Skip to the record
Beware of cheap imitations.

Council archive · source document

Part 25 of 37 Appendix 23 - Community Consultation Report MCU12/0208

of 72

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (40.2 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 47, section 1. The text section number identifies this passage in the reader.

rlVotsa
            on         weyba

MEDIA RELEASE                                                                     11 October 2012


                  Landowners correct misconceptions

The landowners proposing a master planned community near Noosaville have been forced
to correct what they say are serious misconceptions about the proposal.


Northbrook, acting for the proponents for the Noosa on Weyba Village, said the community
consultation process had revealed fundamental misunderstandi ngs about the proposal

"We’re not denying opponents their opinions, but we’re concerned that misinterpretation of
the proposal’s detailed environmental ground truthing, planning and its overall intent is

negatively and unfairly affecting public debate," said Development Director Steve MacRae.

"Noosa on Weyba will be a world’s best practice development which will carry EarthCheck
accreditation for environmental, social and economic triple bottom line sustainability. It has

already been supported by pre-eminent koala expert Dr. Frank Carrick, Professor of Zoology
at the University of Queensland (and head of its Koala Study Program), for proposing an
environmental outcome which achieves a ’net benefit to koala habitat’."

    .  all buildings   -   which will be low density   -   within the first 250m from the lake edge will
       be restricted to one and two storeys, and will have covenants that ensure the

       dwellings blend with the existing environment:

    .
       any three storey dwellings will be set back at least 250m from the shoreline and will
       be mostly out of view from Lake Weyba:


    .  the project engineers have worked tirelessly with Unitywater to ensure existing water
       and sewerage infrastructure services can accommodate the proposal. The project
       team would not propose an urban          development on this site that had any risk of
       polluting the sensitive waterways so in-ground septic systems, like those used in
       earlier developments in the precinct, are not an option:


    .  the master plan will create an environment where wildlife will traverse through not

       only specific wildlife corridors, but also the new urban development, using the latest




                                                               N   0 05 a   0 n    W   e y   baR e 5 ear chi P age 14

Used in these records

About this file

File size
40.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 25 of 37 Appendix 23 - Community Consultation Report MCU12_0208.pdf · 40.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.