Project No. PG-10899 Page | 2
November 2023
Ref: PG-10899, 2023-10-16, ASSMP VER 2
DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Management Plan – Proposed Residence, 30 Mossman Court, Noosa Heads
Tasks/Actions Investigations of ASS to date have targeted soils to a maximum
depth of 4.0m below the existing ground level. Zones of materials
with nett acidity above the action criteria have been identified
over the site at depths greater than 3m below ground level. The
materials to a depth of approximately 3.0m have been shown by
testing to not contain acid sulfate. If material below 3m is disturbed
they will require lime treatment to neutralize acidity.
In order to assess potential impacts and treatment requirements for
ASS, the Earthworks Contractor shall prepare an earthworks
schedule for the proposed construction activities prior to
commencement of the construction and earthworks activities.
ASS Treatment:
The spoil to be removed from site will either be treated onsite prior
to removal, or:
• treated on-site in accordance with the procedures given below;
or
− A temporary stockpile and treatment area will be
established where all excavated material may be
conditioned (dried) and lime treated, for subsequent use for
site landscaping or general fill requirements.
− Bunding will be constructed around the perimeter of the
designated ASS treatment pad to intersect and contain run-
off from the pad during the soil treatment operations.
− A suitably sized drain or temporary retention basin will be
constructed to collect drainage water from the treatment
pad in the vent of heavy rainfall during the construction
period. This will be constructed in a manner to protect
water quality in adjacent waterways.
− Alternatively, the basement excavation can be used as a
treatment platform with drainage water or run-off collected
in the retention basin will be tested to determine the quality
of the water. If the water quality falls outside the
performance indicators (described below), the water will
be treated prior to discharge from the site.
− The excavated spoil will be spread out in a designated
treatment area in layers up to 0.25m loose thickness. Aglime
with a neutralising value of 100% will be applied evenly over
the surface and thoroughly blended into the spoil at a
uniform minimum rate of 4kg (CaC0 3 )/m3.
− When incorporation of the lime is complete, Chromium Suite
validation testing of the treated spoil will be carried out to
establish that sufficient lime has been added (and uniformly
mixed) to neutralise the acid generation potential of the
spoil. The validation test will be deemed to have passed if
the net acidity is 18 mol H+/t. A higher result will require the
application of additional lime, until a satisfactory validation
result has been achieved.
− Once lime treatment is complete, the treated spoil will be
removed from site or may then be stockpiled for later use
for landscaping or for general site fill requirements.
− Selection of the most appropriate test methods and
determination of liming requirements for neutralisation will
be the responsibility of the ASS Consultant.
• Treated at an off-site facility in accordance with the approved
ASSMP for the facility.
Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Reference Document - Acid Sulfate Soil Report 11_2023- OPW23_0189.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.