                      AGENDA


Infrastructure & Services
   Committee Meeting


           Tuesday, 3 February 2015


                 commencing at 9.00am
        Council Chambers, 9 Pelican Street, Tewantin



Committee: Crs Sandy Bolton (Chair), Bob Abbot, Frank Pardon, Noel Playford
Log in to download the original file

2015-02-03 Infrastructure & Services Committee Agenda(PDF, 214KB).pdf · 219 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 26 sections

Section 2

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA         3 FEBRUARY 2015


TABLE OF CONTENTS


ITEM                                                                  PAGE

ATTENDANCE & APOLOGIES                                                     -

PRESENTATIONS                                                              -

PLANNING & INFRASTRUCTURE DEPARTMENT REPORTS                              3

1      PLANNING & INFRASTRUCTURE DEPARTMENT UPDATE - 2ND QUARTER
       2014/15                                                             3

Civil Operations                                                          8

2      BUSHLAND RESERVE FIRE MANAGEMENT PLANNING                           8

Infrastructure Planning & Design                                         11

3      2014/15 CHRISTMAS FREE HOLIDAY BUSES SUMMARY                      11

COMMUNITY SERVICES DEPARTMENT REPORTS                                    17

4      COMMUNITY SERVICES DEPARTMENT UPDATE - 2ND QUARTER 2014/15        17

CLOSED SESSION                                                       -




                                                                Page 2 of 27

Section 3

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                          3 FEBRUARY 2015



PLANNING & INFRASTRUCTURE DEPARTMENT REPORTS
(Infrastructure Services only)

1                          PLANNING & INFRASTRUCTURE DEPARTMENT UPDATE - 2ND QUARTER
                           2014/15
OCUMENT IN FOR MATI ON




Author                                Director, Planning & Infrastructure, Martin Drydale
                                      Planning and Infrastructure Department

Index                                 Subject/Branch Management/Internal Departmental
                                      Meetings/Planning & Infrastructure

Attachments                           Nil


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Director, Planning and Infrastructure to the Infrastructure
and Services Committee Meeting dated 3 February 2015 providing an update on operations
of the Planning and Infrastructure Department.


REPORT
The Planning and Infrastructure Department consists of the following Branches and teams:

•                        Planning & Environment
•                        Strategic Land Use Planning
•                        Asset Planning
•                        Infrastructure Planning & Design
•                        Civil Operations
•                        Building & Plumbing Services

This following table provides an update on the activities undertaken in the Planning and
Infrastructure Department during the quarter (October 2014 to December 2014).

Information is also provided on activities that are currently being worked on and provides an
indication of future activities to be undertaken.




                                                                                                 Page 3 of 27

Section 4

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                     3 FEBRUARY 2015


PLANNING & INFRASTRUCTURE SERVICES DEPARTMENT

SECTION         RECENT ACHIEVEMENTS                       CURRENT PRIORITIES                          LOOKING AHEAD
Planning &      •   Hosted Healthy Waterways Report       •   Weyba Creek Bank Stabilisation          •   Develop Environmental Offset
Environment         Card                                      Design                                      Register
                •   Submission to Fisheries Management    •   Guidelines for Environment Levy         •   Develop Environment Profile web
                    Review                                •   Mapping Strategic Biodiversity              pages
                •   Conducted Environmental Offset            Corridors                               •   Coordinate a Hosted Property visit for
                    Training for internal staff           •   Community Consultation for Pest             Land For Wildlife & Voluntary
                •   Green Army Application for Bushland       Management Plan                             Conservation Areas
                    Care Program                          •   Developing performance measures         •   Review and update Bushland
                •   Glossy Black Training Day                 and reporting abilities for                 Reserve Management Plans
                •   Report to Council on Environment          development applications                •   New Planning Legislation –
                    Levy                                  •   Draft Business Case for Management          templates, processes, delegations,
                                                              of Mooring and Anchoring on Noosa           fees & charges, planning online
                                                              River                                       review
                                                          •   DA Planning Service Review
                                                          •   Development of LGIP (i.e. update
                                                              PIP) consistent with state Statutory
                                                              Guidelines
                                                          •   Preparation of Information Request
                                                              for application to extend Noosa Civic




                                                                               Page 4 of 27

Section 5

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                             3 FEBRUARY 2015



SECTION              RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                           LOOKING AHEAD
Strategic Land Use   •   Proposed Scheme amendments               •   Community Engagement on Scheme           •   New Planning legislation implications
Planning                 approved by Council and in for State         amendments                               •   Next SEQ Regional Plan
                         Interest Review – highlights including   •   Community Profile being finalised        •   Strategies to inform next planning
                         o    Reducing red tape on small and      •   Business Land Demand                         scheme
                              rural businesses;                   •   Agriculture and Agricultural Lands       •   Assist with Social Plan and Economic
                         o    Improved choice for small               Study                                        strategy
                              affordable housing options;         •   Housing Needs analysis                   •   Identify priorities for climate change
                         o    Improved visitor accommodation      •   Integrated flood risk management             planning across Council
                              options including increased             plan                                     •   Noosa Car-parking Study
                              camping options
                         o    Improved flood risk mapping;        •   Bushland Reserve Fire Management
                         o    Improves climate change risk            Plan
                              management                          •   MCU application for RV park at
                         o    Clarified biodiversity and              Cooroy
                              vegetation management               •   Traffic study underway
                     •   Queensland Rail negotiations to
                         retain level railway crossing at
                         Pomona
                     •   State bushfire hazard mapping
                         amendments
                     •   Tait cottage MCU application

