the test locations are appended to the report.

                 3.0 SITE DESCRIPTION

                 The site of the proposed development is located at 30 Mossman Court, Noosa Heads.
                 The site was bordered by Mossman Court to the south, existing residences to the east
                 and west, and a canal to the north.

                 At the time of the investigation, the site was occupied by an existing two storey
                 residence and detach single garage. The site was relatively level and drainage was
                 considered poor to fair.



                 Refer following aerial and site photographs for typical site conditions.




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 6

                  Project No. PG-10899                                                                                                      Page | 3
                  November 2023
                  Ref: PG-10899, 2023-10-16, ASR VER 3
                  DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Investigation - Proposed Residence, 30 Mossman Court, Noosa Heads




                                                                              AERIAL IMAGE




                                                                         SITE PHOTOGRAPHS




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 7

                  Project No. PG-10899                                                                                                        Page | 4
                  November 2023
                  Ref: PG-10899, 2023-10-16, ASR VER 3
                  DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Investigation - Proposed Residence, 30 Mossman Court, Noosa Heads




                 4.0 GEOLOGICAL MODEL

                 The subsurface profile encountered in borehole BH01 generally consisted of a surficial
                 concrete layer associated with the driveway, overlying very loose to loose sand fill to
                 a depth of 2.3m, overlying natural sands that were generally medium dense to dense,
                 becoming indurated at a depth of 6.6m, and continued to the termination of
                 borehole BH01 of 9.0m.

                 In HA02, loose silty sand fill was encountered to a depth of 0.6m, overlying loose sand
                 fill to the termination depth of 1.0m.

                 Table 1. presents a summary of the encountered subsurface profile. Detailed borehole
                 record sheets are appended to this report.

                 TABLE 1                           SUBSURFACE PROFILE SUMMARY

                                                                           NATURAL
                                                                             SAND
                   BH No.               FILL                                                                                                BH TD
                                                                                  Dense to Very Dense
                                                         Medium Dense to Dense
                                                                                      (Indurated)
                    BH01              0.0-2.3                   2.3-6.6                  6.6-TD                                              9.0
                    BH02              0.0-TD                      NE                       NE                                                1.0

                 Notes:
                 1. All depths in metres below ground level at time of investigation.
                 2. NE - Not Encountered; TD - Termination Depth.

                 5.0 GROUNDWATER

                 Groundwater was noted in borehole BH01 at a depth of 2.8m at the time of drilling.
                 Water levels can be expected to similar to the tidal levels of the neighbouring canal
                 and may vary with seasonal and climatic conditions.




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 8

                  Project No. PG-10899                                                                                                      Page | 5
                  November 2023
                  Ref: PG-10899, 2023-10-16, ASR VER 3
                  DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Investigation - Proposed Residence, 30 Mossman Court, Noosa Heads




                 Typically the groundwater levels in the area are encountered at levels of
                 approximately RL 0.5m to RL 1.0m. Fluctuations of +/- 0.5m are typically noted in the
                 area.

                 Increases in the groundwater levels often occur following significant rainfall events
                 (floods) with the groundwater levels to as much as RL 1.5m to RL 2.0m being noted in
                 the area.

                 6.0 LABORATORY TESTING

                 Laboratory testing was undertaken in general accordance with the
                 recommendations outlined in the QASSIT 'Acid Sulfate Soils Laboratory Methods
                 Guidelines 2004' and was undertaken by Pacific Geotech. The results of the testing
                 program are appended to this report.

                 The testing program comprised of initial screening tests on recovered samples,
                 followed by quantitative testing using the Chromium Reducible Sulfur (CRS) suite.

                 Screening Tests

                 Screening tests were undertaken on soil samples collected from borehole BH01. Two
                 small sub-samples of each soil sample were prepared; one sub-sample from each
                 sample was mixed with approximately 20mL of distilled water, and the other sub-
                 sample mixed with approximately 20mL of hydrogen peroxide (H2O2), buffered to a
                 pH of 5.4 with sodium hydroxide.

                 Slurry pHs were measured with a calibrated pH meter. The pH of the distilled water/soil
                 slurry (pHF) was measured approximately one hour after mixing, whilst the pH of the
                 hydrogen peroxide/soil slurry (pHFOX) was measured approximately one to two hours
                 after mixing.

                 The pH screening tests can be used for the preliminary identification of a potential or
                 actual ASS using a combination of three trigger factors as follows:

                      a) The strength of the reaction with peroxide is a useful indicator but cannot be
                         used alone. Organic matter and other soil constituents such as manganese
                         oxides can also cause a reaction.

                      b) A pHFOX value at least one unit below pHF may indicate a potential ASS. The
                         great the difference between the two measurements, the more indicative the
                         value is of a potential ASS. The lower the final pHFOX value the better the
                         indication of a positive result.

                      c) If the pHFOX is less than 3, and the other two conditions apply, then it strongly
                         indicates a potential ASS. The more the pHFOX drops below 3, the more positive
                         the presence of sulfides.

                 In broad summary, several of the ‘natural’ soil samples tested did show a strong
                 indication of ASS presence at depths greater than 3m below ground level. The results




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 9

                  Project No. PG-10899                                                                                                         Page | 6
                  November 2023
                  Ref: PG-10899, 2023-10-16, ASR VER 3
                  DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Investigation - Proposed Residence, 30 Mossman Court, Noosa Heads




                 of the screening tests were used to assist in the selection of samples for more detailed,
                 quantitative laboratory testing.

                 Chromium Suite Analysis

                 Chromium suite analysis was undertaken to quantify existing soil acidity and potential
                 future acid generation from possible ASS. Soil samples were refrigerated until
                 transported to Pacific Geotech’s laboratory, under standard chain of custody
                 protocol. A summary of results is given in Table 2.

                 TABLE 2                           CHROMIUM SUITE TESTING SUMMARY

                                                                                Nett Acidity                                     Liming Rate
                  BH No.                Depth (m)
                                                                                 (mol H+/t)                                     (kg CaCO3/t)
                   BH 01                       1.0                                   <5                                               <1
                   BH 01                       2.0                                   11                                               <1
                   BH 01                       3.0                                   23                                                2
                   BH 01                       4.0                                   35                                                3

                 Summary

                 On the basis of the testing undertaken, some samples provided nett acidity values
                 above the QASSIT defined action criteria at depths greater than 3m below ground
                 level. Therefore, soils disturbed on-site should be treated in accordance with the
                 attached Acid Sulfate Soil Management Plan.

                 The results of the laboratory testing are appended to this report.




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 10

                  Project No. PG-10899                                                                                                      Page | 7
                  November 2023
                  Ref: PG-10899, 2023-10-16, ASR VER 3
                  DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Investigation - Proposed Residence, 30 Mossman Court, Noosa Heads




                 7.0 LIMITATIONS

                 We have prepared this report for the Proposed Residence at 30 Mossman Court,
                 Noosa Heads. The report is provided for the exclusive use of DD Sunnyside CD
                 Sunnyside Pty Ltd, for this project only and for the purposes outlined in the report. It
                 should not be used by, or relied upon, for other projects on the same or different sites
                 or by a third party. In preparing this report, we have relied upon information provided
                 by the client or their agents.

                 The results are indicative of the subsurface conditions on site only at the specific
                 testing locations. Subsurface conditions can change between test locations and the
                 design and construction should take the spacing of the testing and testing methods
                 adopted and the potential for variation between the test locations.

                 This is not to reduce the level of responsibility accepted by Pacific Geotech, but rather
                 to ensure that the parties who may rely on the information contained in this report are
                 aware of the responsibilities they assume in doing so.




                 R. MAXWELL (RPEQ 16596)

                 For and on behalf of
                 PACIFIC GEOTECH PTY LTD




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 11

                  Project No. PG-10899
                  November 2023
                  Ref: PG-10899, 2023-10-16, ASR VER 3
                  DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Investigation - Proposed Residence, 30 Mossman Court, Noosa Heads




                                                                                                                                            APPENDICES




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 12

                  Project No. PG-10899
                  November 2023
                  Ref: PG-10899, 2023-10-16, ASR VER 3
                  DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Investigation - Proposed Residence, 30 Mossman Court, Noosa Heads




                                                                                                                                            APPENDIX A
                                                                                    NOTES RELATING TO THIS REPORT




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 13

                                                                      Notes Relating to this Report


                 Reports                                                other particles present (e.g. sandy clay) as set
                                                                        out below:
                 The report has been prepared by qualified
                 personnel, is based on the information                         Soil
                                                                                                    Particle Size
                 obtained from field and laboratory testing, and           Classification
                 has been undertaken to current engineering             Clay                less than 0.002mm
                 standards of interpretation and analysis.              Silty               0.002 to 0.06mm
                                                                        Sand                0.06 to 2mm
                                                                        Gravel              2 to 60mm
                 Every care has been taken with the report as it
                 relates  to     interpretation   of   subsurface
                                                                        Non-cohesive soils are classified on the basis of
                 conditions,     discussion    of    geotechnical
                                                                        relative density which can be correlated from
                 conditions and contains recommendations or
                                                                        the results of Standard Penetration Test (SPT) as
                 suggestions for design and construction.
                                                                        below:
                 However, unexpected variations in ground
                 conditions will occur. The potential for this will
                                                                                                    SPT ‘N’ Value
                 depend partly on testing, spacing and                  Relative Density
                                                                                                   (blows/300mm)
                 sampling frequency.                                    Very Loose          less than 4
                                                                        Loose               4 – 10
                 If variations are identified, Pacific Geotech          Medium Dense        10 – 30
                 would be pleased to assist with additional             Dense               30 – 50
                 investigations or advice to resolve the matter.        Very Dense          greater than 50

                 Copyright                                              Cohesive soils are classified on the basis of
                                                                        strength (consistency) and can be quantified
                 This report is the property of Pacific Geotech         by the Pocket Penetrometer test, Vane Shear
                 Pty Ltd. The report may only be used for the           test,    laboratory testing   or  engineering
                 purpose for which it was commissioned and in           examination. The strength terms are defined as
                 accordance with the Terms of Engagement of             follows:
                 proposal. Unauthorised use of this report is
                 prohibited.                                                                  Unconfined Compressive
                                                                         Classification
                                                                                                     Strength kPa
                 Borehole and Test Pit Logs                             Very Soft           less than 25
                                                                        Soft                25 - 50
                 The borehole and test pit logs presented in this       Firm                50 – 100
                 report are an engineering and/or geological            Stiff               100 – 200
                 interpretation of the subsurface conditions, and       Very Stiff          200 - 400
                                                                        Hard                greater than 400
                 their reliability will depend to some extent on
                                                                        Friable             strength not attainable – soil
                 frequency of sampling and the method of                                    crumbles
                 drilling or excavation.
                                                                        Rock types are classified by their geological
                 Interpretation of the information and its
                                                                        names, together with descriptive terms
                 application to design and construction should
                                                                        regarding weathering, strength, defects, etc.
                 therefore take into account the spacing of
                 boreholes or pits, the frequency of sampling,                               Planarity
                 and the possibility of other than ‘straight line’      CU                  Curved
                 variations between the test locations.                 DIS                 Discontinuous
                                                                        IR                  Irregular
                 Description and Classification Methods                 PR                  Planar
                                                                        ST                  Stepped
                 The description and classification of soils and        UN                  Undulose
                 rocks used in this report are based on AS 1726.

                 Soil types are described according to the
                 predominating particle size and behaviour as
                 set out in the attached Unified Soil
                 Classification Table qualified by the percent of



                 October 2017                                                                                       pg. 1

Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 14

                                       Roughness                    Investigation Methods
                 POL                    Polished
                 RJ                     Rough                       Test Pits: These are typically undertaken with a
                 S                      Smooth                      backhoe or a tracked excavator, allowing
                 SL                     Slickened                   examination of the insitu soils. Limitations of test
                 VR                     Very Rough
                                                                    pits are the problems associated with collapse
                                                                    of the pits, disturbance and difficulty of
                       Defects                      Type            reinstatement and the consequent effects on
                 BP                    Bedding Parting              close-by structures. Care must be taken if
                 CL                    Cleavage                     construction is to be carried out near test pit
                 CO                    Contact                      locations to either properly recompact the
                 CS                    Crushed Seam                 backfill during construction or to design and
                 CZ                    Crushed Zone
                                                                    construct the structure so as not to be
                 DB                    Drilling Break
                                                                    adversely affected by poorly compacted
                 DK                    Dyke
                 DL                    Drill Lift                   backfill at the test pit location.
                 DZ                    Decomposed Zone
                 FC                    Fracture                     Hand Auger Drilling: A borehole of typical
                 FL                    Foliation                    diameter of between 50mm to 75mm advance
                 FZ                    Fracture Zone                manually operated equipment.         Premature
                 HB                    Handling Break               refusal of the hand augers can occur on a
                 IS                    Infilled Seam                variety of materials such as fill, gravel, hard
                 JT                    Joint                        clays and collapse of the borehole (typically in
                 H                     Schistosity                  non-cohesive soil).
                 SI                    Sill
                 SM                    Seam                         Continuous Spiral flight Augers: The borehole is
                 SS                    Shear Seam                   advanced using 65mm to 100mm diameter
                 SZ                    Shear Zone
                                                                    continuous spiral flight augers, which are
                 VN                    Vein
                                                                    withdrawn at intervals to allow sampling and
                 VO                    Void
                                                                    insitu testing.  Augers of up to 300mm in
                 Sampling                                           diameter are used to recover larger volumes of
                                                                    sample. Samples are returned to the surface
                 Sampling is undertaken during the fieldwork to     by the flights or may be collected after
                 allow examination of the soil or rock and to       withdrawal of the auger flights. Samples can
                 allow laboratory testing to be undertaken.         be disturbed and layers may become mixed.
                                                                    Augering below the groundwater table can be
                 Disturbed samples taken during drilling provide    less reliable than augering above the water
                 information on plasticity, grain size, colour,     table.
                 moisture content and minor constituents. Bulk
                 samples are similar but of greater volume          A Tungsten Carbide (TC) bit for auger drilling
                 required for some test procedures such as CBR      into rock can be used to indicate rock strength
                 testing.                                           and continuity by variation in drilling resistance
                                                                    and from examination of recovered rock
                 Undisturbed samples are taken by pushing a         fragments but provides only an indication of
                 thin-walled sample tube, usually 50mm              the likely rock strength. Where rock strengths
                 diameter (known as a U50), into the soil and       may have a significant impact on construction
                 collecting a sample of the soil contained in a     feasibility or costs, then further investigation by
                 relatively undisturbed state. Such samples yield   means of cored boreholes may be warranted.
                 information on structure and strength, and are
                 necessary for laboratory determination of shear    Wash Boring: The borehole is advanced by a
                 strength and compressibility.       Undisturbed    bit attached to the end of a hollow rod string,
                 sampling is generally effective only in cohesive   with water being pumped down the drill rods
                 soils.                                             and returned up the annulus of the borehole,
                                                                    carrying the drill cuttings.      Changes in
                 Details of the type and method of sampling         stratification can be determined from the
                 used are given on the attached logs.               return, together with information from “feel”
                                                                    and rate of penetration.




