Rfi - P0352-25-003-02-GYMPIE-ST-TEWANTIN

of 23

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (23.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 16, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                                                                                                                                                                                                                GENERAL NOTES:
                                                                                                                                                                                                                                                                                                                                                                                1.          THE CONTRACTOR SHALL SUPPLY ALL LABOR, MATERIALS, PLANT AND EQUIPMENT TO CONSTRUCT THE WORKS AS DOCUMENTED AND STRICTLY IN ACCORDANCE
                                                                                                                                                                                                                                                                                                                                                                                            WITH THE RELEVANT AUTHORITY STANDARDS, SPECIFICATIONS AND REQUIREMENTS.
                                                                                                                                                                                                                                                                                                                                                                                 2.         THE EXISTING SERVICES THAT ARE SHOWN ON THE DRAWINGS ARE PROVIDED FOR INFORMATION PURPOSES ONLY. NO RESPONSIBILITY IS TAKEN BY THE
                                                                                                                                                                                                                                                                                                                                                                                            SUPERINTENDENT OR THE PRINCIPAL FOR INFORMATION THAT HAS BEEN SUPPLIED BY OTHERS, OR ANY EXISTING SERVICES THAT MAY BE PRESENT NOT SHOWN ON
                                                                                                                                                                                                                                                                                                                                                                                            THE DRAWINGS. RPEQ WHO CERTIFIES AN ENGINEERING DESIGN MUST ENSURE THAT IT IS BASED UPON ON-SITE VERIFICATION (e.g POTHOLING) OF THE LOCATION,
                                                                                                                                                                                                                                                                                                                                                                                            DEPTH, TYPE AND SIZE OF EXISTING SERVICES THAT ARE CRITICAL TO THE DESIGN. THE CONTRACTOR SHALL VERIFY THE POSITION OF ANY UNDERGROUND
                                                                                                                                                                                                                                                                                                                                                                                            SERVICES WITHIN THE AREAS OF WORKS AND SHALL BE RESPONSIBLE FOR MAKING GOOD ANY DAMAGE THERETO. ANY ALTERATION WORKS TO SERVICES WILL BE
                                                                                                                                                                                                                                                                                                                                                                                            CARRIED OUT ONLY BY THE SERVICE OWNER AUTHORITY UNLESS APPROVED OTHERWISE.
                                                                                                                                                                                                                                                                                                                                                                                 3.         ALL CONSTRUCTION ACTIVITIES UNDERTAKEN SHALL COMPLY WITH CURRENT WORKPLACE HEALTH AND SAFETY REQUIREMENTS AND LEGISLATION.
                                                                                                                                                                                                                                                                                                                                                                                 4.         PRIOR TO COMMENCING WORK, THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL RELEVANT LOCAL AUTHORITY PERMITS.

                                                                                       6                          7                                                                                                                                                                                                                                                              5.         THE CONTRACTOR SHALL NOT COMMENCE THE DEMOLITION OF ANY EXISTING BUILDINGS AND/OR STRUCTURES WITHOUT APPROVAL FROM THE SUPERINTENDENT.
                                                                                    1038m²                      1079m²
                                                                                                                                                                                                                                                                                                                                                                                 6.         THE CONTRACTOR SHALL APPLY INDUSTRY BEST PRACTICE SO WORKS SHALL NOT DISTURB OR AFFECT NEARBY RESIDENTS EITHER BY DUST, NOISE, FLOODING OR
                                                                                                                                                                                                                                                                                                                                                                                            DISCONNECTION OF SERVICES. CONTRACTOR TO ENSURE THAT ACCESS AND SERVICES TO EXISTING PROPERTIES ARE AVAILABLE AT ALL TIMES.




                                                                           S150
                                                                                                        5                                                                                                                                                                                                                                                                        7.         THE CONTRACTOR SHALL VERIFY LEVELS OF EXISTING SERVICE CROSSINGS AND CONNECTION POINTS PRIOR TO COMMENCEMENT OF WORKS AND NOTIFY
                                                                                                        824m²
                                                                                                                                                                                                                                                                                                                                                                                            SUPERINTENDENT OF ANY DISCREPANCIES BETWEEN ACTUAL AND PROPOSED DESIGN LEVELS.




