Original source · versioned page text
PTP_12376 - Rev0 - FMP
Page 3 of 6 SITE FLOOD RISK The primary source of flood risk to the site and in particular site users relate to flash flooding within the site and wider catchment from heavy rainfall events. Specifically, there are number of ponds on the site which pick up runoff from rainfall within the site and overflow down the site and into the main creek that forms the southwestern border of the site. Although these ponds and other features are significantly lower than any of the existing or proposed buildings on the site and would not pose direct risk to those buildings, access routes to and from the site could be subject to inundation and flooding in more severe events. The purpose of this Flood Management Plan presented in Appendix 1 is to provide a quick reference guide for the site owners and users of the site in an emergency. We trust this information is satisfactory for your current needs. Should you have any questions, please feel free to contact the undersigned. Written By: Reviewed By: Craig Smerdon Nick Ward Senior Civil Engineer Chief Operating Officer 328 Upper Pinbarren Creek Road 16 September 2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.