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 15

                 The borehole can be stabilised through the use       using a Cone Penetrometer in            general
                 of drilling mud as a circulating fluid. The term     accordance with AS 1289 6.5.1, 1999.
                 ‘mud’ encompasses a range of products
                 ranging from bentonite to polymers such as           In the tests, a 36mm diameter rod with a
                 Revert or Biogel.                                    conical tip is pushed continuously into the soil,
                                                                      the reaction being provided by a hydraulic
                 Continuous Core Drilling: A continuous core          ram system. Measurements are made of the
                 sample is obtained using a diamond tipped            end bearing resistance on the cone and the
                 core barrel. This technique provides a reliable      fractional resistance on a separate 135mm
                 (but    relatively   expensive)    method     of     long sleeve, immediately behind the cone.
                 investigation. In rocks, an NMLC triple tube         Pore Pressure is recovered through a pore ring
                 core barrel is used, which gives a core of about     located either within, or more usually
                 50mm diameter. The length of core recovered          immediately behind the cone/tip.
                 is compared to the length drilled and any
                 length not recovered is shown as CORE LOSS.          As penetration occurs (at a rate of
                                                                      approximately 20mm per second) and data is
                 Standard       Penetration    Tests:     Standard    recorded every 20mm of penetration, the
                 Penetration Tests (SPT) are used mainly in non-      results are presented graphically.
                 cohesive soils, but can also be used in cohesive
                 soils as a means of indicating density or            The information     provided     on    the   plot
                 strength and also of obtaining a disturbed           comprises:
                 sample. The test procedure is described in
                                                                             Cone resistance – expressed in mPa
                 Australian Standard 1289, “Methods of Testing
                                                                             Sleeve friction – expressed in kPa
                 Soils for Engineering Purposed”, Test 6.3.1.
                                                                             Friction ratio – the ratio of sleeve
                 The test is carried out in a borehole by driving a           friction to cone resistance expressed as
                 50mm diameter split sample tube with a                       a percentage.
                 tapered shoe, under the impact of a 63kg                    Pore pressure in kPa
                 hammer, with a free fall of 760mm. The sample               Tilt of probe (in degrees).
                 is driven in three successive 150mm increments
                 and the ‘N’ value is taken as the number of
                                                                      The ratios of the sleeve resistance to cone
                 blows for the last 300mm. In dense soils, hard
                                                                      resistance will vary with the type of soil
                 clays or weak rock, the full 450mm penetration
                                                                      encountered, with higher relative friction in
                 may not be practicable and the test is
                                                                      clays than in sands. Friction ratios of 1% to 2%
                 discontinued.
                                                                      are commonly encountered in sands and rising
                 The test results are reported in the following       to 2% to as high as 8%, and higher in organic
                 form:                                                soils.   Soil descriptions based on cone
                                                                      resistance and friction ratios are only inferred
                         In the case where full penetration is       and must not be considered as exact.
                          obtained with successive blow counts
                          for each 150mm of , say, 4, 6 and 7         Stratification can be inferred from the cone
                          blows, as                                   and friction traces and from experience and
                          N = 13                                      information from nearby boreholes, etc. Where
                          4, 6, 7                                     shown, this information is presented for general
                         In a case where the test is discontinued    guidance, but must be regarded as
                          short of full penetration, say after 15     interpretive.
                          blows for the first 150mm and 30 blows
                                                                      Dynamic Cone Penetrometers:
                          for the next 40mm, as
                          N > 30
                                                                      Dynamic Cone Penetrometer (DCP) tests are
                          15, 30/40mm
                                                                      carried out by driving a 16mm diameter rod
                                                                      into the ground with a 9kg sliding hammer
                 Cone Penetrometer Testing (CPT): Cone
                                                                      dropping 510mm and counting the blows for
                 Penetrometer Testing with or without pore
                                                                      successive 100mm increments of penetration.
                 pressure measurement (CPTu) is carried out




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 16

                 Logs                                                   for fill, it may be difficult to reliably determine
                                                                        the extent of the fill.
                 The borehole or test pit logs are an
                 interpretation of the subsurface conditions, and       Laboratory Testing
                 their reliability will depend to some extent on
                 the frequency of sampling and the method of            Laboratory testing is carried out in general
                 drilling or excavation.                                accordance with Australian Standard 1289
                                                                        ‘Methods of Testing Soil for Engineering
                 Interpretation of the information shown on the         Purposes’.
                 logs, and its application to design and
                 construction, should therefore take into               Site Anomalies
                 account the spacing of the boreholes or test
                                                                        In the event that conditions encountered on
                 pits, the method of drilling or excavation, the
                                                                        site during construction appear to vary from
                 frequency of sampling and testing and the
                                                                        those which were expected from the
                 possibility of other than “straight line” variations
                                                                        information contained in the report, the
                 between the boreholes or test pits. Subsurface
                                                                        company requests that it immediately be
                 conditions between boreholes or test pits may
                                                                        notified. Most problems are much more readily
                 vary significantly from conditions encountered
                                                                        resolved when conditions are exposed than at
                 at the borehole or test pit locations.
                                                                        some later stage.
                 Groundwater
                                                                        Review of Design
                 Where groundwater levels are measured in
                                                                        Where major civil or structural developments
                 boreholes, there  are   several potential
                                                                        are proposed or where only a limited
                 problems:
                                                                        investigation has been completed or where the
                          Although      groundwater        may   be    geotechnical conditions/constraints are quite
                           present, in low permeability soils it may    complex, it is prudent to have a design review.
                           enter the hole slowly or perhaps not at
                                                                        Site Inspection
                           all during the time it is left open.
                          A localised perched water table may
                                                                        Pacific Geotech would be pleased to provide
                           lead to an erroneous indication of the
                                                                        engineering        inspection services   for
                           true water table.
                                                                        geotechnical aspects of work to which this
                          Water table levels will vary from time to
                                                                        report is related:
                           time with seasons or recent weather
                           changes and may not be the same at           Requirements could range from:
                           the time of construction.
                          The use of water or mud as a drilling           i.    a site visit to confirm that conditions
                           fluid will mask any groundwater inflow.               exposed are no worse than those
                           Water has to be flushed from the hole                 interpreted, to
                           and drilling mud must be washed out            ii.    a visit to assist the contractor or other
                           of the hole or ‘reverted’ chemically if               site personnel in identifying various
                           water observations are to be made.                    soil/rock types such as appropriate
                 More reliable measurements can be made by                       footing or pier founding depths, or
                 installing standpipes from which ongoing                 iii.   full time engineering present on site.
                 monitoring can be undertaken.

                 Fill

                 The present of fill materials can often be
                 determined only by the inclusion of foreign
                 objects (e.g. bricks, steel ,etc.) or by distinctly
                 unusual colour, texture or fabric. Identification
                 of the extent of fill materials will also depend on
                 investigation methods and frequency. Where
                 natural soils similar to those at the site are used




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 17

                  Project No. PG-10899
                  November 2023
                  Ref: PG-10899, 2023-10-16, ASR VER 3
                  DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Investigation - Proposed Residence, 30 Mossman Court, Noosa Heads




                                                                                                                                            APPENDIX B
                                                                                                      BOREHOLE RECORD SHEETS




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 18

                                                                                                                                                                                                                                                                                                                                                                                                                     Borehole No.

                                                                                                                                                                                                                                                                                                                                                                                                                          BH01
                                                                                                                                                                                                                                                                                                                                                                                                                     Page 1 of 2

                                                                                                                                                                                                                                                                                                                                                              Project No.:             PG-10899

                                                                                                                                                                                                                   Client:                          DD Sunnyside CD Sunnyside Pty Ltd                                                                         Commenced:               06/10/2023
                                                                                                                                                                                                                   Project Name:                    Proposed Residence                                                                                        Logged By:               RR
                                                                                                                                                                                                                   Hole Location:                   30 Mossman Court, Noosa Heads                                                                             Checked By:
                                                                                                                                                                                                                   Hole Position:
                                                                                                                                                                                                                   Drill Model and Mounting:                          Compac 018                                                                              RL Surface:         No survey
                                                                                                                                                                                                                   Hole Diameter:                                                                                                                             Datum:              AHD              Operator:    RR

                                                                                                                                                                                                                                         Drilling Information                                                                            Soil Description                                                           DCP



                                                                                                                                                                                                                                                                                                       Classification
                                                                                                                                                                                                                                                                                       Graphic Log
                                                                                                                                                                                                                                            Samples                                                                                              Material Description
                                                                                                                                                                                                                                                           Recovery




                                                                                                                                                                                                                                             Tests                                                                                       Fraction, Colour, Structure, Bedding,
                                                                                                                                                                                                                                                                                                       Symbol
                                                                                                                                                                                                               Method

                                                                                                                                                                                                                        Casing




                                                                                                                                                                                                                                            Remarks                                                                                        Plasticity, Sensitivity, Additional
                                                                                                                                                                                                                                 Water




                                                                                                                                                                                                                                                                      RL    Depth
                                                                                                                                                                                                                                                                      (m)    (m)                                                                                                               0       5       10     15    20   25

                                                                                                                                                                                                                                                                                                                        Concrete (CCT)
                                                                                                                                                                                                                                                                                0.15
                                                                                                                                                                                                                                                                                                          SP            FILL SAND (SP) Very loose to loose, fine to medium grained, pale
                                                                                                                                                                                                                                                                                                                        yellow brown, moist.


                                                                                                                                                                                                                                         ASS 0.50-1.00 m




                                                                                                                                                                                                                                                                            1
                                                                                                                                                                                                                                         ASS 1.00-1.50 m
                                                                                                                                                                                                                                         D 1.10-1.50 m




                                                                                                                                                                                                                                         ASS 1.50-2.00 m
       ER PACGEO 1.01.2 LIB.GLB Log PACGEO BOREHOLE PG-10899.GPJ <<DrawingFile>> 17/10/2023 10:45 10.03.00.09 Datgel Lab and In Situ Tool - DGD | Lib: pacgeo 1.01.2 2022-05-25 Prj: Precise 1.01 2016-11-23




                                                                                                                                                                                                                                                                            2
                                                                                                                                                                                                                                         ASS 2.00-2.50 m

                                                                                                                                                                                                                                                                                2.30
                                                                                                                                                                                                                                                                                                          SP            NATURAL SAND (SP) Medium dense, fine to medium grained, pale
                                                                                                                                                                                                                                                                                                                        yellow brown, moist.
                                                                                                                                                                                                               AD/T




                                                                                                                                                                                                                                         ASS 2.50-3.00 m
                                                                                                                                                                                                                                         D 2.60-3.00 m
                                                                                                                                                                                                                                                                                2.80
                                                                                                                                                                                                                                                                                                          SP            SAND (SP) Medium dense to dense, fine to medium grained, pale grey,
                                                                                                                                                                                                                                                                                                                        wet.
                                                                                                                                                                                                                                                                            3
                                                                                                                                                                                                                                         ASS 3.00-3.50 m




                                                                                                                                                                                                                                         ASS 3.50-4.00 m




                                                                                                                                                                                                                                                                            4
                                                                                                                                                                                                                                                                                4.10
                                                                                                                                                                                                                                         D 4.10-4.50 m                                                    SP            SAND (SP) Medium dense, fine to medium grained, pale grey, wet.




                                                                                                                                                                                                                        Method                                                                       Water                               Samples and Tests                  Remarks
                                                                                                                                                                                                                   AS - Auger                                                                 Level (Date)                        U - Undisturbed Sample
                                                                                                                                                                                                                   RR - Rock Roller                                                                                               D - Disturbed Sample                      1. Groundwater encountered at 2.80m.
                                                                                                                                                                                                                   WB- Washbore                                                               Inflow                              SPT - Standard Penetration Test           2. DCP refusal at 3.07m.
                                                                                                                                                                                                                                                                                                                                  B - Bulk Sample                           3. Standpipe installed to 3.15m.


                                                                                                                                                                                                                                                                                                                                      Classification Symbols and
                                                                                                                                                                                                                          Support                                                                                                          Soil Descriptions
                                                                                                                                                                                                                         C - Casing
                                                                                                                                                                                                                                                                                                                                         Based on Unified Soil
                                                                                                                                                                                                                                                                                                                                         Classification System



Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 19

                                                                                                                                                                                                                                                                                                                                                                                                                   Borehole No.

                                                                                                                                                                                                                                                                                                                                                                                                                        BH01
                                                                                                                                                                                                                                                                                                                                                                                                                   Page 2 of 2

                                                                                                                                                                                                                                                                                                                                                            Project No.:             PG-10899

                                                                                                                                                                                                                   Client:                          DD Sunnyside CD Sunnyside Pty Ltd                                                                       Commenced:               06/10/2023
                                                                                                                                                                                                                   Project Name:                    Proposed Residence                                                                                      Logged By:               RR
                                                                                                                                                                                                                   Hole Location:                   30 Mossman Court, Noosa Heads                                                                           Checked By:
                                                                                                                                                                                                                   Hole Position:
                                                                                                                                                                                                                   Drill Model and Mounting:                        Compac 018                                                                              RL Surface:         No survey
                                                                                                                                                                                                                   Hole Diameter:                                                                                                                           Datum:              AHD              Operator:    RR

                                                                                                                                                                                                                                         Drilling Information                                                                         Soil Description                                                            DCP



                                                                                                                                                                                                                                                                                                     Classification
                                                                                                                                                                                                                                                                                     Graphic Log
                                                                                                                                                                                                                                            Samples                                                                                            Material Description
                                                                                                                                                                                                                                                         Recovery




                                                                                                                                                                                                                                             Tests                                                                                     Fraction, Colour, Structure, Bedding,
                                                                                                                                                                                                                                                                                                     Symbol
                                                                                                                                                                                                               Method

                                                                                                                                                                                                                        Casing




                                                                                                                                                                                                                                            Remarks                                                                                      Plasticity, Sensitivity, Additional
                                                                                                                                                                                                                                 Water




                                                                                                                                                                                                                                                                    RL    Depth
                                                                                                                                                                                                                                                                    (m)    (m)                                                                                                               0       5       10     15    20   25

                                                                                                                                                                                                                                                                                                        SP            SAND (SP) Medium dense, fine to medium grained, pale grey, wet.
                                                                                                                                                                                                                                                                                                                      (continued)




                                                                                                                                                                                                                                                                          6




                                                                                                                                                                                                                                                                              6.60
       ER PACGEO 1.01.2 LIB.GLB Log PACGEO BOREHOLE PG-10899.GPJ <<DrawingFile>> 17/10/2023 10:45 10.03.00.09 Datgel Lab and In Situ Tool - DGD | Lib: pacgeo 1.01.2 2022-05-25 Prj: Precise 1.01 2016-11-23




                                                                                                                                                                                                                                                                                                       SM             Silty SAND (SM) Dense to very dense, fine to medium grained, dark
                                                                                                                                                                                                                                                                                                                      brown, wet (indurated sand).
                                                                                                                                                                                                               AD/T




                                                                                                                                                                                                                                                                          7




                                                                                                                                                                                                                                                                          8




                                                                                                                                                                                                                                         D 8.60-9.00 m



                                                                                                                                                                                                                                                                              9.00
                                                                                                                                                                                                                                                                          9
                                                                                                                                                                                                                                                                                                                      Hole Terminated at 9.00 m




                                                                                                                                                                                                                        Method                                                                     Water                              Samples and Tests                   Remarks
                                                                                                                                                                                                                   AS - Auger                                                               Level (Date)                       U - Undisturbed Sample
                                                                                                                                                                                                                   RR - Rock Roller                                                                                            D - Disturbed Sample                       1. Groundwater encountered at 2.80m.
                                                                                                                                                                                                                   WB- Washbore                                                             Inflow                             SPT - Standard Penetration Test            2. DCP refusal at 3.07m.
                                                                                                                                                                                                                                                                                                                               B - Bulk Sample                            3. Standpipe installed to 3.15m.


                                                                                                                                                                                                                                                                                                                                    Classification Symbols and
                                                                                                                                                                                                                          Support                                                                                                        Soil Descriptions
                                                                                                                                                                                                                         C - Casing
                                                                                                                                                                                                                                                                                                                                       Based on Unified Soil
                                                                                                                                                                                                                                                                                                                                       Classification System



Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 20

                                                                                                                                                                                                                                                                                                                                                                                                                 Borehole No.

                                                                                                                                                                                                                                                                                                                                                                                                                      HA02
                                                                                                                                                                                                                                                                                                                                                                                                                 Page 1 of 1

                                                                                                                                                                                                                                                                                                                                                          Project No.:             PG-10899

                                                                                                                                                                                                                   Client:                         DD Sunnyside CD Sunnyside Pty Ltd                                                                      Commenced:               06/10/2023
                                                                                                                                                                                                                   Project Name:                   Proposed Residence                                                                                     Logged By:               RR
                                                                                                                                                                                                                   Hole Location:                  30 Mossman Court, Noosa Heads                                                                          Checked By:
                                                                                                                                                                                                                   Hole Position:
                                                                                                                                                                                                                   Drill Model and Mounting:                      Hand Auger                                                                              RL Surface:         No survey
                                                                                                                                                                                                                   Hole Diameter:                                                                                                                         Datum:              AHD              Operator:    RR

                                                                                                                                                                                                                                         Drilling Information                                                                       Soil Description                                                            DCP



                                                                                                                                                                                                                                                                                                   Classification
                                                                                                                                                                                                                                                                                   Graphic Log
                                                                                                                                                                                                                                            Samples                                                                                          Material Description
                                                                                                                                                                                                                                                       Recovery




                                                                                                                                                                                                                                             Tests                                                                                   Fraction, Colour, Structure, Bedding,
                                                                                                                                                                                                                                                                                                   Symbol
                                                                                                                                                                                                               Method

                                                                                                                                                                                                                        Casing




                                                                                                                                                                                                                                            Remarks                                                                                    Plasticity, Sensitivity, Additional
                                                                                                                                                                                                                                 Water




                                                                                                                                                                                                                                                                  RL    Depth
                                                                                                                                                                                                                                                                  (m)    (m)                                                                                                               0       5       10     15    20   25

                                                                                                                                                                                                                                                                                                     SM             FILL Silty SAND (SM) Loose, fine to medium grained, dark brown, with
                                                                                                                                                                                                                                                                                                                    fine sized gravel, dry.
                                                                                                                                                                                                               HA




                                                                                                                                                                                                                                                                            0.60
                                                                                                                                                                                                                                                                                                      SP            FILL SAND (SP) Loose, fine to medium grained, pale yellow brown,
                                                                                                                                                                                                                                                                                                                    moist to dry.