                                                                                                                                                                      BUTLER STREET
                                                                                                        4
                                                                                                                                                                                                                                                                                                                                                                                 8.         THESE ENGINEERING DRAWINGS ARE TO BE READ IN CONJUNCTION WITH THE APPROVED VEGETATION MANAGEMENT PLAN, WHERE APPLICABLE. WHEN IN DOUBT,
                                                                                                     711m²                                                                                                                                                                                                                                                                                  ALL EXISTING TREES ARE TO REMAIN UNLESS DIRECTED OTHERWISE.
                                                                                            S150
                                                                                                                                                                                                                                                                                                                                                                                 9.         HOLD POINT: ONCE THE BASE OF MANHOLES, INSPECTION PITS, GULLIES AND FIELD INLETS FOR STORMWATER DRAINAGE AND SEWERAGE HAVE BEEN POURED,
                                                                                                                                                                                                                                                                                                                                                                                            CONSTRUCTION SHALL ONLY RE-COMMENCE ONCE THE SUPERINTENDENT AND/OR ENGINEER HAVE INSPECTED THE WORKS.
                                                                                                                                                                                                                                                                                                                                                                                10.         THE CONTRACTOR SHALL NOTE DURING THE COURSE OF THE WORKS WHEN JOINT INSPECTIONS WITH THE AUTHORITY AND THE SUPERINTENDENT ARE REQUIRED.
                                                                                   1                2                     3
                                                                                                                                                                                                                                                                                                                                                                                            THESE INCLUDE PRE-STARTS, SUBGRADES, PRE-SEALS, CLEARING, AND OTHER SUCH INSPECTIONS AS NOMINATED IN THE APPROVAL AND THE SPECIFICATIONS. THE
                                                                                  600m²            600m²                 600m²
                                                                                                                                                                                                                                                                                                                                                                                            CONTRACTOR SHALL ENSURE NO WORKS PROCEED PAST THE INSPECTION POINT UNTIL THE JOINT INSPECTION HAS BEEN SUCCESSFULLY COMPLETED.

