Stormwater Management Plan
Attached to the e-mail REC16/0014 - Planning report & supporting management plans, contour plan 2 of 2.
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSC5551 - 28 Elkhorn Dr, Tewantin 3 1.0 Introduction 1.1 Background This report is to accompany and be considered part of an application to Noosa Council for a proposed sub- division at 28 Elkhorn Dr, Tewantin. 1.2 Scope Empire Engineering Pty Ltd was commissioned by Elkhorn Investments (QLD) Pty Ltd to develop a site based Stormwater Management Plan (SWMP) to outline water management strategies for the proposed development that will comply with Council’s relevant planning scheme policies, Queensland Development Code and the Environmental Protection Act (1994) and associated Environmental Protection (Water) Policy 1997. This report presents the results of a SWMP and outlines the proposed measures to be adopted in relation to stormwater quality management and stormwater quantity management for the subject site and the proposed development. 1.3 Existing Topography The subject site is described as Lot 70 M37807 with a combined area of 12,938m2. The site is bounded by Elkhorn Drive and existing residential allotments to the south, existing residential allotments to the west and north, and Noosa River Esplanade to the east. The site is currently occupied by a single residential house with an associated shed. The remainder of the lot is covered in grass and tree/shrubbery. See Figure 1.1.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.