                                                                                                                                                                                                                                                                            1.00
                                                                                                                                                                                                                                                                        1
                                                                                                                                                                                                                                                                                                                    Hole Terminated at 1.00 m
       ER PACGEO 1.01.2 LIB.GLB Log PACGEO BOREHOLE PG-10899.GPJ <<DrawingFile>> 17/10/2023 10:45 10.03.00.09 Datgel Lab and In Situ Tool - DGD | Lib: pacgeo 1.01.2 2022-05-25 Prj: Precise 1.01 2016-11-23




                                                                                                                                                                                                                                                                        2




                                                                                                                                                                                                                                                                        3




                                                                                                                                                                                                                                                                        4




                                                                                                                                                                                                                        Method                                                                   Water                              Samples and Tests                   Remarks
                                                                                                                                                                                                                   AS - Auger                                                             Level (Date)                       U - Undisturbed Sample
                                                                                                                                                                                                                   RR - Rock Roller                                                                                          D - Disturbed Sample                       1. Groundwater not encountered.
                                                                                                                                                                                                                   WB- Washbore                                                           Inflow                             SPT - Standard Penetration Test            2. DCP refusal at 2.38m.
                                                                                                                                                                                                                                                                                                                             B - Bulk Sample


                                                                                                                                                                                                                                                                                                                                  Classification Symbols and
                                                                                                                                                                                                                          Support                                                                                                      Soil Descriptions
                                                                                                                                                                                                                         C - Casing
                                                                                                                                                                                                                                                                                                                                     Based on Unified Soil
                                                                                                                                                                                                                                                                                                                                     Classification System



Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 21

                  Project No. PG-10899
                  November 2023
                  Ref: PG-10899, 2023-10-16, ASR VER 3
                  DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Investigation - Proposed Residence, 30 Mossman Court, Noosa Heads




                                                                                                                                            APPENDIX C
                                                                                         LABORATORY TEST CERTIFICATES




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 22

                                                                               pH Screen Report
         CLIENT:                           DD Sunnyside CD Sunnyside Pty Ltd                  PROJECT NUMBER:                                          PG-10899
         ADDRESS:                           30 Mossman Court, Noosa Heads                     REPORT NUMBER:                             23-536           Rev. No.0
                                                                                              REPORT DATE:                                             10.10.23
         PROJECT NAME:                               Proposed Residence
                                                                                              TEST METHOD:                                              ENV04

                                                                              SAMPLE LOCATION
                                      SAMPLING METHOD:                                                                                 Disturbed
                                         SAMPLED BY:                                                                                 Pacific Geotech
                                        DATE SAMPLED:                                                                                    6.10.23
                                        DATE RECEIVED:                                                                                   9.10.23
                                         DATE TESTED:                                                                                    9.10.23


                                           Sample
             Lab Ref. No.                                              Depth (m)                     pH                   pHFOX                   pHFOX Reaction Rating
                                          Description
         E23-536-1                              BH01                           0.5                   6.4                       5.1                             X
         E23-536-2                              BH01                           1.0                   6.3                       5.2                             X
         E23-536-3                              BH01                           1.5                   6.6                       5.1                             X
         E23-536-4                              BH01                           2.0                   6.5                       5.1                             X
         E23-536-5                              BH01                           2.5                   6.5                       5.1                             X
         E23-536-6                              BH01                           3.0                   5.7                       3.1                             XX
         E23-536-7                              BH01                           3.5                   5.2                       3.0                            XXXX
         E23-536-8                              BH01                           4.0                   4.8                       3.0                            XXXX

                                                             pH Screen Reaction Rating Table
                                                        Reaction Scale                            Reaction
                                                                  X                           Slight Reaction
                                                                  XX                          Moderate Reaction
                                                                  XXX                         High Reaction
                                                                  XXXX                        Vigorous Reaction, gas evolved, heat generated

         Pacific Geotech accepts no responsibilty for the collection and transport of samples submitted by external parties.
         Measurement uncertainty data is available upon request. LOR denotes Limit of Reporting
         All samples are analysed on an as received basis and the results in rhis report pertain only to the sample submitted.
         This report supercedes any previous report(s) issued with this reference number. This document shall not be reproduced except in full.

                           Accredited for Compliance with ISO/IEC 17025 - Testing                          Approved Signatory

                                 Pacific Geotech Pty Ltd - Accreditation No. 21130
                                                                                                               Daryl Surkitt
                                      Gold Coast Laboratory - Site No. 25487                       Environmental Laboratory Manager


     Form ER003.1.




                                                                                                                                                                      Page 1 of 1
Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 23

                                                                                                       Acid Sulfate Soil Report
         CLIENT:                                                     DD Sunnyside CD Sunnyside Pty Ltd                  PROJECT NUMBER:                                                         PG-10899
         ADDRESS:                                                 30 Mossman Court, Noosa Heads                         REPORT NUMBER:                                         23-537                Rev. No.0
         PROJECT NAME:                                                 Proposed Residence                               REPORT DATE:                                                            13.10.23


                                                                                                                   SAMPLE LOCATION
                                                  SAMPLING METHOD:                                                                                                         Disturbed
                                                     SAMPLED BY:                                                                                                         Pacific Geotech
                                                    DATE SAMPLED:                                                                                                            6.10.23
                                                    DATE RECEIVED:                                                                                                           9.10.23
                                                     DATE TESTED:                                                                                                            9.10.23
                                            PREPERATION/ANALYSIS METHOD:                                                                                                 ENV01/ENV02


         Lab Ref Number                                                             E23-537-1            E23-537-2       E23-537-3            E23-537-4
         Sample Description                            Unit             LOR           BH01                 BH01            BH01                 BH01
         Depth (m)                                                                     1.0                  2.0             3.0                  4.0
         pHKCL                                        pH Unit            0.1              6.4                     6.6          5.3                 5.1
         Chromium Reducible Sulfur                    %w/w S           0.005            <0.005                0.017          0.037                0.056
         Chromium Reducible Sulfur                   mol H+/t             3                <3                     11           23                   35
         TAA pH to 6.5                               mol H+/t             2                <2                     <2           <2                   <2
         s-TAA pH to 6.5                              %w/w S           0.005            <0.005               <0.005          <0.005              <0.005
         KCl Ext S                                    %w/w S           0.005             0.006                0.005          0.006                0.006
         HCl Ext S                                    %w/w S           0.005             0.012                0.010          0.015                0.012
         Retained Acidity (SNAS)                      %w/w S           0.005              N/R                     N/R         N/R                  N/R
         Retained Acidity (SNAS)                     mol H+/t             3               N/R                     N/R         N/R                  N/R
         ANC                                         %CaCO3              0.1              0.1                     0.1          0.1                 0.1
         ANC                                         mol H+/t             5                12                     13           13                   11
         Net Acidity                                 mol H+/t             5                <5                     11           23                   35
         Net Acidity                                  %w/w S           0.005            <0.005                0.018          0.037                0.056
         Net Acidity - ANC                           mol H+/t             1                <1                     <1           10                   24
         Liming Rate                                kg CaCO3/t            1                <1                      1            2                    3
         Liming Rate - ANC                          kg CaCO3/t            1                <1                     <1            1                    2

         Liming rate only includes ANC when its effectiveness has been corroborated by simulative oxidation procedures such as incubation. Unless corroborated, the results for ANC analyses should not be used when determining Net Acidity for
         for comparison with action criteria. The Liming Rate-ANC calculation is only inluded when the amount of acid neutralising present in the soil is capable of buffering the soil at pH 6.5 or above. A liming safety factror of 1.5 has been applied.
         Results apply to samples that have been dried at 85±5oC. LOR denotes Limit of Reporting. N/R denotes Not Required. The results in this report pertain only to the samples as received. This document shall not be reproduced except in full.
         Method uncertainty data is available at www.pacgeo,com,au/safety-and -quality-assurance. This report supercedes anty previous report(s) isssued with this reference number.
         Pacific Geotech accepts no responsibilty for the collection and transport of samples submitted by external parties.




                                                        Accredited for Compliance with ISO/IEC 17025 - Testing                              Approved Signatory

                                                              Pacific Geotech Pty Ltd - Accreditation No. 21130
                                                                                                                                                Daryl Surkitt
                                                                  Gold Coast Laboratory - Site No. 25487                              Environmental Laboratory Manager


         Form ER004.1




                                                                                                                                                                                                                                                               Page 1 of 1
Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 24

                  Project No. PG-10899
                  November 2023
                  Ref: PG-10899, 2023-10-16, ASR VER 3
                  DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Investigation - Proposed Residence, 30 Mossman Court, Noosa Heads




                                                                                                                                            APPENDIX D
                                                                                                                                              SITE PLAN




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 25

                                       HA02




                                                               BH01




                                          Drawn
                                                   Project:    Proposed Residence
                                           RM
                                                                                                   Drawing No.
                                           Date
                                                   Location:   30 Mossman Court, Noosa Heads                     A4
                                          Oct 23
                                                                                                   PG-10899-01
                                         Checked
                                                    Client:    DD Sunnyside CD Sunnyside Pty Ltd
Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 26

                  Project No. PG-10899
                  November 2023
                  Ref: PG-10899, 2023-10-16, ASR VER 3
                  DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Investigation - Proposed Residence, 30 Mossman Court, Noosa Heads




                                                                                                                                            APPENDIX E
                                                                   ACID SULFATE SOIL MANAGEMENT PLAN




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 27

                  Project No. PG-10899                                                                                                        Page | 1
                  November 2023
                  Ref: PG-10899, 2023-10-16, ASSMP VER 2
                  DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Management Plan – Proposed Residence, 30 Mossman Court, Noosa Heads




                                    ACID SULFATE SOIL MANAGEMENT PLAN (ASSMP)
                                                      PROPOSED RESIDENCE
                                                30 MOSSMAN COURT, NOOSA HEADS
                  Objective                            The objective of the ASSMP is to control any acid generation from
                                                       insitu ASS materials and to restrict to an acceptable level any
                                                       potential on-site and off-site environmental impacts. A further
                                                       objective is to manage earthworks activities and provide measures
                                                       to maintain water quality within the site and in adjacent areas.
                  Proposed                             It is understood that the proposed development is to comprise the
                  Development                          construction of a two storey residence with a basement.
                                                       Earthworks are envisaged to consist of cuts of up to 3m for the
                                                       basement.        A total volume of material to be disturbed is
                                                       approximately 900m3. Additional investigation and testing will be
                                                       required to confirm the results and recommendations of this
                                                       management plan.
                  Subsurface                           Mapping
                  Conditions                           The site is located in an area that is mapped on the Noosa Council
                                                       Acid Sulfate Soils Mapping as Disturbed Land likely to contain ASS.
                                                       ASS Investigation
                                                       Drilling and sampling encountered a reasonably consistent profile
                                                       of sand that:
                                                       • did not indicate any obvious ASS presence from a visual and
                                                             tactile perspective in the fill or the natural profile.
                                                       •     indicated that the upper level sands were not acid sulfate soils
                                                             and the lower level sands below 3.0m indicated a low level of
                                                             acid sulfate soil present.
                                                       •     had the highest liming rate required to neutralise the acidity of
                                                             4kg/m3 (based on laboratory testing of selected samples) for
                                                             the lower level sands.
                                                       •     The proposed excavations for the basement (up to 3.0m
                                                             depth)are not expected to disturb the acid sulfate soils but may
                                                             just indicate the acid sulfate strata.
                  Management                           To mitigate and manage potential adverse environmental impacts
                  Strategy                             during site construction operations, the following will be
                                                       undertaken:
                                                       • an ASS consultant should review the site earthworks schedule
                                                           and plan of operations;
                                                       •     adoption of appropriate erosion control measures to limit
                                                             sediment loss due to run-off from site works area;
                                                       •     where excavation below the water table, or if disturbance of
                                                             any silty sands is necessary, a materials handling and
                                                             management strategy and procedures for lime treatment of
                                                             any disturbed material will be required;
                                                       •     monitoring and treatment (if necessary) of waters in detention
                                                             basins to a level suitable for discharge into external waterways;
                                                             and
                                                       •     site supervision by approved persons and regular reporting to
                                                             the Project Engineer/Manager throughout the construction
                                                             phase.




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 28

                  Project No. PG-10899                                                                                                        Page | 2
                  November 2023
                  Ref: PG-10899, 2023-10-16, ASSMP VER 2
                  DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Management Plan – Proposed Residence, 30 Mossman Court, Noosa Heads




                  Tasks/Actions                        Investigations of ASS to date have targeted soils to a maximum
                                                       depth of 4.0m below the existing ground level. Zones of materials
                                                       with nett acidity above the action criteria have been identified
                                                       over the site at depths greater than 3m below ground level. The
                                                       materials to a depth of approximately 3.0m have been shown by
                                                       testing to not contain acid sulfate. If material below 3m is disturbed
                                                       they will require lime treatment to neutralize acidity.

                                                       In order to assess potential impacts and treatment requirements for
                                                       ASS, the Earthworks Contractor shall prepare an earthworks
                                                       schedule for the proposed construction activities prior to
                                                       commencement of the construction and earthworks activities.
                                                       ASS Treatment:
                                                       The spoil to be removed from site will either be treated onsite prior
                                                       to removal, or:
                                                       • treated on-site in accordance with the procedures given below;
                                                           or
                                                             −   A temporary stockpile and treatment area will be
                                                                 established where all excavated material may be
                                                                 conditioned (dried) and lime treated, for subsequent use for
                                                                 site landscaping or general fill requirements.
                                                             − Bunding will be constructed around the perimeter of the
                                                                 designated ASS treatment pad to intersect and contain run-
                                                                 off from the pad during the soil treatment operations.
                                                             − A suitably sized drain or temporary retention basin will be
                                                                 constructed to collect drainage water from the treatment
                                                                 pad in the vent of heavy rainfall during the construction
                                                                 period. This will be constructed in a manner to protect
                                                                 water quality in adjacent waterways.
                                                             − Alternatively, the basement excavation can be used as a
                                                                 treatment platform with drainage water or run-off collected
                                                                 in the retention basin will be tested to determine the quality
                                                                 of the water.        If the water quality falls outside the
                                                                 performance indicators (described below), the water will
                                                                 be treated prior to discharge from the site.
                                                             − The excavated spoil will be spread out in a designated
                                                                 treatment area in layers up to 0.25m loose thickness. Aglime
                                                                 with a neutralising value of 100% will be applied evenly over
                                                                 the surface and thoroughly blended into the spoil at a
                                                                 uniform minimum rate of 4kg (CaC0 3 )/m3.
                                                             − When incorporation of the lime is complete, Chromium Suite
                                                                 validation testing of the treated spoil will be carried out to
                                                                 establish that sufficient lime has been added (and uniformly
                                                                 mixed) to neutralise the acid generation potential of the
                                                                 spoil. The validation test will be deemed to have passed if
                                                                 the net acidity is 18 mol H+/t. A higher result will require the
                                                                 application of additional lime, until a satisfactory validation
                                                                 result has been achieved.
                                                             − Once lime treatment is complete, the treated spoil will be
                                                                 removed from site or may then be stockpiled for later use
                                                                 for landscaping or for general site fill requirements.
                                                             − Selection of the most appropriate test methods and
                                                                 determination of liming requirements for neutralisation will
                                                                 be the responsibility of the ASS Consultant.
                                                       •     Treated at an off-site facility in accordance with the approved
                                                             ASSMP for the facility.