                                                                                                                                                                                                                                                                                                                                                                                      SEWER NOTES
                                                                                                                                                                                                                                                                                                                                                                                     1.        ALL DESIGN OF GRAVITY SEWERAGE NETWORK WORKS SHALL BE IN ACCORDANCE WITH THE GRAVITY SEWERAGE CODE OF AUSTRALIA, SOUTH EAST QUEENSLAND
                                                                                            REET                      GYMPIE STREET
                                                                                                                                                                                                                                                                                                                                                                                               SERVICE PROVIDERS EDITION VERSION 2.1 (SEPTEMBER 2021), PART 1: PLANNING AND DESIGN AND PART 3: DRAWINGS.
                                                                                  GYMPIE ST                                                                                                                                                                                                                                                                                           2.       ALL CONSTRUCTION OF GRAVITY SEWERAGE NETWORK WORKS SHALL BE IN ACCORDANCE WITH THE GRAVITY SEWERAGE CODE OF AUSTRALIA, SOUTH EAST
                                                                                                                                                                                                                                                                                                                                                                                               QUEENSLAND SERVICE PROVIDERS EDITION VERSION 2.1 (SEPTEMBER 2021), PART 2: CONSTRUCTION AND PART 3: DRAWINGS.
                                                                                                                                                                                                                                                                                                                                                                                      3.       ALL PRODUCTS AND MATERIALS USED IN CONSTRUCTION OF GRAVITY SEWERAGE NETWORK WORKS SHALL BE IN ACCORDANCE WITH THE SOUTH EAST
                                                                                                                                                                                                                                                                                                                                                                                               QUEENSLAND CODE ACCEPTED CIVIL INFRASTRUCTURE PRODUCTS AND MATERIAL LIST, AND THE MOST RECENT VERSION OF THE LIST IN EFFECT AT THE DATE OF
                                                                                                                                                                                                                                                                                                                                                                                               THE CONSTRUCTION PRE-START MEETING.
                                                                                                                                                                                                                                                                                                                                                                                      4.       CONSTRUCTION WORKS SHALL BE SUPERVISED BY AN ENGINEER WHO HAS RPEQ REGISTRATION. WORKS NOT COMPLYING WITH THIS REQUIREMENT WILL NOT BE
                                                                                                                                                                                                                                                                                                                                                                                               PERMITTED TO CONNECT INTO UNITYWATER'S SEWERAGE NETWORK.
             NEARMAP                                                                                                                                                                                                                                                                                                                                                                  5.       ALL LIVE WORKS ASSOCIATED WITH THE SEWERAGE NETWORK SHALL BE CARRIED OUT AT THE DEVELOPER'S COST, EITHER:
                                                                                           LOCALITY PLAN                                                                                      ENVIRONMENTAL CONDITIONS                                                                                                                                                                6.       BY THE CONSTRUCTOR, FOR ‘MINOR’ SEWERAGE CONNECTION WORKS, DEFINED IN THE A&C MANUAL UNDER SECTION PRE-START MEETING, UNDER THE
             SEWER DRAWING INDEX                                                                   SCALE: 1:1000
                                                                                                                                                                                              VEGETATION PROTECTION
                                                                                                                                                                                                                                                                                                                                                                                               INSPECTION OF THE CONSTRUCTION CERTIFIER WHO SHALL FOLLOW THE PLANNED NETWORK INTERVENTION PROCESS, OR
                                                                                                                                                                                                                                                                                                                                                                                      7.       BY QUOTATION REQUEST TO UNITYWATER PRIVATE WORKS, FOR SEWERAGE CONNECTION WORKS NOT MEETING THE CRITERIA FOR CLASSIFICATION AS ‘MINOR’.
             DWG NO.                  DRAWING TITLE                                                                                                                                           A.       TREES LOCATED ALONG THE FOOTPATH SHALL BE, TRANSPLANTED PRIOR TO CONSTRUCTION, OR REPLACED IF
                                                                                                                                                                                                                                                                                                                                                                                      8.       THE CONSTRUCTOR SHALL VERIFY THE LOCATION AND DEPTH OF EXISTING SERVICES WITH RELEVANT ASSET OWNERS AND AUTHORITIES BEFORE COMMENCING
                                                                                                                                                                                                       DESTROYED.
             C400                     SEWER LOCALITY PLAN                                                                                                                                                                                                                                                                                                                                      WORKS.
                                                                                                                                                                                              B.       WHEN WORKING WITHIN 4m OF TREES, RUBBER OR HARDWOOD GIRDLES SHALL BE CONSTRUCTED WITH 1.8m
                                                                                                                                                                                                                                                                                                                                                                                      9.       PRIOR TO COMMENCEMENT OF ANY VARIATION WORKS, THE CONSTRUCTOR MUST FIRST OBTAIN APPROVAL FROM THE REGISTERED MAJOR CONNECTIONS
             C401                     SEWER LAYOUT PLAN                                                                                                                                                BATTENS CLOSELY SPACED AND ARRANGED VERTICALLY FROM GROUND LEVEL. GIRDLES SHALL BE STRAPPED TO
                                                                                                                                                                                                                                                                                                                                                                                               CERTIFIER.
                                                                                                                                                                                                       TREES PRIOR TO CONSTRUCTION AND REMAIN UNTIL COMPLETION.
             C410                     SEWER LONGITUDINAL SECTIONS                                                                                                                             C.         TREE ROOTS SHALL BE TUNNELED UNDER, RATHER THAN SEVERED. IF ROOTS ARE SEVERED THE DAMAGED AREA
                                                                                                                                                                                                                                                                                                                                                                                     10.       UNLESS SPECIFIED OTHERWISE ALL MATERIALS AND WORK SHALL COMPLY WITH THE RELEVANT AUSTRALIAN STANDARDS.
                                                                                                                                                                                                         SHALL BE TREATED WITH A SUITABLE FUNGICIDE. CONTACT RELEVANT COUNCIL ARBORIST FOR FURTHER ADVICE.                                                                           11.       ALL WORK ASSOCIATED WITH LIVE SEWERS OR MAINTENANCE HOLES SHALL BE SUPERVISED BY AGENCY AT THE DEVELOPER'S COST.
                  NAME OF ESTATE                           TEWANTIN - 7 LOT SUBDIVISION                                                                                                       D.         ANY TREE LOPPING REQUIRED SHOULD BE UNDERTAKEN BY AN APPROVED ARBORIST.                                                                                                     12.       ALL PIPES AND MATERIALS SHALL COMPLY WITH THE REQUIREMENTS OF THE "ACCEPTED PRODUCTS AND MATERIALS" LIST.
                                                                                                                                                                                              SOIL                                                                                                                                                                                   13.       EACH ALLOTMENT SHALL BE SERVED BY A Ø100 uPVC PROPERTY CONNECTION. FOR ALLOTMENTS OTHER THAN SINGLE RESIDENTIAL, A Ø150 uPVC PROPERTY
                  SUBDIVIDER                               NOVATO GROUP PTY LTD                                                                                                               A.         TOPSOIL AND SUBSOIL SHALL BE STOCKPILED SEPARATELY.
                                                                                                                                                                                                                                                                                                                                                                                               CONNECTION SHALL BE PROVIDED.
