Council archive · source document
Part 25 of 37 Appendix 23 - Community Consultation Report MCU12/0208
Very large file (40.2 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 44, section 1. The text section number identifies this passage in the reader.
PROJECT BENEFITS
DEVELOPMENT APPLICATION PROCESS
The Queensland Government declared the site os 0 Biodiversity Development Offset Area project in February 2012.
The application to Sunshine Coast Council will be for a Material Change of Use and Preliminary DA approval.
The project has been submlHed to the Major Projects Office for consideration os 0 state significant project.
ENVIRONMENTAL BENEFITS
Dedication of 139.5ha to the National Park at no cost to the community. which will expand this section of the Nafional Park by an additional 87%.
Enhancing the protection of 99.3&ha of environmental land within the BOOA Receive site by embedding the Ora" Koala Protection Measures into
the Community nlte Scheme structure.
Urban development of only 19% of the total site area and less than 35% of Ihe BDOA Received Site.
Linking of two Isolaled sections of the existing Noosa National Pork.
Provision of public access 10 Ihe Noosa National park and the shore of lake Weyba which is otherwise prohibited by private land ownership.
Maintaining the wildlife linkage between Ihe expanded National park and the Noosa Wildlife Refuge.
No new structures within 60m of the shore of Lake Weyba or in the lake.
Use of "World’s Best Practice" environmental engineering techniques.
No environmental impact on lake Weyba or adjoining wellands.
Accommodating all required environmental. bush fire and acoustic bullers.
Accommodating the requirements of the Queensland Coastal Plan.
The site holds no Rural land Use value.
The site contains no contamination.
The project will have no adverse Impact on local nood storage or nows.
The site Immediately abuts the existing Urban Footprint.
The site Is complementary to the existing urban development that abuts the site to the north, west and south.
INFRASTRUCTURE
Upgrading of Tldswell and HolleH local roads at no cost to the community.
Providing 0.erle.of pUblic cycleway. and walkway. throughout the project and enabling the cyclewoy linkage to be enhanced around Lake
Weyba from Noosa.
The project can be serviced by town water and sewer whilst some augmentation of the existing systems may be required.
SOCIO-ECONOMIC
Creation of 2,023 construction jobs.
Creation of 309 on and 011 site long term employment jobs.
$250mil of construction activity for the Shire.
Housing of 600 to 800 residents who will work in the Shire.
Provision of 0ronge of housing types and offord ability for 0 population of 2,000 people.
Stamp Duty income to the state 01 $7.64mll.
Annual household expenditure of $22.6mlllnto the Shire’s economy.
$661,000 of annual rates income to the Shire.
The project will provide substantial support to the retail and commercial businesses in the adjoining Nooso Civic Shopping Centre and the
Noosavllle commercial and Industrial precincts.
The project will only represent 20-24% 01 the OESR forecast population growth to 2031 In the Noosa area.
13 NOOSA ON WEYBA INITIAL PROJECT PRESENTATION
11 P age I N 0 05 a 0 n W e y baR e 5 ear c h
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 25 of 37 Appendix 23 - Community Consultation Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 40.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.