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 29

                  Project No. PG-10899                                                                                                        Page | 3
                  November 2023
                  Ref: PG-10899, 2023-10-16, ASSMP VER 2
                  DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Management Plan – Proposed Residence, 30 Mossman Court, Noosa Heads




                  Performance                          ASS
                  Indicators                           Chromium Suite testing carried out for validation of applied liming
                                                       rates will be deemed to be acceptable if the net acidity recorded
                                                       is 18 mol H+/t.

                                                       Water
                                                       Laboratory testing of retained water will be carried out for pH,
                                                       electrical conductivity (ED), iron (Fe), aluminium (Al), dissolved
                                                       oxygen and turbidity. Levels of these parameters considered
                                                       acceptable are as follows:

                                                       pH                              6.5 to 8.5 pH units
                                                       EC                              <1,500 S/cm
                                                       Fe                              <1,000 ug/L
                                                       Al                              <5.0 ug/L if pH <= 6.5 pH units
                                                                                       <100.0 ug/L if pH > 6.5 pH units
                                                       Turbidity                       <20NTU
                                                       Dissolved Oxygen                >80% saturated

                                                       Testing for the Fe and Al will only be necessary if the pH of the water
                                                       falls below pH 6.0.
                  Frequency/Timing                     ASS
                                                       The sampling and testing of any lime treated material will be
                                                       subject to QA testing, which will be repeated until satisfactory
                                                       results are obtained. Chromium Suite validation testing will be
                                                       carried out at a rate of 1 test/250m3 of treated spoil.

                                                       Water
                                                       The following monitoring frequency is recommended during
                                                       dewatering operations (if required):
                                                       • daily measurements of pH, dissolved oxygen (DO), turbidity and
                                                          suspended solids; and
                                                       •     weekly measurements of the full list of Performance Indicators
                                                             nominated above (if dewatering has been required).
                                                       If the results of monitoring prove consistent, the frequency of
                                                       monitoring may be reduced, subject to the approval of the ASS
                                                       Consultant.
                  Corrective Action                    ASS
                                                       If lime treatment of ASS is unsuccessful, whereby performance
                                                       targets are not being met as indicated by the QA and water quality
                                                       testing procedures:
                                                       • The earthworks schedule will be reassessed and action taken to
                                                            determine the problems causing the breach of standards.
                                                       •     If the problems are related to ineffective implementation of the
                                                             ASSMP, then the plan will be audited to ensure improved
                                                             implementation. Monitoring and testing will be increased to
                                                             ensure compliance with the established standards.
                                                       •     Any significant changes to the ASSMP will be subject to
                                                             discussions with and the approval of, the relevant regulatory
                                                             authorities.
                                                       Water
                                                       Compliance failures regarding specified performance criteria shall
                                                       be recorded including the date, time, nature of failure and actions
                                                       taken to rectify the situation. Monitoring results should be reviewed




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 30

                  Project No. PG-10899                                                                                                        Page | 4
                  November 2023
                  Ref: PG-10899, 2023-10-16, ASSMP VER 2
                  DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Management Plan – Proposed Residence, 30 Mossman Court, Noosa Heads




                                                       in relation to site management practices on a regular basis and
                                                       improvement strategies should be developed as required.
                  Responsibility                       The satisfactory implementation of the ASSMP will be the
                                                       responsibility of the Earthworks Contractor. The ASS Consultant will
                                                       ensure that:
                                                       • the contractor is made aware of site specific conditions and
                                                           implications for the management of ASS within the site; and
                                                       •     correct methods for the collection of samples and testing are
                                                             employed and the reporting of results to the relevant site
                                                             authorities.
                                                       The Earthworks Contractor’s responsibilities will include:

                                                       •     awareness of site conditions and requirements for the
                                                             implementation of the ASSMP;
                                                       •     modifying earthworks/construction procedures to comply with
                                                             the ASSMP and erosion control plan;
                                                       •     propose any corrective action measures to be approved by
                                                             the ASS Consultant; and
                                                       •     implementing approved correction actions.
                  Reporting                            The ASS Consultant shall report to the Project Manager on a regular
                                                       basis on the performance of the site management plan.

                                                       The Contractor’s Representative shall report to the Project
                                                       Manager and to the ASS Consultant on:

                                                       •     the effectiveness of the operating strategies;
                                                       •     problems in implementing the ASSMP management strategies;
                                                       •     compliance with testing requirements run-off control and
                                                             materials handling; and
                                                       •     effectiveness of any corrective action adopted.




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 31

                                                                                              ADG Consulting Pty Ltd          All Correspondence
                                                                                              ACN: 630 555 225                PO Box 6405
                                                                                              ABN: 98 630 555 225             Yatala DC QLD 4207


                                                                                              P 07 3801 1564
                                                                                              E [email protected]
                                                                                              W adgconsulting.com.au




                                                                   NOOSA COUNCIL
                                                                REFERENCE DOCUMENT
                                                                OPW23/0189 23 FEB 2024




                              Dewatering Management Plan
                              Proposed Residential Development:
                              Lot 149 on N21859, 30 Mossman Court, Noosa Heads, Queensland




                              September 2023




                              Prepared for:
                              David & Craig Dodd
                              c/‐ SCG Consulting Engineers




                          Acid Sulfate Soil Assessment      On‐site Wastewater Management      Contaminated Land Assessment & Remediation
                          Dewatering Management          Environmental Management Plans     Surface & Groundwater Investigation & Monitoring

Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 32

                                                                                                                         ADG Consulting Pty Ltd



                                                                              Report details



                              Project ref:                    ADG1580.23
                              ADG Project Contact:            Michael Campbell

                              Report title:                   Dewatering Management Plan
                                                              Proposed Residential Development:
                                                              Lot 149 on N21859, 30 Mossman Court, Noosa Heads, Queensland


                              Version:                        Rev0
                              Author(s):                      ADG
                              Reviewer:                       Michael Campbell


                              Client:                         David & Craig Dodd
                                                              c/‐ SCG Consulting Engineers
                              Client contact:                 Tom Harrington – SCG Consulting Engineers


                              Distribution date:              28 September 2023
                              Distributed to:                 SCG Consulting Engineers
                              Copies:                         1 PDF



                              ADG Consulting Pty Ltd




                              Michael Campbell BEnvSc, BSc[Hons],
                              DipProjMgt, DipOHS, DipBusMgt, DipBus(Quality Auditing)
                              MEIANZ, MALGA, MASSI
                              Director & Principal Environmental Scientist

                              Date: 28 September 2023


                              This document and all its content is copyright. Apart from fair dealing for the purposes of study, research, criticism
                              and/or review as permitted under the Copyright Act 1968, no part of the content may be reproduced, reused or
                              redistributed without the prior written permission of ADG Consulting Pty Ltd.




                        ADG1580.23 Dewatering Management Plan_Rev0_28.09.23                                                                  Page ii



Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 33

                                                                                                    ADG Consulting Pty Ltd



                                                                             Table of Contents
                      1        INTRODUCTION                                                                           1
                      1.1      PROPOSED DEVELOPMENT                                                                   1
                      1.2      RELEVANT GUIDELINES                                                                    1
                      1.3      GENERAL ENVIRONMENTAL DUTY                                                             1
                      1.4      DMP OBJECTIVES                                                                         2
                      1.5      SCOPE OF WORK                                                                          2
                      2        SITE CHARACTERISTICS                                                                   3
                      2.1      PROPERTY DESCRIPTION                                                                   3
                      2.2      SURROUNDING ENVIRONMENT                                                                3
                      2.3      TOPOGRAPHY                                                                             3
                      2.4      GEOLOGY & SOILS                                                                        3
                      2.5      HYDROGEOLOGY                                                                           3
                      3        PREVIOUS INVESTIGATIONS                                                                4
                      3.1      DOUGLAS PARTNERS PTY LTD 2021                                                          4
                      3.1.1    SOILS                                                                                  4
                      3.1.2    GROUNDWATER                                                                            4
                      3.2      GROUNDWATER QUALITY                                                                    5
                      4        WATER QUALITY OBJECTIVES                                                               6
                      4.1      RECEIVING ENVIRONMENT                                                                  6
                      4.2      DEVELOPMENT OF WATER QUALITY OBJECTIVES                                                6
                      4.3      PROPOSED WATER QUALITY OBJECTIVES                                                      7
                      5        DEWATERING METHODOLOGY                                                                 9
                      5.1      BASEMENT EXCAVATION AND SHORING                                                       9
                      5.2      GROUNDWATER EXTRACTION                                                                9
                      5.3      EXTRACTION/DISCHARGE RATES AND VOLUME                                                 9
                      5.3.1    DEWATERING EXTRACTION CALCULATION BASED ON SUBSURFACE SOIL PROFILE                    9
                      5.4      DEWATERING DURATION                                                                  10
                      5.5      GROUNDWATER DRAWDOWN                                                                 10
                      5.6      GROUNDWATER TREATMENT                                                                10
                      5.7      NOMINATED HOLD POINTS                                                                10
                      6        WATER QUALITY MANAGEMENT                                                             12
                      6.1      RESPONSIBILITY                                                                       12
                      6.2      OPERATIONAL POLICY                                                                   12
                      6.3      PERFORMANCE CRITERIA                                                                 12
                      6.4      IMPLEMENTATION STRATEGY                                                              12
                      6.4.1    GROUNDWATER TREATMENT SYSTEMS                                                        12
                      6.4.2    DEWATERING STRATEGY                                                                  13
                      6.4.3    INITIAL PUMP‐OUT                                                                     13
                      6.5      MONITORING                                                                           13
                      6.5.1    VISUAL MONITORING                                                                    13
                      6.5.2    WATER QUALITY MONITORING                                                             13
                      6.5.3    MONITORING RESPONSIBILITIES                                                          14
                      6.6      MAINTENANCE                                                                          15
                      6.7      REPORTING                                                                            15
                      6.8      CONTINGENCIES                                                                        15
                      7        NOISE & ODOUR MANAGEMENT                                                             17
                      7.1      RESPONSIBILITY                                                                       17
                      7.2      OPERATIONAL POLICY                                                                   17
                      7.3      PERFORMANCE CRITERIA                                                                 17
                      7.4      IMPLEMENTATION STRATEGY                                                              17
                      7.4.1    NOISE                                                                                17




                          ADG1580.23 Dewatering Management Plan_Rev0_28.09.23                                       Page iii



Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 34

                                                                                ADG Consulting Pty Ltd



                      7.4.2    ODOUR                                                            17
                      7.5      MONITORING                                                       17
                      7.6      REPORTING                                                        18
                      7.7      CONTINGENCIES                                                    18
                      8        LIMITATIONS                                                      19
                      9        REFERENCES                                                       20
                      APPENDIX A: FIGURES
                      APPENDIX B: DRDMW LICENCED BORE SEARCH
                      APPENDIX C: PRELIMINARY CONCEPT PLANS
                      APPENDIX D: DEWATERING CALCULATION OUTPUT




                          ADG1580.23 Dewatering Management Plan_Rev0_28.09.23                   Page iv



Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 35

                                                                                                                     ADG Consulting Pty Ltd


                      1        Introduction
                               ADG Consulting Pty Ltd (ADG) was engaged by David & Craig Dodd care of SCG Consulting Engineers (SCG)
                               to prepare a Dewatering Management Plan (DMP) for the proposed residential development within
                               property described as Lot 149 on N21859, situated at 30 Mossman Court, Noosa Heads, Queensland.
                      1.1      Proposed development
                               The proposed development comprises the construction of a two‐storey residential building overlying a
                               single level in‐ground basement on the 610 m2 site. The supplied information indicates that excavations
                               will extend to a maximum depth of approximately 2.4 m below ground level (bgl; existing), corresponding
                               to a maximum excavation elevation of approximately RL ‐0.7 m AHD (assuming 400 mm basement slab
                               thickness). Localised deeper excavations may be required to facilitate other structural elements (i.e. pile
                               caps and footings), where required.

                               Groundwater depths have not yet been assessed, and it is understood that a geotechnical and acid sulfate
                               soil investigation for the site is planned in the near future and could be used to update the DMP with site
                               specific details at a later date, if required. Groundwater seepage was recorded at 1.6 m below ground
                               level (approx. 0.5 m AHD) during preliminary geotechnical works (drilling) on a neighbouring site by
                               Douglas Partners (2021). Standing groundwater levels are therefore conservatively expected to occur at
                               an approximate elevation of around RL 1.0 m AHD.

                               These conditions and the sites’ proximity to the adjacent Noosa canal (tidally connected part of Noosa
                               River catchment) suggest that dewatering of the site will be necessary to allow the basement to be
                               constructed in dry conditions. Based off information provided by SCG and ADG’s experience in the local
                               area, it is noted that acid sulfate soil conditions are likely to be present, which has the potential to affect
                               water quality during construction dewatering.
                      1.2      Relevant guidelines
                               The DMP was prepared with reference to the following documents:
                                    Australian and New Zealand Guidelines for Fresh and Marine Water Quality. 2018. Australian and
                                     New Zealand Governments and Australian state and territory governments (ANZG), Canberra ACT,
                                     Australia.
                                    Australian and New Zealand Guidelines for Fresh and Marine Water Quality. 2000. Australian and
                                     New Zealand Environment and Conservation Council and Agriculture and Resource Management
                                     Council of Australia and New Zealand (ANZECC/ARMCANZ).
                                    Environmental Protection (Water & Wetland Biodiversity) Policy 2019. Department of Environment
                                     and Science (DES), Queensland Government.
                                    Noosa River environmental values and water quality objectives. 2022. Department of Environment
                                     and Science (DES), Queensland Government.
                                    Guidelines for Managing Risks in Recreational Water. 2018. Australian Government, National Health
                                     and Medical Research Council (NHMRC).
                                    Monitoring and Sampling Manual 2018, Version 2 June 2018. 2018. Department of Environment
                                     and Science (DES).
                                    Queensland Water Quality Guidelines 2009, Version 3. 2013. The Department of Environment and
                                     Heritage Protection (DEHP).
                      1.3      General environmental duty
                               The Environmental Protection Act 1994 describes that all persons in Queensland have a “General
                               Environmental Duty” and that “a person must not carry out an activity that causes, or is likely to cause
                               environmental harm unless the person takes all reasonable and practicable measures to prevent or
                               minimise the harm”.




                          ADG1580.23 Dewatering Management Plan_Rev0_28.09.23                                                           Page 1




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 36

                                                                                                                    ADG Consulting Pty Ltd


                              The Act requires that appropriate action be taken to report that environmental harm is occurring or has
                              the potential to occur, unless the harm is authorised under an environmental protection policy, an
                              environmental management program, a development approval, or an environmental protection order.
                              This is known as the “Duty to Notify”. Failure to fulfil this duty is an offence and may result in prosecution.
                      1.4     DMP objectives
                              The objectives of the DMP are to:
                                  Describe the dewatering methodology, groundwater treatment, monitoring and reporting
                                   procedures to be employed at the site during dewatering activities.
                                  Provide effective management procedures to prevent environmental harm resulting from the
                                   discharge of extracted groundwater from the site.
                      1.5     Scope of work
                              To achieve the investigation objectives, the following scope of work was undertaken:
                                  A desktop study including:
                                   1. Review of the development proposal and proposed shoring/dewatering designs (where
                                      available).
                                   2. Review of geology and soil maps for the area.
                                   3. Search of groundwater bores licensed by the Department of Regional Development,
                                      Manufacturing and Water (DRDMW) within a 200 m radius of the site.
                                   4. Review of relevant existing reports and groundwater data from the local area.
                                   5. Review of current aerial photographs of the site and surrounds.




                        ADG1580.23 Dewatering Management Plan_Rev0_28.09.23                                                            Page 2




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 37

                                                                                                                      ADG Consulting Pty Ltd


                      2        Site characteristics
                      2.1      Property description
                               The site is described as Lot 149 on N21859, and is situated at 30 Mossman Court, Noosa Heads,
                               Queensland. The site is understood to be currently occupied by a multistorey dwelling (Google
                               Streetview, 28 September 2023) which is planned to be demolished. The site is irregular in shape and has
                               an area of 610 m2. The site locality is shown in Figure 1, Appendix A.
                      2.2      Surrounding environment
                               The surrounding environment and land use is described briefly in Table 1.

                               Table 1 Surrounding land use and environment

                                        Direction                                              Environment

                                          North             Noosa River canal, then residential development

                                           East             Residential development.

                                          South             Mossman Court, then residential development, then Noosa River.

                                          West              Residential development, then Noosa River.