                                                                                                                                                                                                                                                                                                                                                                                     14.       PROPERTY CONNECTIONS SHALL BE LOCATED WITHIN THE PROPERTY AS SHOWN IN THE DRAWINGS.
                                                                                                                                                                                              B.       CARE SHALL BE TAKEN TO PREVENT SEDIMENT FROM ENTERING THE STORMWATER SYSTEM. THIS MAY INVOLVE
                  APPLICATION No.                          -                                                                                                                                           PLACING APPROPRIATE SEDIMENT CONTROLS AROUND STOCKPILES.                                                                                                                      15.       PROPERTY CONNECTION BRANCHES SHALL EXTEND INTO THE PROPERTY A MINIMUM OF 500mm AND A MAXIMUM OF 1000mm.
                                                                                                                                                                                              CREEK CROSSINGS                                                                                                                                                                        16.       PROPERTY CONNECTIONS HAVE BEEN DESIGNED TO CONTROL THE REQUIRED SERVICE AREA OF EACH LOT AT A GRADE OF 1:60 AND A MAXIMUM DEPTH OF THE
                                                                                                                                                                                                                                                                                                                                                                                               PROPERTY CONNECTION AT 1.5M UNLESS OTHERWISE STATED. FOR JUNCTION DETAILS REFER SEQ-SEW-1106-1 TO SEQ-SEW-1106-6.
                                                                                                                                                                                              A.         SILTATION CONTROL MEASURES SHALL BE PLACED DOWNSTREAM OF ANY EXCAVATION WORK.
                                                                                                                                                                                                                                                                                                                                                                                     17.       WHERE PIPES ARE LAID IN FILL, THE FILLING SHALL BE CARRIED OUT IN LAYERS NOT EXCEEDING 300mm (LOOSE) IN DEPTH AND SHALL BE COMPACTED UNTIL THE
                  APPROVAL DATE                            -                                                                                                                                  B.         APPROPRIATE SEDIMENT CONTROLS SHALL BE USED TO PREVENT SEDIMENT FROM ENTERING THE CREEK.
                                                                                                                                                                                                                                                                                                                                                                                               COMPACTION IS NOT LESS THAN 95% OF THE MATERIALS MAXIMUM COMPACTION WHEN TESTED IN ACCORDANCE WITH A.S.1289 (MODIFIED COMPACTION). TESTING
                                                                                                                                                                                              C.       NO SOIL SHALL BE STOCKPILED WITHIN 5m OF THE CREEK.                                                                                                                                     SHALL BE CARRIED OUT AFTER EACH ALTERNATE LAYER. IN ALL SUCH CASES APPROVAL OF CONSTRUCTED SEWERS WILL NOT BE ISSUED BY AGENCY UNLESS
                  DRAWING/PLAN No.                         C400 - C410                                                                                                                        REHABILITATION                                                                                                                                                                                   CERTIFICATES ARE PRODUCED CERTIFYING THAT THE REQUIRED COMPACTION HAS BEEN ACHIEVED.
                                                                                                                                                                                              A.       PREDISTURBANCE SOIL PROFILES AND COMPACTION LEVELS SHALL BE REINSTATED.                                                                                                       18.       THE CONTRACTOR SHALL VERIFY THE LOCATION AND DEPTH OF EXISTING SERVICES WITH RELEVANT AUTHORITIES BEFORE COMMENCING WORKS.
                  No. OF ALLOTMENTS                        7                                                                                                                                  B.       PREDISTURBANCE VEGETATION PATTERNS SHALL BE RESTORED.                                                                                                                         19.       SEWERS SHALL BE DISUSED IN ACCORDANCE WITH PROCEDURE SET OUT IN THE SEQ SEWER CODE.
                  AREA                                     0.59 ha                                                                                                                            ALL WATER AND SEWER CONSTRUCTION
                                                                                                                                                                                                                                                                                                                                                                                      20.      BENCH MARK AND LEVELS TO AHD.
                                                                                                                                                                                              WORK UNDERTAKEN BY THE CONTRACTOR                                                                                                                                                       21.      CONSTRUCT EMBEDMENT AND TRENCHFILL TO SEQ-SEW-1200-2, 1201-1 TO 1205-1 (TYPE 4 SUPPORT UNLESS GEOTECHNICAL INVESTIGATIONS DEMONSTRATE THAT
                  LENGTH          Ø100                     17m                                                                                                                                SHALL COMPLY WITH ALL APPLICABLE                                                                                                                                                                 TYPE 3 SUPPORT IS ADEQUATE. TYPE 4 SUPPORT TO BE USED WHERE MIGRATORY NATIVE SOILS (OR SAND OR FINE CLAY MATERIAL) ARE ENCOUNTERED
                                                                                                                                                                                              WORKPLACE HEALTH AND SAFETY                                                                                                                                                                      ADJACENT TO THE EMBEDMENT ZONE AND SINGLE SIZE AGGREGATE IS USED) AND LOCAL COUNCIL STANDARDS FOR ROADWAYS, WHICHEVER IS MORE ONEROUS.
                  OF SEWER        Ø150                     109m                                                                                                                               LEGISLATION.                                                                                                                                                                            22.      CONSTRUCT BULKHEADS AND TRENCH STOPS TO SEQ-SEW-1206-1 AND TRENCH DRAINS TO SEQ-SEW-1207-1
                  MAINS                                                                                                                                                                       CONSULTANT: RECOR
                                                                                                                                                                                                                                                                                                                                                                                      23.      CONSTRUCT MANHOLES TO SEQ-SEW-1302-1, 1303-1, 1304-1, 1305-1, 1306-1, 1307-1, 1308-1, 1313-1, 1314-1, 1314-2.
                                                                                                                                                                                                                                                                                                                                                                                      24.      INSTALL MH/MS TYPE B COVERS TO SEQ-SEW-1308-5 TO 1308-7
                                                                                                                                                                                              CONTACT: EOIN WHITMORE
                                                                                                                                                                                              TELEPHONE: 1300 469 707                                                                                                                                                                 25.      INSTALL MH/MS TYPE D COVERS TO SEQ-SEW-1308-8 TO 1308-11
                                                                                                                                                                                                                                                                                                                                                                                      26.      CONSTRUCT PROPERTY CONNECTIONS TO SEQ-SEW-1104-1, 1104-3, 1105-1, 1106-1 TO 1106-6.
  LIVE SEWER WORKS                                                                                                                                                                                                                                                                                                                                                                    27.      INSTALL DETECTABLE MARKER TAPE ON ALL SEWER MAINS AND PROPERTY CONNECTIONS.
                                                                                                                                                                                                                                                                                ALTERATION TO                                                                                         28.      CONCRETE FOR MH CONSTRUCTION SHALL BE SPECIAL CLASS TO WSA PS-358 WITH REQUIREMENTS FOR CALCEREOUS AGGREGATE.
                                                                                                                        EXISTING ASSET                                                                                                                    DEPTH                  EXISTING MH
                                                                                                                   DIA.                MH/MS                                          COVER          LOT                         CONNECTION
          No.            DESCRIPTION                                                                                         ID AT                                                                            F.S.L.    E.S.L.                             TO
                                                                                                                  SEWER                TYPE                                            TYPE          No.                             IL                                           BENCHING
                                                                                                                         CONNECTION                                                                                                                      INVERT
                                                                                                                                                                                                                                                                                REQUIRED (Y/N)

