Council archive · source document
Part 25 of 37 Appendix 23 - Community Consultation Report MCU12/0208
Very large file (40.2 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 68, section 1. The text section number identifies this passage in the reader.
SETTING ANEW BENCHMARK FOR NOOSA
Noosa on Weyba is a new proposed master planned community, which Job creation and economic injection
will set a new benchmark in successfully blending environmentally
From construction to completion, Noosa on Weyba will offer a
sensitive urban design with natural landscapes.
variety of job prospects for local residents. The village will take
Located south of Noosa Civic and partly adjacent to Lake Weyba, the approximately eight years to build, during which time it will:
innovative village will only account for 19% of the total 303 hectare create more than 2,000 jobs for construction and development
site and will retain more than 80% of green open space.
professionals
Working with the surrounding natural settings, the proposed master inject more than $250 million into the local economy
planned community includes; Once completed, more than 300 positions will be required to service
a range of diverse lifestyle options the onsite facilities, including the aged care facility.
around 876 homes varying in size, ranging from 300m2-600m2
Smart infrastructure
aged care and retirement living
Noosa on Weyba will establish low impact infrastructure to service its
boutique retail precinct including a tea house, which will become future community. Residents will access Noosa on Weyba via a new
the gateway to the expanded Noosa National Park. roundabout on Walter Hay Drive. The village’s internal road system
will be low-key, resembling interconnected driveways.
Enhancing and respecting lake Weyba Cycling and walking will be strongly encouraged through an extensive
network of pathways. The proposed path will allow the wider
Noosa on Weyba will respect and enhance Lake Weyba and the
community to be able to cycle from Walter Hay Drive to a section of
surrounding bush land.
Lake Weyba currently only accessed via a dirt track.
Forty metres of revegetated bush land will create a buffer along
Lake Weyba’s shoreline. Most of the proposed community will be built The team
on vacant land, which was cleared years ago for farming purposes
The project team behind Noosa on Weyba is led by Development
(see overleaf). Director Steve MacRae who delivered the world-renowned Koala Beach
Noosa on Weyba will adopt a Community Title Scheme where development in northern NSW, which successfully blended 500 homes
residents will not only contribute to the upkeep of parks and gardens; within 370ha of core koala habitat and has been internationally
they will also contribute to environmental protection measures to recognised as a leading case study. The Koala Beach project was
the immediate surrounds. recognised as advocating ’World’s Best Practice’ design standards by
Other key components include; the Smithsonian Institute.
Mr MacRae has applied many of his learnings from Koala Beach to the
A walkway will provide the public direct access to green open
Noosa on Weyba proposal.
space, which is currently off limits to the community.
Steve is supported by a team of internationally recognised
No homes will be built within 60 metres of the shoreline.
environmental experts, including pre-eminent koala expert Dr Frank
Strict building covenants will be put in place to ensure homes
Carrick, previously Professor of Zoology at Queensland University to
complement surroundings and reduce visual impact.
refine koala plans and recommend enhancements for the environment
Three storey apartment buildings will be set back approximately
(see back page for more information about Dr Carrick).
250m from the lake, largely out of sight.
The joint applicants have been land owners in Noosa since 1969
The stormwater system will use World’s Best Practice principles and
and 2005 respectively, so they understand the area very well and
remove the hance of run-off filtering into the lake.
appreciate its unique nature.
. n-groUltilsQ’lS2.
W The project will be lodged with Sunshine Coast Regional Council
on yb’
Low-speed roads -
narrow, like driveways -
will reduce tree clearing. by Christmas 2012.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 25 of 37 Appendix 23 - Community Consultation Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 40.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.