                      2.3      Topography
                               The site and surrounding land is considered to be generally level, with the site gently sloping towards the
                               Noosa River canal from the south to north. Surface elevations range from 2.20 m to between 1.7 m AHD.
                               Refer to Appendix C (Preliminary Concept Design ‐ Sections, 11/07/23).
                      2.4      Geology & soils
                               The surface geology at the site is mapped as being Anthropocene aged gravel, sand and silt; man‐made
                               deposits generally associated with land‐fill or mining (tailings, dumps and rehabilitated areas). The
                               dominant rock type is identified as volcanic and metamorphic as reference through the detailed surface
                               geology (accessed via Queensland Globe online, 28 September 2023).

                               The Acid Sulfate Soils (ASS) mapping layer 1:100,000 Redcliffe to Teewah categorises the site as ‘SDL’ or
                               ‘Acid Sulfate on Disturbed Land’, indicating that the site is likely to contain acid sulfate soils (and potential
                               exists that partial or full treatment may have been undertaken), however limited field investigation has
                               been performed in this area (accessed via Queensland Globe online, 28 September 2023).
                      2.5      Hydrogeology
                               A search of groundwater bores licensed by DRDMW was conducted by ADG on 28 September 2023. The
                               search identified no licensed bores within a 200 m radius of the site. A map showing the bore search area
                               is provided in Appendix B.

                               Based on the local geology and topography, and the site’s proximity to the Noosa River canal, the inferred
                               groundwater flow is to the north. Groundwater beneath the site is likely to be hydraulically connected to
                               the canal network and/or river, therefore saline groundwater conditions are anticipated, and additional
                               saltwater intrusion is likely to occur during dewatering.




                          ADG1580.23 Dewatering Management Plan_Rev0_28.09.23                                                             Page 3




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 38

                                                                                                                    ADG Consulting Pty Ltd


                      3        Previous investigations
                               This DMP is based on site specific information sourced from the following, provided to ADG by SCG:
                                    Preliminary Geotechnical Investigation, Proposed Residence, 38 Mossman Court, Noosa Heads.
                                     2021. Douglas Partners Pty Ltd. Ref: 206126.00.R.001.
                                    Preliminary Concept Design, Noosa Villa, Set dated 11 July 2023. Chris Clout Design.
                               A brief discussion of relevant soil and groundwater conditions is provided below.
                      3.1      Douglas Partners Pty Ltd 2021
                               A preliminary Geotechnical Investigation was undertaken at a nearby site situated at 38 Mossman Court
                               in July 2021 by Douglas Partners Pty Ltd (DP). This information has been used in preparing this report in
                               the interim until site‐specific geotechnical and acid sulfate soils information becomes available, and is
                               considered applicable given the short ~25 m horizontal distance between the two sites directly across
                               the cul‐de‐sac bulge.
                      3.1.1 Soils
                               A total of one (1) borehole (Bore 1) was drilled within the northern portion of the 38 Mossman Court site
                               (due to limited rig access) to 6.0 m below ground level (bgl). Two additional dynamic cone penetrometer
                               (DCP) tests were carried out within the southern portion of that site.

                               The subsurface profile encountered generally comprised medium dense silty sand fill overlying medium
                               dense to dense silty sand fill to approximately 0.9 m in depth. Natural medium dense silty sand was
                               encountered to 3.7 m depth overlying dense silty sand to 4.7 m depth. Very dense silty sands were
                               encountered to the termination depth of 6.0 m (Bore 1 only). DP reported that similar conditions were
                               reported within the DCP holes, with relatively loose conditions encountered to 1.5 m depth.

                               As part of the Preliminary Geotechnical Investigation (2021), Acid Sulfate Soil (ASS) samples were
                               collected at 0.25 m intervals in Bore 1 to 4.0 m depth. A total of sixteen (16) samples were collected for
                               ASS screening and four (4) samples were selected for further analysis by the Chromium Reducible Sulfur
                               suite (CRS). Titratable actual acidity (TAA) concentrations were reported to be between 9 moles H+/tonne
                               and 26 Moles H+/tonne, with one exceedance of the relevant QASSIT action criterion of 18 moles
                               H+/tonne in Bore 1 at 1.0 m depth. Therefore, actual acid sulfate soils (AASS) should be expected to be
                               present to at least 1.0 m depth bgl. Reported oxidisable sulfur concentrations reported as SCr ranged
                               from 0.06 %S to 0.18 %S, all above the relevant action criterion of 0.03% S. The results indicated the
                               presence of potential acid sulfate soils (PASS) to at least 3.25 m bgl.

                               ADG notes that the testing was limited to one borehole with ASS testing to 4.0 m depth. DP summarised
                               that within this depth profile both the existing sand fill and natural silty sands are considered to contain
                               ASS and that neutralisation, using ag lime or similar will be required at a rate of 9.5 kg/m3 for the upper
                               fill profile and at a rate of 12.5 kg/m3 for the natural silty sands on the site. In addition, to treatment of
                               the excavated soil, a guard layer of ag lime (rate 4 kg/m3) should be applied to the basement excavation.

                               It is expected that ASS impacted material will be excavated and removed from site for appropriate
                               treatment and disposal at a licenced facility due to available area constraints on site. Given that ASS
                               material has been identified within the locality sub‐soil profile, any leachate generated on the site must
                               be suitably treated/neutralised before leaving the site and must not be directly discharged to stormwater.
                      3.1.2 Groundwater
                               During drilling activities for a nearby Preliminary Geotechnical Investigation at 38 Mossman Court,
                               groundwater seepage/inflow was encountered at 1.60 m depth below the ground surface, which
                               corresponds to an elevation of approximately 0.5 m AHD (Douglas Partners, 2021).




                          ADG1580.23 Dewatering Management Plan_Rev0_28.09.23                                                          Page 4




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 39

                                                                                                                 ADG Consulting Pty Ltd


                      3.2     Groundwater quality
                              In the absence of any localised monitoring well data, and based on numerous groundwater investigations
                              and dewatering monitoring projects that have been undertaken by ADG throughout the Noosa Coast
                              Region and immediate locality in recent years, our understanding of the groundwater quality in the region
                              is provided below:
                                  Groundwater is generally mildly acidic to neutral, with pH levels ranging from approximately 5.5 to
                                   6.5 and electrical conductivity ranging from brackish to saline between 2,000 µS/cm to
                                   48,000 µS/cm. Groundwater pH has the potential to reduce (become more acidic) following
                                   oxidisation of PASS as dewatering progresses, particularly if re‐wetting of the soils occurs.
                                  Dissolved oxygen levels in static groundwater typically range from approximately 35 – 40 %
                                   saturation.
                                  The groundwater associated with indurated sand strata is moderately to highly turbid as a result of
                                   staining and organic content.
                                  Concentrations of dissolved metals are typically below the available marine water trigger values
                                   (MWTV’s) provided in ANZECC/ARMCANZ (2000) for the receiving waters, however elevated levels
                                   of aluminium and particularly iron are expected in the untreated groundwater and have the
                                   potential to increase following oxidisation of PASS as dewatering progresses or as a result of existing
                                   acidic groundwater conditions.
                                  Given the location and previous use of the site, groundwater impacts resulting from site
                                   contamination are not anticipated.
                              A groundwater investigation will be undertaken at the commencement of dewatering as described in
                              Section 6.5.2 of this report. This assessment will be representative of the groundwater being extracted
                              and treated from the entire site, as opposed to localised monitoring well data which is often misleading.
                              Based on previous experience with dewatering in the area, ADG expects the groundwater to require
                              treatment to increase pH and dissolved oxygen levels, as well as reduce turbidity, suspended sediments
                              and dissolved metal concentrations prior to being discharged to the Noosa River.




                        ADG1580.23 Dewatering Management Plan_Rev0_28.09.23                                                         Page 5




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 40

                                                                                                                  ADG Consulting Pty Ltd


                      4        Water quality objectives
                      4.1      Receiving environment
                               It is proposed to discharge extracted groundwater directly into the Noosa River canal adjacent to site.

                               Based on the stormwater mapping available via the Noosa Council Enterprise Mapping System
                               (Intramaps) there is a stormwater gully pit located south of 28 Mossman Court. This stormwater pit
                               terminates within the Noosa River (<40 m) directly north of the gully pit. The exact location of the
                               receiving waters/environment will be confirmed on commencement of dewatering; however, it is
                               considered most appropriate that the site will discharge directly north to the adjacent Noosa River canal.

                               The receiving environment in this location identifies as a moderately disturbed, middle estuary
                               environment. The following section establishes water quality objectives (WQOs) to ensure that the
                               environmental values of the receiving waters are protected and maintained.
                      4.2      Development of water quality objectives
                               WQOs have been developed to support and protect the designated environmental values (EVs) for the
                               receiving environment. The WQOs are based on a moderately disturbed level of protection for enclosed
                               coastal/lower estuaries. The WQOs have been developed with reference to the following guideline
                               documents:
                                    Australian and New Zealand Guidelines for Fresh and Marine Water Quality 2018. (ANZG 2018) The
                                     selected trigger values apply to moderately disturbed systems to provide a 95% level of species
                                     protection for marine waters.
                                    Environmental Protection (Water & Wetland Biodiversity) Policy 2019. Queensland Government.
                                    Noosa River environmental values and water quality objectives. 2022. DES.
                                    Queensland Water Quality Guidelines, Version 3, September 2009. 2013. DEHP.
                               The Australian and New Zealand Guidelines for Fresh and Marine Water Quality by the Australian and
                               New Zealand Environment and Conservation Council and Agriculture and Resource Management Council
                               of Australia and New Zealand (ANZECC/ARMCANZ, 2000), has undergone review, with the publication of
                               the 2018 version. The revised Australian and New Zealand Guidelines for Fresh and Marine Water Quality
                               2018 is a joint initiative between the Australian and New Zealand Governments and Australian state and
                               territory governments (ANZG, 2018) and supersedes the ANZECC/ARMCANZ 2000 publication. Where
                               ANZECC/ARMCANZ (2000) is referenced, the relevant sections are still relevant and consistent with the
                               updated ANZG 2018 publication, as referenced in the ANZG 2018 publication.

                               The Queensland Water Quality Guidelines 2009 (DEHP, 2013) was made pursuant to the provisions of the
                               Environmental Protection (Water) Policy 1999, now the Environmental Protection (Water & Wetland
                               Biodiversity) Policy 2019 (the EPP(Water)), which is a subordinate legislation under the Environmental
                               Protection Act 1994 and was developed as the State response to the ANZECC/ARMCANZ (2000)
                               Guidelines. The EPP(Water) provides a framework for:
                                    Identifying environmental values for Queensland waters, and deciding the water quality objectives
                                     to protect or enhance those environmental values.
                                    Including the identified environmental values and water quality objectives under Schedule 1 of the
                                     EPP (Water).
                               WQOs are long term goals for surface water quality management. They are indicators established for
                               receiving waters to support and protect the designated Environmental Values (EVs) for those waters. DES
                               (2022) describes that for slightly to moderately disturbed waters, the guideline values should be
                               compared with the median of values at a test site, whilst ANZG (2018) stresses that the aquatic ecosystem
                               guideline values are triggers to further action, are inherently conservative, and that the response to non‐
                               compliance should match the magnitude and impacts (if any) of the exceedance.




                          ADG1580.23 Dewatering Management Plan_Rev0_28.09.23                                                       Page 6




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 41

                                                                                                                                  ADG Consulting Pty Ltd


                              Regardless of the WQOs adopted in this DMP, the General Environmental Duty set out in the EP Act is
                              paramount, which requires that “a person must not carry out an activity that causes or is likely to cause
                              environmental harm unless the person takes all reasonable and practicable measures to prevent or
                              minimise the harm”.
                      4.3     Proposed water quality objectives
                              The proposed water quality objectives that have been developed for the discharge of extracted
                              groundwater from the site are provided in the Tables below. All water discharged from the site must
                              comply with the discharge criteria provided in Table 2. In addition, the receiving water quality within a
                              20 m radius of the discharge point entry to the receiving water shall comply with the receiving water
                              criteria provided in Table 3. Receiving waters data will be assessed against background monitoring data
                              if non‐compliant results are obtained at the receiving waters monitoring location.

                              Table 2 Discharge criteria

                                                      Parameter                                                         Criteria

                               Physico‐chemical
                               pH (pH units)                                                                           6.5 – 8.51
                               Dissolved oxygen (% saturation)                                                            ≥802
                               Suspended solids (mg/L)                                                                   ≤501,2
                               Turbidity (NTU)                                                                            ≤502
                               Litter                                                                                None visible
                               Total metals (µg/L)
                               Aluminium                                                                         No ANZG criteria / 2003

                               Iron                                                                              No ANZG criteria / 3003

                              Table notes:
                              1. QWQG 2009 (2013) Refer to Table 8.2.1. Summary of design objectives for management of stormwater quality and flow –
                                 construction phase of development in Queensland.
                              2. Typical discharge criteria recognised throughout Queensland & NSW.
                              3. Criteria subject to anticipated Development Application (DA) notice and conditions by Noosa Shire Council.

                              Table 3 Receiving waters criteria

                                                      Parameter                                                         Criteria

                               Physico‐chemical
                               pH (pH units)                                                                           7.8 – 8.31
                               Dissolved oxygen (% saturation)                                                         85 – 1051
                               Suspended solids (mg/L)                                                                    ≤141
                               Turbidity (NTU)                                                                             ≤81
                               Dissolved metals (µg/L)
                               Aluminium                                                                    No relevant ANZG criteria available

                               Arsenic                                                                                    2.32*
                               Cadmium                                                                                    5.52
                               Chromium                                                                                   4.42
                               Copper                                                                                     1.32
                               Iron                                                                         No relevant ANZG criteria available

                               Lead                                                                                       4.42
                               Nickel                                                                                      702
                               Zinc                                                                                         82
                               Mercury                                                                                    0.42



                        ADG1580.23 Dewatering Management Plan_Rev0_28.09.23                                                                        Page 7




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 42

                                                                                                                                    ADG Consulting Pty Ltd



                                                        Parameter                                                           Criteria

                               Totals metals (µg/L)
                               Aluminium                                                                             No ANZG criteria / 2003

                               Iron                                                                                  No ANZG criteria / 3003

                              Table notes:
                              1. DES(2022). Noosa River environmental values and water quality objectives (canal).
                              2. ANZG (2018). Supersedes ANZECC/ARMCANZ (2000) ‐ Marine water trigger values for 95% species protection.
                              3. Criteria subject to expected condition in Development Application (DA) notice by Noosa Shire Council.
                              * = Insufficient data to derive a reliable trigger value. Low reliability value adopted (refer ANZECC/ARMCANZ (2000) Section
                              8.3.7.

                              Although ADG has not been provided a copy of the DA notice and conditions for the proposed
                              development, based on previous dewatering projects in the Sunshine/Noosa Coast Region it is expected
                              that total iron and aluminium concentrations as listed in Table 3 (above) are likely to be conditioned by
                              Noosa Shire Council for compliance. It should be noted, that these concentrations are considered to be
                              onerous with respect to the risk‐based (worst‐case) bioavailable trigger value criteria contained in ANZG
                              2018 & ANZECC/ARMCANZ (2000) for marine water (moderately disturbed) 95% species protection, and
                              are likely to be difficult to achieve given the groundwater conditions encountered in the locality on
                              previous dewatering projects on the Sunshine/Noosa Coast.

                              Prior to discharge to the stormwater system or any waterway, discharges are to be tested to meet the
                              requirements of the ANZG 2018 & ANZECC/ARMCANZ (2000) Guidelines for Fresh and Marine Water
                              Quality. There is currently no chemical toxicant trigger value criteria available for total or dissolved (i.e.
                              bioavailable) concentrations of aluminium or iron for marine or estuarine waters under the Australian
                              and New Zealand Guidelines for Fresh and Marine Water Quality Guidelines (ANZG 2018 &
                              ANZECC/ARMCANZ 2000 – i.e. ANZECC Guidelines) or the Guidelines for Managing Risks in Recreational
                              Waters (NHMRC 2008), with regards to managing environmental impacts to the waterway.