                         CONTRACTOR TO INSTALL A NEW MAINTENANCE SHAFT 1/1 BETWEEN                                    Ø150
          1 (A)          EXISTING MANHOLES TO PROVIDE ACCESS TO THE ALIGNMENT OF THE                                  uPVC                  EX 1/2               MS                       -        LOT 6       2.745    2.569        -0.950                 3.695                             -                                ALL WATER AND SEWERAGE CONSTRUCTION SHALL COMPLY WITH THE
                         NEW SEWER WITHIN LOT 6                                                                                                                                                                                                                                                                                REQUIREMENTS OF THE QUEENSLAND WORK HEALTH AND SAFETY ACT                                                                                                           I, A. Khuzaini Sani on X-X-2025, certify that:
                                                                                                                      SN 10
                                                                                                                                                                                                                                                                                                                               2011. CONTACT THE DIVISION OF WORKPLACE HEALTH AND SAFETY FOR
                                                                                                                      Ø100                                                                                                                                                                                                                                                                                                                                                                        1.    This design drawing has been assessed in accordance with
                         CONTRACTOR TO INSTALL A NEW MAINTENANCE SHAFT 1/2 BETWEEN                                                                                                                                                                                                                                             INFORMATION. PHONE 1300 362 128
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        the requirements of the SEQ Code and Unitywater Standards;
          2(A)           EXISTING MANHOLES TO PROVIDE ACCESS TO HOUSE CONNECTION FROM                                 uPVC              EX 1/1 - EX 1/2          MS                       -        LOT 6       2.905    2.586        1.206                  4.111                             -                                                                                                                                                                                                    2.   The construction of the works must only be undertaken in
                         LOT 7                                                                                        SN 10                                                                                                                                                                                                    LIVE WORKS NOTES:                                                                                                                                                        accordance with this drawing; and
                                                                                                                                                                                                                                                                                                                               1. ALL WORK ON EXISTING SEWER TO BE CARRIED OUT BY THE CONTRACTOR (IN                                                                                               3.   No design amendments are permitted either before or during
                         CONTRACTOR UNDER UNITY WATER SUPERVISION TO MAKE LIVE                                                                                                                                                                                                                                                      ACCORDANCE WITH AN APPROVED NETWORKS ACCESS PERMIT) UNDER AGENCY                                              ALL ENVIRONMENTAL PROTECTION                          construction without the approval of Unitywater
           1B
                         CONNECTION AFTER SUCCESSFUL 'ON MAINTENANCE' INSPECTION                                                                                                                                                                                                                                                    SUPERVISION, AT THE DEVELOPERS EXPENSE.                                                                       MEASURES SHALL BE IMPLEMENTED PRIOR
                                                                                                                                                                                                                                                                                                                               2. LIVE WORKS CANNOT COMMENCE UNTIL ALL RELEVANT TEST CERTIFICATES HAVE                                            TO ANY CONSTRUCTION WORK                         Signed                     ACR/MAJ 2025-144
   NOT FOR CONSTRUCTION                                                                                                                                                                                                                                                                                                             BEEN PROVIDED AND ACCEPTED BY AGENCY.                                                                         COMMENCING, INCLUDING CLEARING

