Council archive · source document
Part 25 of 37 Appendix 23 - Community Consultation Report MCU12/0208
Very large file (40.2 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 53, section 1. The text section number identifies this passage in the reader.
You have indicated difficulty in downloading the Master Plan for Noosa on Weyba from the project website.
Click on the image itself (not the text) and that should solve the problem.
If you continue to have difficulty, please contact Ryan in our consultation department on 0427 916020.
Yours sincerely
Steve MacRae
Development Director
Noosa on Weyba
25 October 2012 (Website enquiry)
Noosa on Weyba enquiry
From Steve MacRae.!.+
To
Bcc [email protected].+
Date 25 October 2012
Hi
Thanks for your enquiry. I have responded to your questions below.
Hi I am on the corner of Lake Weyba Drive and Eumarella Rd. We do not currently have reticulated water or
sewerage. Will your development give us access to reticulated water and sewerage?
. Whilst it is not our decision, our project, if approved, will bring town water and sewer down
from Noosa Civic, along Walter Hay Drive, to Hollett Road and within 80m of the shore of
Lake Weyba on our site. Should Eumarella Shores and Weyba Point Cottages elect to
discuss with us / council that they might be able to connect to these services, we are
happy to discuss it, but to date they have elected not to meet with us and be briefed on the
proposed project. If these two adjoining developments elected to connect to our services
then potential exists for some of the Weyba Shores residents to connect to them but, as
stated, this is a matter for the adjoining owners and council.
Also, where are you planning to put the "tea house and convenience outlets"? These are not shown on the
Master Plan.
. It is proposed to be on Hollett Road about 250m back from the Lake Weyba shore line, in a
location that best suits access to the new expanded Noosa National park.
Finally, what is the timing of your application? Is the Master Plan on the site the "final" for submission or is
there something else coming?
. There is a raft of documentation being completed now, following months of "ground
truthing" of the site, and we intend to lodge the development application before Christmas
2012. Once lodged there will be a public exhibition period controlled by council where all
project documents will be available for review. The volume of documents prohibits them
from being listed on our project web site.
I hope this helps
Again, thanks for your enquiry. You can keep up to date on the process of Noosa on Weyba by visiting
www.noosaonweyba.com.au
N 0 05 a 0 n W e y baR e 5 ear chi P age 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 25 of 37 Appendix 23 - Community Consultation Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 40.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.