                              In addition, Section 5 (Guidelines for recreational water quality and aesthetics) of the ANZECC/ARMCANZ
                              (2000) Guidelines (per section 5.2 thereof) was superseded by the Guidelines for Managing Risks in
                              Recreational Water in 2008 (NHMRC, 2008). Therefore, a reference to the ANZECC/ARMCANZ (2000)
                              Guidelines is by association and extension a reference to the current 2008 NHMRC Guidelines. The 2008
                              NHMRC Guidelines contain no criteria for aluminium, and only includes an aesthetic criterion for iron –
                              noting this is an aesthetic criterion derived from the Australian Drinking Water Guidelines on the basis of
                              ingesting 2L of the recreational water solution per day. ANZECC/ARMCANZ (2000) Section 5.2.3.3, notes
                              that as a general guideline, under Toxic Chemicals, ‘Higher concentrations of toxicants may be tolerated
                              occasionally if it assumed that no person will ingest more than a maximum of 100 mL water during a
                              normal swimming session (NHMRC 1990) compared with 2L/d for potable water’, and Section 3.1.1.3,
                              under Risk based approach of the guidelines, ‘The guideline trigger values are based on bioavailable
                              concentrations, and hence are relatively conservative when compared with total concentrations in the
                              field, so the use of the decision frameworks will increase guideline concentrations in most cases’.
                              Therefore, any chemical toxicant trigger values would require reassessment and likely increase upwards
                              of any ANZG 2018 &/or ANZECC/ARMCANZ (2000) Guideline trigger values due to the slightly to
                              moderately disturbed nature (and thereby reduced sensitivity) of the receiving waters.

                              In conditioning more onerous criteria, rather than the available marine chemical toxicant trigger value
                              criteria contained within the ANZG/ANZECC Guidelines, an unachievable constraint may be placed on the
                              development. This DMP has allowed for contingency measures to be incorporated into the treatment
                              and discharge system if required, including silt curtains to be installed within the receiving waterway
                              surrounding the discharge location, or further onsite treatment measures such as filtration, to prevent
                              and/or minimise as far as reasonably practicable the potential for release of suspended solid loads into
                              the broader receiving waterway.




                        ADG1580.23 Dewatering Management Plan_Rev0_28.09.23                                                                                  Page 8




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 43

                                                                                                                     ADG Consulting Pty Ltd


                      5        Dewatering methodology
                      5.1      Basement excavation and shoring
                               It is understood that the excavation/basement perimeter will be stabilised along the perimeter of the
                               basement excavation using a contiguous secant pile wall. Excavations to facilitate the construction of the
                               basement level will extend to a maximum of approximately 2.4 m below ground level, which corresponds
                               to a maximum elevation of ‐0.7 m AHD (assuming 400 mm basement slab thickness). Localised deeper
                               excavations may be required for construction of other structural elements (i.e. footings & pile caps). Refer
                               to Preliminary Concept Plans, Appendix C.

                               It is expected that the development will include a ‘tanked’ basement to prevent the requirement for a
                               permanent dewatering facility at the site.
                      5.2      Groundwater extraction
                               Dewatering will be undertaken using a series of 40 mm diameter PVC spears installed to below maximum
                               excavation depth at 1.5 m intervals around the internal perimeter of the basement excavation.

                               The basement excavation must be dewatered to a minimum of 1.0 m below the deepest point of
                               excavation to allow construction to be undertaken in dry conditions. The water table is therefore
                               expected to be lowered by minimum of approximately 2.7 m to around ‐1.7 m AHD.
                      5.3      Extraction/discharge rates and volume
                      5.3.1 Dewatering extraction calculation based on subsurface soil profile
                               The dewatering extraction rate, area of influence and cone of depression has been estimated using the
                               Western Australian Department of Water and Environmental Regulation Cone of Depression Calculator.

                               The calculation results are based on the following parameters (as provided by ADS) and known site‐
                               specific conditions. The following is applicable to the basement excavations spanning across the lot:

                                      Approximate length of excavation = 18 m
                                      Approximate width of excavation = 16 m
                                      Reduction in depth of groundwater across the basement footprint/excavation = 2.7 m
                                      Approximate depth of saturated aquifer = 10 m (standardised conservative value applied)

                               The soil profile comprised predominantly of fine to medium sands, has a hydraulic conductivity of
                               8.2 m/day, or equivalent 0.0000949 L/sec (WA Calculator). The results of this calculation are shown in
                               Table 4 below, and a copy of the output is provided in Appendix D.

                               Table 4 Dewatering extraction rate results

                                                         Output                                               Result

                                Effective pumping radius of spears (m)                                          10
                                Dewatering radius of influence (m)                                              79
                                Discharge rate (L/sec)                                                          7
                                Discharge rate (L/hr)                                                         25,200
                                Establishment of cone of depression (hours)                                    111


                               Based on the above inputs, a groundwater flow rate of approximately 7 L/sec or 420 L/min or 25,200 L/hr
                               has been predicted for the development.

                               However, it should be noted that the WA Calculator provides a conservative assessment of inflows to an




                          ADG1580.23 Dewatering Management Plan_Rev0_28.09.23                                                        Page 9




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 44

                                                                                                                 ADG Consulting Pty Ltd


                              excavation footprint based on area and depth, but does not take account of the method of perimeter
                              piling i.e. sheet pile/concrete secant wall, which will inhibit lateral inflows. Also note that the cone of
                              depression radius measure includes water table depressions of 1 mm depth or more, so any significant
                              depression of the water table is limited to much closer to the spear point dewatering spears (generally
                              within 3 to 10 m from the pile shoring wall in fine‐medium grained sands, depending on density of the
                              strata).
                      5.4     Dewatering duration
                              Dewatering will be necessary throughout the basement construction phase, which is expected to require
                              dewatering for approximately 8 to 12 weeks. To minimise the potential impacts during construction of
                              short‐term dewatering, periods of active dewatering will be minimised as much as possible. However,
                              ADG notes that once active dewatering has commenced, dewatering will not be able to be ceased until
                              both: a) the basement hydrostatic uplift forces have been compensated to the satisfaction of the
                              consulting RPEQ engineer; and b) potential hydraulic loading on the external face of the piled shoring
                              system has been compensated to the satisfaction of the consulting RPEQ engineer and shoring
                              contractor.
                      5.5     Groundwater drawdown
                              Groundwater drawdown caused by dewatering has the potential to create settlement in unconsolidated
                              sediments and loose sands. It is noted that dilapidation reports for surrounding structures and services
                              are proposed to be undertaken, which were not available or supplied to ADG for the purposes of
                              preparing this DMP, and are to be provided to Council separately from this DMP.

                              Groundwater drawdown may also oxidise potential acid sulfate soils within the cone of depression,
                              subsequently producing acidic groundwater conditions and mobilising heavy metals. Monitoring of the
                              extracted untreated groundwater will be undertaken to detect potential in‐situ oxidation, as required
                              and at the frequencies stated in Section 6.5.2. Groundwater monitoring bores for groundwater level
                              gauging external to the excavation footprint are unable to be established and monitored prior to and
                              during construction on the site, due to limited space (SCG Consulting Engineers).

                              A plan showing the proposed basement extent is provided at Appendix C.
                      5.6     Groundwater treatment
                              All extracted groundwater will be treated on‐site using available technologies prior to discharge to the
                              stormwater network. The following treatment measures will be adopted, and will be installed and
                              operational prior to the commencement of dewatering:

                              1.   A groundwater pH buffering treatment system (primary treatment)
                              2.   A sedimentation tank to provide additional residence time and sedimentation (secondary
                                   treatment).
                              3.   Installation of fine media filtration to retain suspended sediments and/or heavy metals (tertiary
                                   treatment), if required.

                              Details of the treatment systems and methodologies are provided in Section 6 of this report.

                              Note: Consideration should be taken, regarding placement of treatment gear on site to enable easy
                              cleaning and maintenance throughout the dewatering phase for the project. Consider the potential
                              requirement for regular de‐sludging of sedimentation tank/s to suitable area onsite, if available (cost
                              minimisation).
                      5.7     Nominated Hold Points
                              In accordance with anticipated DA Conditions, nominated hold points to be enacted during construction
                              have been proposed to facilitate for certification by the suitably qualified person experienced with Acid
                              Sulfate Soils, as well as Council Development Engineer to ensure all possible avenues for continual
                              dewatering below permanent groundwater level, including around pipework bedding that outlet to



                        ADG1580.23 Dewatering Management Plan_Rev0_28.09.23                                                       Page 10




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 45

                                                                                                              ADG Consulting Pty Ltd


                              waterways, are appropriately sealed. The nominated hold points regarding dewatering for this project
                              are:
                              1. Prior to commencement of dewatering/initial pump out
                              2. At finished excavation level, prior to blinding layer application
                              3. External to basement service installation trench opening/s prior to backfilling.

                              The above nominated hold points are subject to confirmation by the consulting engineer, and liaison with
                              council representatives and the Site Manager.




                        ADG1580.23 Dewatering Management Plan_Rev0_28.09.23                                                    Page 11




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 46

                                                                                                                   ADG Consulting Pty Ltd


                      6        Water quality management
                      6.1      Responsibility
                               The Site Manager is ultimately responsible for implementing the water quality management procedures
                               described in this DMP.
                      6.2      Operational policy
                               To prevent impacts on the receiving waters by effectively treating all extracted groundwater prior to
                               discharge from the site.
                      6.3      Performance criteria
                               The performance criteria for the discharge of extracted groundwater are the water quality objectives
                               provided in Table 2 and Table 3 in Section 4 of this report. Both the discharge and receiving waters (within
                               a 20 m radius of the stormwater discharge point) will be assessed against the WQOs to ensure that the
                               environmental values of the waterway are maintained. Receiving waters data will also be assessed
                               against background monitoring data if non‐compliant results are obtained at the receiving waters
                               monitoring location.
                      6.4      Implementation strategy
                               All extracted groundwater will be treated on‐site using available technologies prior to discharge to the
                               stormwater network. The treatment system described in Section 6.4.1 will be adopted, installed and
                               operational prior to the commencement of dewatering.
                      6.4.1 Groundwater treatment systems
                               Subject to final appointment of shoring and dewatering contractors (who all generally have different
                               treatment systems), the following treatment systems are generally proposed for dewatered groundwater
                               treatment prior to discharge. Regardless of the contractor employed, groundwater treatment systems
                               should be installed with capability for treating flow rates of up to 8 to 10 L/sec, as a contingency against
                               higher than anticipated flow rates exceeding the estimated 7 L/sec as a result of varying ground conditions
                               across the extent of excavation.

                               Primary treatment
                               A groundwater treatment system will be installed to provide primary treatment of the extracted
                               groundwater. The system will provide the following capabilities:

                               1.    A baffled treatment tank with 5 kL minimum capacity
                               2.    Automated in‐line chemical dosing systems for the addition of buffering solutions and coagulants
                               3.    A filtration system to reduce fine particulates (if required)
                               4.    Emergency response alarms for non‐routine situations.

                               Based on the estimated extraction rate, a 5 kL system will provide approximately eleven minutes contact
                               time during the initial chemical dosing, prior to secondary treatment using a sedimentation tank. Primary
                               treatment tank will be vertically stacked on the secondary treatment tank wherever practicable to
                               minimise site area required for groundwater treatment equipment.
                               Secondary treatment
                               A sufficiently sized sedimentation tank will be utilised to provide the necessary residence time for
                               secondary treatment of the groundwater prior to discharge to the stormwater system. Based on the
                               estimated groundwater extraction rate of approximately 25,200 L/hr (equivalent 420 L/min) from section
                               1.1 of this report, a 23 kL sedimentation tank will provide approximately fifty‐four minutes retention time
                               following primary treatment of the extracted groundwater.
                               Tertiary treatment – may be required following initial testing of extracted groundwater.
                               A filtration treatment system with specialised fine filtration media and chlorine dosing will be utilised to
                               provide the required heavy metal removal (specifically for total and dissolved iron) where not


                          ADG1580.23 Dewatering Management Plan_Rev0_28.09.23                                                       Page 12




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 47

                                                                                                                    ADG Consulting Pty Ltd


                              precipitated and retained within the sedimentation tank/s (secondary treatment). This treatment system
                              will provide tertiary treatment of the groundwater prior to offsite discharge. This type of fine media
                              filtration treatment system is a forced‐flow system under pressure, and generally capable of treating flow
                              rates of up to 20 L/sec per filtration unit (therefore residence time is inconsequential to treatment quality
                              achieved).

                              Tertiary treatment will only be required if the required water quality is unable to be achieved following
                              primary and secondary stages of treatment. Subject to the results of field and laboratory testing during
                              the pre‐discharge monitoring event.


                      6.4.2 Dewatering strategy
                              The Site Manager, Dewatering Contractor and ADG Consulting must formulate a dewatering strategy to
                              ensure that the dewatering treatment system is sufficient to meet the requirements of the project and
                              that the necessary equipment can be accommodated within the site prior to the commencement of
                              dewatering.

                              Where construction of the proposed development requires occupation of the road reserve (verge area
                              and/or road formation) for either short term or long term, a road reserve permit must be obtained from
                              Council prior to any occupation of the road reserve.
                      6.4.3 Initial pump‐out
                              Prior to discharge of any extracted groundwater to the canal system, the following pre‐dewatering
                              procedure will be undertaken:

                              1. The basement area will be excavated down to the standing groundwater level.
                              2. The initial dewatering discharge will be directed (via the treatment systems) into the excavation and
                                 allowed to infiltrate/recharge the aquifer. This process will provide initial clarification of the extracted
                                 groundwater as disturbed sediment loads are typically reduced following the initial pump‐out.
                              3. Samples of the treated groundwater will be recovered and analysed for the parameters detailed in
                                 Table 2 and Table 3.
                              4. The extracted groundwater will be directed into the stormwater system following confirmation that
                                 the water quality complies with the discharge criteria.
                      6.5     Monitoring
                      6.5.1 Visual monitoring
                              Visual inspections of the site and dewatering equipment shall be undertaken daily by the Site Manager
                              to identify the following:
                                  Quantity of chemical product within the dosing system
                                  Effective operation of all dewatering treatment equipment
                                  Short circuiting of water around baffles and filter media in sediment tanks, where required to be
                                   installed.
                                  Visible hydrocarbon sheens and odours
                                  Green blue or extremely clear water indicating high levels of dissolved aluminium.
                      6.5.2 Water quality monitoring
                              Water quality monitoring will be undertaken for the duration of dewatering activities at the site by a
                              suitably qualified and independent person. The monitoring will include analysis of the extracted
                              groundwater, treated discharge water and off‐site monitoring in the receiving waters (in the mixing zone
                              within a 20 m radius of the discharge point). The exact location within the receiving waterway (Noosa
                              River canal) is to be confirmed, however it is anticipated to be directly north/adjacent of the site.
                              Background water quality monitoring of field parameters will also be conducted during each sampling



                        ADG1580.23 Dewatering Management Plan_Rev0_28.09.23                                                           Page 13




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 48

                                                                                                               ADG Consulting Pty Ltd


                              event, if applicable. Background samples will be recovered from the river, either upstream or
                              downstream from the receiving water location (tide dependant).

                              The proposed monitoring locations are shown in Figure 1, Appendix A are a subject to confirmation
                              following mobilisation of dewatering gear to site.

                              Monitoring will be undertaken at the following frequencies:


                                  Daily monitoring of field parameters (pH, electrical conductivity, dissolved oxygen, temperature and
                                   turbidity) in the treated discharge water and pH of the untreated extracted groundwater (to
                                   determine potential acidification). Daily monitoring will be undertaken by a suitably trained site
                                   employee under the supervision of the Site Manager.
                                  Weekly monitoring of field parameters (pH, electrical conductivity, dissolved oxygen, temperature
                                   and turbidity) in the untreated extracted groundwater, treated discharge water, receiving waters
                                   and background waters by ADG Consulting.
                                  Weekly laboratory analysis of treated discharge water and receiving waters for suspended solids
                                   and dissolved 0.45µm filterable metals (aluminium, arsenic, cadmium, chromium, copper, iron, lead,
                                   nickel, zinc and mercury). Total aluminium and iron will also be analysed for, if required.
                                  Pre‐discharge/initial monitoring of field parameters (pH, electrical conductivity, dissolved oxygen
                                   and oxidation‐reduction potential) in the extracted groundwater (prior to treatment) to assess
                                   changes in groundwater chemistry associated with PASS oxidation.
                                  Pre‐discharge/initial laboratory analysis of extracted groundwater (prior to treatment) for
                                   suspended solids, dissolved 0.45µm filterable metals (aluminium, arsenic, cadmium, chromium,
                                   copper, iron, lead, nickel, zinc and mercury) and for soluble sulfate and chloride to assess changes
                                   in groundwater chemistry associated with PASS oxidation. Total aluminium and iron will also be
                                   analysed for, if required.
                                  Laboratory analysis of untreated groundwater would also be performed periodically (monthly) if
                                   changes in untreated groundwater pH levels are detected that may indicate local acidification, and
                                   to determine any changes in local groundwaters that may require further investigation of potential
                                   environmental impacts.
                              All samples will be recovered by a suitably qualified Environmental Scientist and submitted to a National
                              Association of Testing Authorities (NATA) accredited laboratory for analysis.
                      6.5.3 Monitoring responsibilities
                              The persons responsible for undertaking the compliance monitoring described in Section 6.5.2 above are
                              shown in Table 5.