   ----           ----     ----                                                        ----                ----                  North Point    Approved                                                                                                                                                                                                                      Project Address                                                                Title

   ----           ----     ----                                                        ----                ----
                                                                                                                                                EOIN WHITMORE
                                                                                                                                                                                                                                                                                                                                                                              12 GYMPIE STREET, TEWANTIN                                                      SEWER RETICULATION COVER SHEET, DRAWING INDEX
                                                                                                                                    N
   ----           ----     ----                                                        ----                ----                                  31423    ----                                                                                                                                                                                                                                                                                                AND LOCALITY PLAN
   ----           ----     ----                                                        ----                ----                                 For and on behalf of RECOR Pty Ltd.

   ----           ----     ----                                                        ----                ----                                 Scale                                                                                                                      ENGINEERING & PROJECT SERVICES                                                                     Client Details                                                                 Project Name                                                                                    Sheet Size
                                                                                                                                                                                                                                                                              SUNSHINE COAST | BRISBANE
  17.02.26
ISSUED   FOR OPW APPROVAL
                   ISSUED FOR OPW APPROVAL                                                 CS            EW                                                                                        NTS                                                                       www.recor.au | ABN 89 647 469 707                                                                NOVATO GROUP                                                                    7 LOT RESIDENTIAL SUBDIVISION                                                                     A1
    A             ----     ----                                                            IJ              AY                                                                                                                           COPYRIGHT © This drawing is subject to copyright in accordance with the agreement between RECOR Pty Ltd and RECOR's                                                                                                  Project Number                                         Drawing Number                            Revision
                                                                                                                                                                                                                                         client. This drawing shall only be used for this specific project. This drawing shall not be used for construction until marked as

  Rev           Date                     Revision Description                     Drawn Check                                                                                         DO NOT SCALE, IF IN DOUBT ASK                                                            'Issued For Construction' in the revision description.                                                                                                                        P0198-25-001 - 01                                       C400                                       A
Log in to download the original file

RFI - P0352-25-003-02-GYMPIE-ST-TEWANTIN.pdf · 23.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.