Delegated Report - Code - Planning OPW18 0219 · OPW18/0219
Author Coordinator Engineering, Mark Lewis Development Assessment APPLICATION DETAILS Application No. OPW18/0219 Applicant Pile-It Pty Ltd Proposal Operational Works - Non Prescribed Tidal Works Properly Made Date 22 August 2018 Information Request Date 3 September 2018 Information Response Date 19 September 2018 Decision Due Date 8 November 2018 Report Completed Date 26 September 2018 Number of Submissions Not Applicable PROPERTY DETAILS Property Address 46 Saltwater Ave Noosaville Qld 4566 RP Description Lot 486 RP 880346 Land Area 878.0000 m² Existing Use of Land Residential STATUTORY DETAILS SEQRP Designation Urban Footprint Locality Noosaville Zone Detached Housing Overlays Natural Hazards Assessment Type Code PROPOSAL The application seeks approval for Operational Works – Jetty and Boat Lifting Device. site details Background There is no higher order approval requiring the works. The submitted plans indicate that the existing structures in the canal frontage of the site will be removed as part of these works. Relevant conditions have been included. The applicant, as part of their information response, requesting Council change the application to include a boat lifting device. assessment Instruments for Statutory Assessment Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development: State Planning Policy; South East Queensland Regional Plan; Planning Regulation 2017 The Noosa Plan. The following codes from the Noosa Plan are applicable to this development: Watercourses Works Code The application has been found to generally comply with all applicable statutory instruments. cONSULTATION Referral Agencies Not applicable Other Referrals Not applicable conclusion & reasons for decision The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval. The report is provided in accordance with Section 63(5) of the Planning Act 2016. RECOMMENDATION With regard to Application No OPW18/0219 for Operational Works – Jetty and Boatlifting Device situated at 46 Saltwater Ave Noosaville Qld 4566 and described as Lot 486 RP 880346, it is recommended the application be approved in accordance with the following details for the Decision Notice: application details Application No: OPW18/0219 Street address: 46 Saltwater Ave Noosaville Qld 4566 Real property description: Lot 486 RP 880346 Planning Scheme: The Noosa Plan (8 June 2018) Decision details Council decided to issue the following type of approval: Development Permit for Operational Works – Jetty and Boat Lifting Device CURRENCY PERIOD of approval The currency period for this development approval is 2 years starting the day that this development approval takes effect. assessment manager conditions Approved Plans Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 28227-J1 A Jetty Plan and Details prepared by SCG Consulting Engineers 5 September 2018 28227-J2 B Kayak Step Details prepared by SCG Consulting Engineers 19 September 2018 The boat lifting device must be a floating pontoon type (Floatbricks) or similar. All structures must be designed and constructed such that they are free standing within the waterway and are not connected to or behind the revetment wall All structures must have no detrimental effects on stormwater drains and/or easements. Jetties must have a level-walking surface of R.L 1.000 A.H.D or be level with the top of the revetment wall. A rigid handrail must be fitted on one side of the walkway. No posts or vertical supports of the proposed jetty are to extend vertically from the structure unless they provide support for the handrail. There must be no electrical reticulation system carrying electricity in excess of 24 volts beyond the revetment wall unless all switches and power outlets are positioned above the 1%AEP flood level. Lighting associated with the use must be designed, installed, operated, and maintained in accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting. Rock scour protection, wrapped in geotextile, extends from 750mm up to approximately 5000mm from the face of the revetment wall in Noosa Waters. Piles are to be: Located clear of this rock protection where applicable, or alternatively Where the scour protection extends beyond 750mm: Prior to driving piles, the rocks are to be removed to expose the geotextile and the geotextile cut neatly to allow it to be turned back. During pile driving, care is to be taken to ensure the geotextile is not damaged. At the completion of pile driving, the fabric is to be turned down around the pile and the rocks replaced around the piles The jetty and boat lifting device are to be used for private purposes only with no commercial operations to be undertaken. Boat repair activities are not permitted on site. Wastewater and sullage must only be disposed of at approved pumpout facilities. The mooring facility must not be utilised for live-aboard purposes. Any construction and post construction activity is not to impact on the condition of the waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA (1994) and the Environmental Protection (Water) Policy 2009. Certification by a Registered Professional Engineer of Queensland that states that the jetty and boatlifting device are constructed in accordance with best practice methods and are structurally sound must be submitted to Council. This certification must be submitted to Council within three (3) months of the completion of the works. A final inspection and approval of the structure by Council’s Inspector is also required. Please contact Council’s Planning Assessment Section (Development Audit & Response Officer 0428738563) to arrange the inspection. This approval lapses where the construction of the jetty has not commenced within two (2) years of the date of issue of the approval, unless application is made and approved by Council for an extension. After completion, the proposed works must be maintained in a sound state of repair in accordance with the approved plans referral agencies Not applicable. Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: General Advisory Notes Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent. The approval or conditions do not absolve the owner of the land from complying with all the conditions of this approval and/or relevant Council By-Laws and Policies and/or relevant statues and/or statutory regulations in the execution and/or performance of said works. Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time. Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Sustainable Planning Act 2009 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees. Building and Construction Industry (Portable Long Service Leave) Levy The QLeave levy must be paid prior to the issue of a development permit where it is required. Council will not be able to issue a Decision Notice without receipt of details that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212 6855. property notes Not applicable. VARIATION approval details Not applicable. further development permits required Not applicable. submissions Not applicable. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. [word/footer1.xml] Page 3 of 5 [word/header1.xml] 3 [word/header2.xml] DEVELOPMENT ASSESSMENT DELEGATED REPORT
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning OPW18 0219Related documentApplication case desk ↗
About this file
- File size
- 33 KB (small file)
- File type
- DOCX
No other editions are linked here.