                              Table 5 Monitoring responsibilities

                                                   Activity                        Frequency        Responsibility         Person

                               Monitoring of field parameters in discharge water
                                                                                     Daily           Site Manager       Site Manager
                               and untreated extracted groundwater

                               Monitoring of field parameters in untreated
                                                                                                                       Environmental
                               extracted groundwater, discharge water,              Weekly          ADG Consulting
                                                                                                                         Consultant
                               receiving waters and background waters

                               Laboratory analysis of samples recovered from                                           Environmental
                                                                                    Weekly          ADG Consulting
                               discharge water and receiving waters                                                      Consultant

                               Monitoring of field parameters in extracted                                             Environmental
                                                                                    Weekly          ADG Consulting
                               groundwater (pre‐treated)                                                                 Consultant



                        ADG1580.23 Dewatering Management Plan_Rev0_28.09.23                                                     Page 14




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 49

                                                                                                               ADG Consulting Pty Ltd



                               Laboratory analysis of samples recovered from   Initially, then as                      Environmental
                                                                                                    ADG Consulting
                               extracted groundwater (pre‐treated)                 required                              Consultant

                      6.6     Maintenance
                              The groundwater treatment systems must be regularly maintained. Maintenance must include:
                                  Regular cleaning and or replacement of the filters within the filtration unit, where required to be
                                   installed.
                                  Regular removal of sediment from the sedimentation tank. The sediment must be either returned
                                   to the excavation pit for dewatering and bulking out with excavated material, or removed from the
                                   site by a licensed liquid waste contractor.
                                  Regular check of the dosing system and top‐up of buffering solutions and flocculants.
                      6.7     Reporting
                              Dewatering management procedures and monitoring results will be reviewed by ADG Consulting weekly
                              to ensure that the treatment procedures are effective, and that the receiving waters are not being
                              impacted by the extracted groundwater being discharged.

                              The following reporting procedures will be adopted:
                                  A summary report will be prepared upon completion of the initial pre‐discharge monitoring. The
                                   report will be submitted to the Site Manager, Dewatering Contractor, and NSC upon request.
                                  Weekly interim reports will be prepared upon receipt of laboratory data for each round of ongoing
                                   compliance monitoring. The interim reports will display all data obtained during the previous
                                   monitoring event, and provide comments and recommendations based on the results.
                                  A dewatering compliance report will be prepared on completion of the project (upon request).
                              The above reports will be prepared by ADG Consulting and provided to the Site Manager and Dewatering
                              Contractor as they become available. The reports will include all water quality results and comparison to
                              the WQOs, corrective actions and recommendations made to the Site Manager and Dewatering
                              Contractor during the monitoring period.

                              The Site Manager must keep records of complaints, volumes of chemicals used and treatment methods
                              employed. These records must be available on‐site at all times and submitted to NSC by the Site Manager
                              upon request.
                      6.8     Contingencies
                              If water quality monitoring indicates ongoing exceedances of the performance criteria, and the water
                              quality objectives for the receiving waters cannot be met, then corrective actions will be adopted as
                              necessary. Possible contingencies may include one or more of the following:
                                  Installation of additional sedimentation tanks to provide increased residence time and assist with
                                   the retention of precipitated iron hydroxides, other heavy metals and/or suspended sediments.
                                  Installation of additional flocculant and/or coagulant dosing systems to assist in precipitation of
                                   suspended sediments and/or heavy metals.
                                  Installation of activated carbon filtration or other fine media filtration to retain suspended
                                   sediments and/or heavy metals.
                                  Install a floating sediment curtain/s around the stormwater termination point in the receiving
                                   waterway to prevent unsightly plumes and contain sediment and/or heavy metals for periodic
                                   removal (subject to approval by Noose Shire Council).
                                  Preventive and corrective actions shall be taken in the event that groundwater monitoring
                                   observations indicate that unexpected groundwater contamination has been encountered during



                        ADG1580.23 Dewatering Management Plan_Rev0_28.09.23                                                     Page 15




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 50

                                                                                                                 ADG Consulting Pty Ltd


                                   dewatering. The most appropriate action(s) shall be dependent on the stage of construction and
                                   risk of adverse impacts to groundwater users and the receiving environment.
                                  Any modification to the dewatering system and pumping rates shall be in consultation with a
                                   suitably qualified scientist/geotechnical/engineer.
                                  Following heavy rainfall all ponded surfaces waters are to meet discharge criteria (Table 3) prior to
                                   offsite discharge. Where discharge criteria not met, Site Manager to obtain approval from
                                   Dewatering Contractor regarding treating surface waters with treatment gear before offsite
                                   discharge.
                                  Pumping systems and shoring works to be maintained in fit for purpose state by Dewatering
                                   Contractor and/or shoring contractor. In the event that dewatering equipment has failed and is
                                   likely to cause a significant impact on the environment, or surrounding properties (i.e. flooding) the
                                   Dewatering Contractor is to be contacted immediately. The Principal Contractor, in consultation
                                   with the Dewatering Contractor shall be responsible in rectifying the failure in a practicable time
                                   frame to minimise potential impacts. Equipment, spare parts, materials and tools necessary to
                                   manage aspects of the system/s which present a high risk of significant impacts in the event of
                                   failure (if any) shall be readily available.
                                  Construction vibrations could potentially cause settlement in the loose upper level sands, thereby
                                   damaging nearby structures founded in these strata. Prior to commencement of construction on
                                   site (including staged works), it is recommended that a detailed dilapidation survey be undertaken
                                   to establish the condition of all existing adjacent structures, roads and services.




                        ADG1580.23 Dewatering Management Plan_Rev0_28.09.23                                                       Page 16




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 51

                                                                                                                   ADG Consulting Pty Ltd


                      7        Noise & odour management
                      7.1      Responsibility
                               The Project Manager is responsible for ensuring the appropriate management of noise and odour during
                               dewatering operations.
                      7.2      Operational policy
                               To minimise noise and odour emissions generated from the site during dewatering.
                      7.3      Performance criteria
                               The appropriate criteria to measure the performance of dewatering management at the site are provided
                               below.
                               1.    No noise or odour related complaints received from neighbouring residents or the community.
                               2.    No degradation of air quality due to fumes or odours emanating from the dewatering process.
                      7.4      Implementation strategy
                               Noise and odour emissions will be managed as described in the following sections.
                      7.4.1 Noise
                               All dewatering equipment must be operated appropriately and maintained in good working order. All
                               dewatering systems and plant must be fitted with the appropriate noise reduction equipment to comply
                               with the performance criteria. Non‐complying dewatering plant will be replaced or repaired as necessary.

                               It is proposed to employ noise mitigation strategies including use of electric pumps and dewatering
                               systems rather than diesel powered equipment. Noise attenuation blankets and screens will be installed
                               around noise generating dewatering pumps and equipment where practicable. Noise monitoring
                               equipment (unattended) will be installed by the site manager prior to commencement and monitored for
                               the duration of dewatering.
                      7.4.2 Odour
                               All dewatering plant must be fitted with the appropriate emission reduction devices. Where practicable,
                               all dewatering plant will be sealed to prevent the release of odours to the atmosphere. Fine mist odour
                               control sprays will be applied to reduce offensive odours if complaints are received from neighbouring
                               residents.
                      7.5      Monitoring
                               An inspection of the site and dewatering equipment shall be undertaken daily by the Site Manager to
                               identify the following:
                                    Excessive noise being generated by the dewatering systems and plant; and
                                    Strong or offensive odours being generated by the dewatering equipment and/or extracted
                                     groundwater.
                               Noise monitoring equipment (unattended, continuous logging) is proposed to be installed by the Site
                               Manager prior to commencement and monitored for the duration of dewatering. The Environmental
                               Protection (Noise) Policy 2019 (EPP(Noise)) identifies specific acoustic quality objectives (noise criteria)
                               to assist in preventing significant impacts on noise sensitive receptors and as a guide to long‐term
                               acoustic quality for sensitive receptors. The primary EPP(Noise) criteria relevant to this investigation is
                               outside a dwelling (i.e. adjacent dwellings), which should not have noise at levels in the daytime or
                               evenings greater than 50dB(A) LAeq,adj,1hr. This means that noise levels in the receiving environment
                               outside of nearby dwellings (i.e. on balconies) should not exceed an equivalent sound energy as would
                               be received from a one hour continuous sound of 50 decibels on the A‐weighted scale (adjusted for tonal
                               character perceptible by the human ear).




                          ADG1580.23 Dewatering Management Plan_Rev0_28.09.23                                                       Page 17




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 52

                                                                                                                ADG Consulting Pty Ltd


                              While this report has not been generated for the purpose of assessing compliance with the requirements
                              of workplace health and safety legislation, it is noted that a person conducting a business or undertaking
                              must ensure that workers are not exposed to noise that exceeds the exposure standard for noise. The
                              exposure standard for noise is defined in the Work Health & Safety Regulation 2011 (QLD) as LAeq,8h of
                              85 dB(A) or an LC,peak of 140 dB(C). As such, it is considered appropriate to adopt these exposure
                              standards to assess average and peak noise generated at the site with the potential to affect exposure
                              levels of nearby sensitive receptors (noting there will be some attenuation between source and receptors
                              and actual noise experienced by receptors would need to be measured at the receptor location).
                      7.6     Reporting
                              The Site Manager must keep records of complaints, monitoring records (including continuous noise
                              monitoring data), and corrective and preventive actions/methods employed for noise abatement. These
                              records must be available on‐site at all times and submitted to NSC by the Site Manager upon request.
                      7.7     Contingencies
                              If noise levels consistently exceed the performance criteria, temporary acoustic barriers will be
                              constructed around the offending dewatering systems and plant. Odour control sprays will be applied as
                              necessary to mask odour emissions if complaints are received from neighbouring residents. This may
                              include the direct injection of deodorisers to the groundwater treatment system.




                        ADG1580.23 Dewatering Management Plan_Rev0_28.09.23                                                      Page 18




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 53

                                                                                                                    ADG Consulting Pty Ltd


                      8        Limitations
                               ADG Consulting Pty Ltd has prepared this report for David & Craig Dodd care of SCG Consulting Engineers
                               in accordance with the agreed scope of work. The services performed by ADG have been conducted in a
                               manner consistent with the normal level of care and expertise exercised by members of the
                               environmental consulting profession. No other warranty or guarantee, expressed or implied, is made as
                               to the professional advice included in this report.

                               This report is solely for the use of David & Craig Dodd and SCG Consulting Engineers and ADG accepts no
                               responsibility for the use of any part of this report for any other purpose or by third parties, as it may not
                               contain sufficient information for the purposes of other parties or users. This report must only be
                               presented in full, and may not be used for any other objective, except where prior written approval is
                               obtained from ADG. This report does not comment on legal obligations, as legal advice can only be given
                               by qualified legal practitioners.

                               The information contained in this report is provided to minimise potential impacts on the receiving
                               environment, however implementation of the described management procedures does not guarantee
                               that the objectives will be achieved.

                               The information contained in this report is considered to be accurate at the date of issue. Subsurface
                               conditions, including contaminant concentrations can change in space and time, either through natural
                               processes or by the accidental or intentional addition of contaminants to a site. Where conditions
                               encountered subsequently at the site are significantly different from those reported herein, ADG must
                               be notified and be provided the opportunity to review the conclusions and recommendations of this
                               report.




                          ADG1580.23 Dewatering Management Plan_Rev0_28.09.23                                                         Page 19




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 54

                                                                                                             ADG Consulting Pty Ltd


                      9        References
                               ANZG 2018. Australian and New Zealand Guidelines for Fresh and Marine Water Quality. Australian and
                               New Zealand Governments and Australian state and territory governments, Canberra ACT, Australia.

                               ANZECC/ARMCANZ. 2000. Australian and New Zealand Guidelines for Fresh and Marine Water Quality.
                               Australian and New Zealand Environment and Conservation Council and Agriculture and Resource
                               Management Council of Australia and New Zealand.

                               DES. 2019. Environmental Protection (Water & Wetland Biodiversity) Policy 2019. Queensland
                               Government. Brisbane, Queensland, Australia.

                               DEHP. 2013. Queensland Water Quality Guidelines 2009, Version 3. Department of Environment and
                               Heritage Protection. Brisbane, Queensland, Australia.

                               DES. 2018. Monitoring and Sampling Manual 2018, Version 2 June 2018. Department of Environment and
                               Science. Brisbane, Queensland, Australia.

                               DES. 2022. Noosa River environmental values and water quality objectives. Department of Environment
                               and Science (DES), Queensland Government.

                               Douglas Partners. 2021. Preliminary Geotechnical Investigation, Proposed Residence, 38 Mossman Court,
                               Noosa Heads. Ref: 206126.00.R.001.

                               Government of Western Australia. 2023. Cone of Depression Cal;culator. Department of Water and
                               Environmental Regulation. Accessed 28 September 2023,
                               https://www.wa.gov.au/service/environment/cone‐of‐depression‐calculator.

                               NHMRC. 2018. Guidelines for Managing Risks in Recreational Water. Australian Government, National
                               Health and Medical Research Council.

                               Noosa Shire Council. Noosa Council Interactive Mapping, Stormwater Infrastructure. Accessed 28
                               September 2023
                               https://enterprise.mapimage.net/IntraMaps910/?project=Public&module=Property%20Recreation%20
                               Utilities&configId=64251f07‐9411‐4a61‐930e‐2bd9b45d8fff&startToken=8fb07456‐4db7‐45a7‐89df‐
                               64e9b5a76aff&touch=false




                          ADG1580.23 Dewatering Management Plan_Rev0_28.09.23                                                Page 20




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 55

                                                                                              ADG Consulting Pty Ltd




                      Appendix A:           Figures
                                            Figure 1 Site and proposed monitoring locations




                        ADG1580.23 Dewatering Management Plan_Rev0_28.09.23




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 56

Figure 1 - Site and proposed monitoring locations (to be confirmed)                                                              A product of

Lot 149 on N21859, 30 Mossman Court, Noosa Heads, QLD
26°23'23"S 153°4'49"E                                                 26°23'23"S 153°5'8"E




                                                                                                  Legend located on next page




                                                                                                                           0                        50 metres
                                                                                                                                   Scale: 1:1806

                                                                                                                                   Printed at: A3
                                                                                                                               Print date: 28/9/2023
                                                                                                                     Not suitable for accurate measurement.
                                                                                                                  Projection: Web Mercator EPSG 102100 (3857)
                                                                                              For more information, visit https://qldglobe.information.qld.gov.au/help-info/Contact-
                                                                                                                                       us.html
                                                                                             Includes material © State of Queensland 2023. You are responsible for ensuring that
                                                                                             the map is suitable for your purposes. The State of Queensland makes no
                                                                                             representation or warranties in relation to the map contents and disclaims all liability.
                                                                                             If imagery is displayed, imagery includes material © CNES reproduced under license
                                                                                             from Airbus DS, all rights reserved © 21AT © Earth-i, all rights reserved, © Planet Labs
                                                                                             PBC, 2023




26°23'37"S 153°4'49"E                                                 26°23'37"S 153°5'8"E                                 Department of Resources

Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 57

Figure 1 - Site and proposed monitoring locations (to be confirmed)
Lot 149 on N21859, 30 Mossman Court, Noosa Heads, QLD
      Legend                                                              Attribution



                                                                      Includes material © State of Queensland (Department of Resources); ©
        Places: Land parcel                                           Commonwealth of Australia (Geoscience Australia); © 21AT, © Earth-i, all rights
                                                                      reserved, 2023.
             Site - Lot 149 on N21859
                                                                      © State of Queensland (Department of Resources) 2021
        Places: My Places
                                                                      © State of Queensland (Department of Resources) 2023
             Site Discharge
             Receiving Waters
             Background Waters

