Original source · versioned page text
Stormwater Management Plan
Attached to the e-mail REC16/0014 - Planning report & supporting management plans, contour plan 2 of 2.
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSC5551 - 28 Elkhorn Dr, Tewantin 15 Figure B.3 – MUSIC Model ‘Bio-retention’ Node [OCR of page images] $C5551 - 28 Elkhorn Dr, Tewantin 15 Figure B.3 — MUSIC Model ‘Bio-retention’ Node A : — | | | Properties of BIO A [= | | Lf (entiom] Location * Products >> (Inlet Properties ;— Lining Properties Low Flow By-pass (cubic metres per sec) 0.000 Is Base Lined? Yes [| No igh Fi bic metres 100.000 High Flow By-pass (cubic metres per sec) — Vegetation Proper [oe coats © Vegetated with Effective Nutrient Removal Plants Extended Detention Depth (metres) 0.30 Surface Area (square metres) 105.00 © Vegetated with Ineffective Nutrient Removal Plants | Filter and Media Properties © Unvegetated Filter Area (square metres) 95.00 Unlined Fier Media Perimeter (metres) 38.00 pe eoeates Overflow Weir Width (metres) 2.40 Saturated Hydraulic Conductivity (mm/hour) 180.00 Fiter Depth (metres) 0.40 Underdrain Present? Yes [F] No TN Content of Fitter Media (mg/kg) 400 Submerged Zone With Carbon Present? © Yes No -| Orthophosphate Content of Filter Media (mg/kg) 50.0 a 0.00 | Depth 3,00 \~ Infiltration Properties Exfitration Rate (mm/h) D0 | Fluxes... | | Notes... | | More | | %concet || <P Back || WV Bish | a eer mes seo eons sjmnfemspomy
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.