Original source · versioned page text
2022-08-09 Planning & Environment Meeting Agenda
The original of this document is very large (18.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 09 AUGUST 2022
Page 78 of 103
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 09 AUGUST 2022
17
Noosa Shire Council
Charges Resolution (No.7) 2022
10.3 Allocation of levied charge to trunk infrastructure networks
Infrastructure charges are provided for provision of trunk infrastructure in accordance with
the breakup agreement for:
(a) distributor-retailer trunk infrastructure, in accordance with Unitywater’s
Netserv Plan and Infrastructure Charges Schedule as determined by
Unitywater.
(b) Council trunk infrastructure, in accordance with Councils LGIP and
generally with Table 10.2 (Allocation of Council levied charge to trunk
infrastructure networks). The final allocation and spending of
infrastructure charges collected for trunk infrastructure will be
determined and administered by Council’s Finance Department.
Table 10.2 Allocation of Council levied charge to trunk infrastructure networks
Column 1 Column 2
Infrastructure charge Allocation of Council infrastructure
charge to trunk infrastructure networks
Transport | Public parks | *Stormwater
(%) and land for (%)
community
facilities
(%)
Infrastructure charge for
Residential development:
(a) reconfiguring a lot; or
(b) a material change of use; 48 a ag
or
(c) building work
Infrastructure charge for
Non-Residential 400 Nil =A
development :
(a) reconfiguring a lot
Infrastructure charge for
Non-Residential
development for: Calnulaton
(b) a material chan e of use; 100 Ml Separately
- a 100%
(c) building work
Note:
* The Non-Residential Stormwater charge is normally unable to be calculated on a reconfiguration of a lot
approval. This charge will therefore be calculated and applied on subsequent development permits for
material change of use or building work when the impervious area is able to be determined.
Council Resolution effective 19 August 2022
Page 78 of 103See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.