        Cities and Towns



        Road Crossing

             Bridge
             Tunnel

        Road

             Highway
             Main
             Local
             Private

        Railway




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 58

                                                                              ADG Consulting Pty Ltd




                      Appendix B:           DRDMW licenced bore search




                        ADG1580.23 Dewatering Management Plan_Rev0_28.09.23




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 59

DRDMW Licensed Bore Search                                                                         A product of

200 m radius
26°23'22"S 153°4'45"E                  26°23'22"S 153°5'9"E




                                                                   Legend located on next page




                                                                                               0                    50 metres
                                                                                                    Scale: 1:2256

                                                                                                    Printed at: A3
                                                                                                Print date: 28/9/2023
                                                                                      Not suitable for accurate measurement.
                                                                                   Projection: Web Mercator EPSG 102100 (3857)
                                                               For more information, visit https://qldglobe.information.qld.gov.au/help-info/Contact-
                                                                                                        us.html
                                                              Includes material © State of Queensland 2023. You are responsible for ensuring that
                                                              the map is suitable for your purposes. The State of Queensland makes no
                                                              representation or warranties in relation to the map contents and disclaims all liability.
                                                              If imagery is displayed, imagery includes material © CNES reproduced under license
                                                              from Airbus DS, all rights reserved © 21AT © Earth-i, all rights reserved, © Planet Labs
                                                              PBC, 2023




26°23'39"S 153°4'45"E                  26°23'39"S 153°5'9"E                                 Department of Resources

Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 60

DRDMW Licensed Bore Search
200 m radius
      Legend                                                            Attribution



                                                                    Includes material © State of Queensland (Department of Resources); ©
        Registered water bores [RDMW             Road Crossing      Commonwealth of Australia (Geoscience Australia); © 21AT, © Earth-i, all rights
        and private]                                                reserved, 2023.
                                                    Bridge
                                                                    © State of Queensland (Department of Resources) 2021
             Artesian bore                          Tunnel
             Artesian bore (abandoned but                           © State of Queensland (Regional Development, Manufacturing and Water) 2021
        useable)
                                                 Road
                                                                    © State of Queensland (Department of Resources) 2023
             Artesian bore (abandoned and           Highway
        destroyed)                                  Main
             Artesian bore, ceased to flow          Local
                                                    Private
             Artesian bore, ceased to flow
        (abandoned but useable
                                                 Cities and Towns
             Artesian bore, ceased to flow
        (abandoned and destroyed)
             Sub-artesian facility               Railway
             Sub-artesian facility (abandoned
        but useable)
             Sub-artesian facility (abandoned
        and destroyed)
             Surface water facility
             Surface water facility (abandoned
        but useable)
             Surface water facility (abandoned
        and destroyed)

        Places: Land parcel

             Site - Lot 149 on N21859

        Places: My Places

             200 m radius




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 61

                                                                              ADG Consulting Pty Ltd




                      Appendix C:           Preliminary Concept Plans




                        ADG1580.23 Dewatering Management Plan_Rev0_28.09.23




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 62

                                                NOOSA VILLA

                                                                                                                                                                                  CLIENT NAME: DAVID & CRAIG DODD                                PROJECT NAME: NOOSA VILLA
                                       www.chriscloutdesign.com.au                  GENERAL NOTES:
                                                                                    Use written dimensions only. DO NOT scale drawings. Contractors to verify all                 SITE ADDRESS: 30 Mossman Court, Noosa Heads, Qld 4567
                                       A: OFFICE 1/20 DUKE STREET
                                                                                    dimensions on site prior to commencing works. Site location in accordance with
                                          SUNSHINE BEACH, QLD 4567
                                                                                    engineers details. These drawings are to be read in conjunction with engineers design
                                                                                                                                                                                  DRAWING TITLE:   COVER
                                       E: [email protected]              and details, the accompanying building specification and schedule of finishes. If in doubt,   DRAWING DATE: 11/07/23       SCALE:                @ A3   DRAWN BY: C.CLOUT

Document Set ID: 22828362
                                       P: (07) 54748 107     BSA LICENCE: 1127508   please request clarification. DO NOT ASSUME.
                                                                                                                                                                                  ISSUE:   PRELIMINARY CONCEPT                                                               C0.0
Version: 1, Version Date: 26/02/2024

Page 63

   KEY:                                                                                                  AREAS:                    COSTING GUIDLINE:
   AW - AWNING WINDOW      CO - COFFEE MACHINE          N   - NICHE        SLD - SLIDING DOOR            LOWER FLOOR: 299m²        703m² x $8000 = $5,624,000
                                                                                                         GROUND FLOOR: 188m²       703m² x $10000 = $7,030,000
   B      - BATH           FD    - FRENCH DOORS         OV - OVEN          SLW - SLIDING WINDOW          UPPER FLOOR: 216m²
                                                                                                                                   NOT INCLUDING TERRACES
   BFD - BI-FOLD DOOR      FR    - FRIDGE               P   - PANTRY       T   - TUB                     GFA= 703m²                OR POOLS
   BFW - BI-FOLD WINDOW    FP    - FIXED PANEL WINDOW   SH - SHOWER        V   - VANITY BASIN            SITE = 234.7/ 609.5
                                                                                                         SITE COVER =38.5%
   CT - COOK TOP           L     - LOUVER WINDOW        S   - SINK         WC - WATER CLOSET




                                                  30 MOSSMAN COURT, NOOSA
                                                       HEADS, QLD 4567
                                                       AREA = 609.56M2
        ORTH
       N
                                                                                                                                                                                                                                              www.chriscloutdesign.com.au
                                                                                                                                                                                                                                                    A: OFFICE 1/20 DUKE STREET
                                                                                                                                                                                                                                                    SUNSHINE BEACH, QLD 4567
                                EXISTING
                                PONTOON                                                                                                                                                                                                             E: [email protected]
                                LOCATION                                                                                                                                                                                                                   P: (07) 54748 107

                                                                                                                                                                                              3
                                                                                                                                                                                         C3.1                                                               BSA LICENCE: 1127508




                                                                                                    20
                                                                                                       27


                                                                                                                                                                                              00
                                                                                                                                                                                         20




                                                                                                                                                                                                                                              GENERAL NOTES:
                                                                                                                                                                             FLAT ROOF                                                        Use written dimensions only. DO NOT scale
                                                                                                                                                                                                                                              drawings. Contractors to verify all dimensions
                                                                                                                                                                                                                                              on site prior to commencing works. Site
                                                                                                                                                                                                                                              location in accordance with engineers details.
                                                                                                                                                                                                                                              These drawings are to be read in conjunction
                                                                                                                                                                                                                                              with engineers design and details, the
                                                                       23                                                                                                                                                                     accompanying building specification and
                                                                          32                                                                                                                                                                  schedule of finishes. If in doubt, please
                                                                                                                                                                                                                                              request clarification. DO NOT ASSUME.

                                                                                            POOL BELOW
                                                                                                                                                                                                                                              PROJECT:
                                                                                                                                                                                                                                              Proposed New Residence



                                                                                                                                                                                                                             5684             PROJECT NAME:
                                                                                                                                                                                                                                              NOOSA VILLA
                                                                                                                                                                 FLAT ROOF
                                                                                                                                                                                                               UNDERGROUND
                                                                                                                                                                                                                 LPG TANK                     CLIENT:
                                                                                                                                                                                                                                              DAVID & CRAIG DODD

                                                                                                                                                                                                                                             W/M
                                                                                                                                                                                                                                              SITE ADDRESS:
                                                                                                                                                                                                                                              30 Mossman Court, Noosa Heads, Qld 4567


                                                                                                                                                                                                    ENTRY RAMP BELOW
                                                                                                                                                                                                                                              DRAWING TITLE:
                                                                                                                                                                                                                                              SITE PLAN
                                                                                                                                                                                                                                         4
                                                                                                                                                                                                                                     C3.1
                                                                                                                                                                                                                                              DATE:
                                                                                                                                                                                                                                              11/07/23

                                                                                                                                                                                                                                     1

                                                                                                                             SOLAR LOCATION                                                        DRIVEWAY BELOW
                                                                                                                                                                                                                                    C3.0      SCALE:
                                                                                                                                                                                                                                              1 : 100               @ A3



                                                                                                                                                                                                                                              DRAWN BY:
                                                                                                                                                                                                                                              C.CLOUT



                                                                                                                                                                                                                                              ISSUE:
                                                                                                                                                                                                                                              PRELIMINARY CONCEPT
                                                                                                                                                                                                       8022
                                                                                                                      2000




                                                                                                                                                                                                                                              DRAWING NO:

                                                                                                                                                                                                                                              C1.0
Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Page 64

   KEY:                                                                                                              AREAS:                    COSTING GUIDLINE:
   AW - AWNING WINDOW           CO - COFFEE MACHINE                N   - NICHE       SLD - SLIDING DOOR              LOWER FLOOR: 299m²        703m² x $8000 = $5,624,000
                                                                                                                     GROUND FLOOR: 188m²       703m² x $10000 = $7,030,000
   B      - BATH                FD   - FRENCH DOORS                OV - OVEN         SLW - SLIDING WINDOW            UPPER FLOOR: 216m²
                                                                                                                                               NOT INCLUDING TERRACES
   BFD - BI-FOLD DOOR           FR   - FRIDGE                      P   - PANTRY      T   - TUB                       GFA= 703m²                OR POOLS
   BFW - BI-FOLD WINDOW         FP   - FIXED PANEL WINDOW          SH - SHOWER       V   - VANITY BASIN              SITE = 234.7/ 609.5
                                                                                                                     SITE COVER =38.5%
   CT - COOK TOP                L    - LOUVER WINDOW               S   - SINK        WC - WATER CLOSET




                                                      30 MOSSMAN COURT, NOOSA
                                                           HEADS, QLD 4567
                                                           AREA = 609.56M2
        ORTH
       N
                                                                                                                                                                                   EN
                                                                                                                                                                               C RE                                                                                                                                                                    www.chriscloutdesign.com.au
                                                                                                                                                                              S                                                                                                                                                                              A: OFFICE 1/20 DUKE STREET
                                                                                                                                                                         IA
                                                                                                                                                                       ED                                                                                                                                                                                    SUNSHINE BEACH, QLD 4567
                                                                                                                                                                   M
                                                                                                                                                                                                                                                                                                                                                             E: [email protected]
                                                                                                                                                                                                                                                                                                                                                                    P: (07) 54748 107

                                                                                                                                                                                                                                                                                            3
                                                                                                                                                                                        CINEMA
                                                                                                                                                                                         5.2 x 5.1                                                                                         C3.1                                                                      BSA LICENCE: 1127508




                                                                                                             20




                                                                                                                                                                                 18
                                                                                                                                                                                   0m
                                                                                                                27




                                                                                                                                                                                    m




                                                                                                                                                                                                                                                            M
                                                                                                                                                                                                                                                            IR
                                                                                                                                                                                                                                                                                            00




                                                                                                                                                                                                                                                              RO
                                                                                                                                                                                                                                                                                       20




                                                                                                                                                                                                                                                                R
                                                                                                                                                                                                                                                                W
                                                                                                                                                                                                                                                                    AL
                                                                                                                                                                                                                                                                      L
                                                                                                                                                                                                                              GYM
                                                                                                                                                                                                                              4.4 x 3.8




                                                                                                                                               IN OL
                                                                                                                                                   W
                                                                                                                                                 DO
                                                                                                                                              W PO
                                                                                                                                                                                                                                                                                                                                                       GENERAL NOTES:




                                                                                                                                                                                                             G
                                                                                                                                                                                                                                                                                                                                                       Use written dimensions only. DO NOT scale




                                                                                                                                                                                                                 LA
                                                                                                                                                                                                                                                                                                                                                       drawings. Contractors to verify all dimensions
                                                                                                                                                                                                                                                                      SAUNA




                                                                                                                                                                                                                   SS
                                                                                                                                                                                                                                                                                                                                                       on site prior to commencing works. Site




                                                                                                                                                                                                                    W
                                                                                                                                                                                                                                                                          1.4 x 2.1                                                                    location in accordance with engineers details.




                                                                                                                                                                                                                        AL
                                                                                                                                                                                                                                                                                           WC




                                                                                                                                                                                                                          L
                                                                                                                                                                                                                                                                                                                                                       These drawings are to be read in conjunction



                                                                                                                                       W
                                                                                                                                     DO L
                                                                                                                                                                                                                                             D                                                                                                         with engineers design and details, the
                                                                                                                                  W POO
                                                                                                          POOL ABOVE
                                                                                                                                                                                                                                          CB                                                                                                           accompanying building specification and
                                                                                                                                   IN                                                                                                                                                                                                                  schedule of finishes. If in doubt, please
                                                                                                                                                                                                                                                                                                                                                       request clarification. DO NOT ASSUME.
                                                                                                                                                                                                                                                            LIFT               BATH
                                                                                                                                                                                                                                                                               1.5 x 3.6
                                                                                                                                                                                                                                                                                                                                                       PROJECT:
                                                                                                                                                                                                                         17                                                                                                                            Proposed New Residence
                                                                                                                          OW




                                                                                                                                                                                                                                                                                       STORE
                                                                                                                     W I OOL




                                                                                                                                                                                                                       16
                                                                                                                                                                                                                     15
                                                                                                                        ND




                                                                                                                                                                                                                                                                                            1.4 x 3.6
                                                                                                                        P




                                                                                                                                                                                                                    14
                                                                                                                                                                                                                  13
                                                                                                                                                                                                                 12                                                                                                   6272                             PROJECT NAME:
                                                                                                                                                                                                               11
                                                                                                                                                                                                                                                                                                                                                       NOOSA VILLA
                                                                                                                                                                                                              10




                                                                                                                                                                                                           ALL
                                                                                                                                                                                                             9




                                                                                                                                                                                                      SS W
                                                                                                                                                                                                            8
                                                                                                                                                                                                           7           PLANTER
                                                                                                                                            283.5 sq m                                                                                                                                                                                                 CLIENT:




                                                                                                                                                                                                     GLA
                                                                                                                                                                                                          6
                                                                                                                                                                                                         5                                                                                                                                             DAVID & CRAIG DODD
                                                                                  SPA ABOVE                                                                                                             4
                                                                                                                                                                                                       3                                                                                                                                              W/M
                                                                                                                                            4 CAR GARAGE                                               2                                                                                                                                               SITE ADDRESS:
                                                                                                                                               13.1 x 16.2                                             1
                                                                                                                                                                                                             UP                                                                                                                                        30 Mossman Court, Noosa Heads, Qld 4567



                                                                                                                                                                                                                                                                                                                                                       DRAWING TITLE:



                                                                                                                                                                                                                 GL OOR
                                                                                                                                                                                                                  D
                                                                                                                                                                                                                   AS
                                                                                                                                                                                                                                                                                                                                                       LOWER FLOOR PLAN


                                                                                                                                                                                                                      S                                                                                                                         4
                                                                                                                                                                                                                                                                                                                                                       DATE:




                                                                                                                                                                                                                                                                                                                                    E
                                                                                                                                                                                                                                                                                                                                               C3.1




                                                                                                                                                                                                                                                                                                                                 GAT
                                                                                                                                                  CAR TURN TABLE                                                                                                                                                                                       11/07/23




                                                                                                                                                                                                                                                                                                                                 ING
                                                                                                                                                                                                                                                                                                                                         1



                                                                                                                                                                                                                                          PANEL LIFT DOOR




                                                                                                                                                                                                                                                                                                                             SLID
                                                                                                                                                                                                                                                                                                        DRIVEWAY                        C3.0           SCALE:
                                                      STORE                                                                                                                                                                                                                                                                                            1 : 100               @ A3
                                                       2.3 x 4.4


                                                                                                                                                                                                                                                                                                                                                       DRAWN BY:
                        27 46
                                                                                                                                                                                                                                                                                                                                                       C.CLOUT



                                                                                                                                                                                                                                                                                                                                                       ISSUE:
                                                                                                                                                                                                                                                                                                                                                       PRELIMINARY CONCEPT
                                                                                                                                                                                                                                                                                                                   SEWER
                                                                                                                                                  2                                                                                                                                                     8350
                                                                                                                                   2000




                                                                                                                                                                                                                                                                                                                                                       DRAWING NO:
                                                                                                                                                C3.0
                                                                                                                                                                                                                                                                                                                                                       C1.1
Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

The text continues on page 65.

Used in these records

About this file

File size
5.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Reference Document - Acid Sulfate Soil Report 11_2023- OPW23_0189.pdf · 5.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.