Council Ref: MCU 16/0090


1 November 2016

The Chief Executive Officer
Noosa Council
PO Box 141
Tewantin QLD 4565
Via email: [email protected]


Attention: Mr Glen Conforti

Dear Glen,

Response to matters raised by Council

Development Permit for Material Change of Use of Premises for Wellbeing Type 2 – Social on
land at 468 McKinnon Dr COOROIBAH QLD 4565, being legally described as Lot 2 RP 214534.

Following is our client’s (the applicant) response to Council’s Request issued by email dated 6th September
2016. Please note that this response is made pursuant to the Sustainable Planning Act 2009, wherein the
applicant is responding by giving “all of the information requested…”

Each issue raised by Council has been provided below, with the applicant’s response provided underneath
each issue.

    1. Please provide plans and/or a schedule/table of Planning Scheme uses proposed (as close as
       practicable) and the allocated GFA for such uses.

Applicants Response

        Please refer to Attachment A – Site Plan Taylor’d Distinction – September 2016 – A1

    2. Provide plans that clearly define the areas of the access driveways and on-site carparking areas
       that are to be constructed with a sealed surface and the remaining gravel surfaces.

    3. Provide detail on the types of surfacing proposed.

    4. Provide additional detail on how the proposed development will address the additional traffic
       and parking demands created by the proposed additional events.

    5. Provide written approval from the Department of Transport and Main Roads for the proposed
       access points (2) and any proposed road improvements.
Log in to download the original file

MCU 16 0090 - Information Request Response - 031116.pdf · 724 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 2 pages

Page 2

Applicants Response

       Please refer to Attachment B - email response from TOD’s Consulting Engineers for 2, 3, 5.

       It is envisaged to hold up to 3 major fundraising events per year; such as a luncheon, a fair, and a
       Christmas party; with up to 100 patrons attending each event. Open days for the public will occur
       4 to 5 times a year.

       These proposed additional events will be managed through the implementation of a parking
       management plan under the direction of accredited personnel.

       These events will use The Tectonic Geotechnical report offsite parking, shuttle buses and drop off
       arrangements to meet any increased parking demand which cannot be accommodated within the
       proposed site.


   6. The submitted geotechnical report should be amended to include all proposed uses and make
      reference, where necessary, to any additional facilities that may be required for infrequent special
      events.

Applicants Response

       The Tectonic Geotechnical report within Section 7.0 considers the type and configuration of waste
       water systems that is most suited to the development.

       Within Section 7.1 Waste Water Design Allowance consideration and evaluation has been
       undertaken of the ultimate usage (peak) for the site. The assessment was based on a total pf 60
       persons onsite – being non resident.

              20 children
              20 staff
              20 work for the dole personnel

       Based upon wastewater flow rates given in the Code of Practice for On-Site Wastewater
       Management (July 2014), it has been estimated the proposed total wastewater flows as:

              60 persons x 30 L/person/day = 1,800 L/day (9 equivalent persons at 200 L/day/EP)

       The submitted Planning report details an expected maximum non resident population of 30 persons.

              20 clients
              10 staff

       Utlising the wastewater flow rates contained within the Code of Practice for On-Site Wastewater
       Management (July 2014), it is estimated that there is spare capacity of 900 L/day within the system.

Page 3

        The additional load of 6 Saturday night social club events and limited camp outs are easily
        accommodated within the spare capacity pf 900 L/day. These events are such that there are not
        large numbers in attendance as these events are for the Sunshine Butterflies clients, who are 20 in
        number.

        The café / kitchen does not form part of this application and is a “potential” use at a future point in
        time. If the use is to be considered into the future an assessment will be undertaken at that point
        in time of the capacity of the wastewater system and if any upgrades are required. It is an
        assessment and associated cost not required presently as confirmation of the proposed use has not
        occurred.

        Any events that are of a scale which exceed the “client” base of Sunshine Butterflies, i.e. Xmas Party,
        Fundraising events will all be catered for with the provision of portable onsite facilities (portaloo’s).
        The additional amenities will be provided to sufficient level so that NO load is placed within the
        existing wastewater system during the events.




We look forward to Council processing the application at its earliest convenience. Do not hesitate to contact
myself personally if you need to seek clarification further on these matters.

Kind Regards,




Russell Green MPIA

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.