Asset Planning       •   Implementation of the Technology         •   Asset management plan development        •   Further development of work order
                         One (T1) mobility system with the        •   Further implementation of the mobility       management system to improve
                         completion of beach access                   across other asset classes                   asset management outcomes
                         inspections as the pilot.                •   Development of reporting capabilities    •   The approval of the 5 year future
                     •   Development of the capital works             within the T1 asset system                   capital works program
                         database within the T1 system            •   Development of a 5 year reseal and       •   The development of a stormwater
                         commenced.                                   rehabilitation program for sealed road       asset renewal program
                     •   Commence the capital works budget            network.
                         development for 2015/16
                     •   Tender awarded for the asset
                         condition assessment of the sealed
                         road network




                                                                                       Page 5 of 27

Section 6

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                              3 FEBRUARY 2015



SECTION               RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                        LOOKING AHEAD
Infrastructure        •   Completion of 15 bus stop designs for    •   Ongoing delivery of designs for the   •   Developing the 2015/2016 Capital
Planning & Design         Capital Works program.                       Capital Works Program.                    Works Program
                      •   Award of design for new Noosa style
                          bus shelter to a local firm.
                      •   Preparation of grant application for
                          potential $2M grant for Pilot Cycle
                          Route program with no contribution
                          required from Council.

Civil Operations      •   Improved communication &                 •   Parks Service Review                  •   2015/16 Budget Development
                          management of the Bushland Care          •   Delivery of Resurfacing &             •   Development of Noosa Tree Policy
                          Programme through Quarterly                  Gravel Road Re-sheeting
                          Bushland Care Group Leaders                  Programmes.
                          meeting and introducing a trial          •   Finalising a Fire Management Plan
                          Bushland Care Officer role.                  for Noosa Shire.
                      •   Testing of potential rehabilitation
                          candidates for Road Reseal &
                          Rehabilitation Programme completed.


Building & Plumbing   •   Completion of toilet and shower          •   Inclusion of new amenities building   •   Implementation of six month
Services                  amenities building at Boreen Point           into Councils asset register              maintenance program.
                          Caravan Park (capital works program)     •   Stage one: Annual testing of 67       •   Stage two: Complete annual testing
                      •   Testing of Council owned backflow            council owned devices shall               of the remaining 40 Council owned in
                          prevention devices. (This program            commence in February 2015.                September 2015
                          was previously under contract with       •   Compliance Permits ( 20 day           •   Continue to develop processes for
                          external contractor).                        approvals) are taking 7 days to           reduced timeframes.
                      •   Met legislative time frames for              complete                              •   Continue to develop consistent
                          Plumbing approvals.                      •   Compliance Assessment (2 day              approaches in this area of approvals
                      •   Met Council’s response timeframe for         approvals) are taking 1 day to            to meet Planning Scheme
                          plumbing information request.                complete                                  requirements.
                          (legislative requirement 10 days)        •   Current priority is to reduce 7 day
                      •   Met Council’s response timeframe             response to a 5 day turnaround
                          Referral Agency Building. (legislative       response
                          requirement 10 days)



                                                                                        Page 6 of 27

Section 7

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                              3 FEBRUARY 2015


Previous Council Consideration

Nil.

Finance & Risk

All the activities identified are covered under the approved budget for the Planning and
Infrastructure Department.

Consultation

External Consultation - Community & Stakeholder

Nil.

Internal Consultation

Nil.

Departments/Sections Consulted:

       Community Services                   X   Planning & Infrastructure
       Disaster Management & Public Order   X   Building & Plumbing Services
       Waste & Environmental Health         X   DA Planning
       Community Facilities                 X   Strategic Land Use Planning
       Cultural Facilities                  X   Asset Design & Investigations
                                            X   Asset Planning
                                            X   Civil Operations
                                                Environment
                                            X
       Executive Office                         Corporate Services
       Community Engagement                     Finance
       Customer Service                         ICT
       Executive Support                        Procurement & Fleet
       Governance                               Property & Facilities
       Human Resources                          Revenue Services




                                                                                     Page 7 of 27

Section 8

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                            3 FEBRUARY 2015


Civil Operations
2                        BUSHLAND RESERVE FIRE MANAGEMENT PLANNING
OCUMENT IN FOR MATI ON




Author                              Manager Civil Operations, Allan Hull
                                    Planning & Infrastructure Department
                                    Principal Environment Officer, Peter Milne
                                    Planning & Infrastructure Department

Index                               ECM/Fire Management Plan

Attachments                         Nil


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Manager, Civil Operations and Principal Environment
Officer to the Infrastructure and Services Committee Meeting dated 3 February 2015 and:
A.                       Note that a review of fire management of Noosa’s Bushland Reserve Network has
                         been completed;
B.                       Endorse the commencement of bushfire risk assessments, as per industry standard,
                         by Planning and Environment Branch and Natural Areas staff for priority bushland
                         reserves; and
C.                       Endorse the development of a new Noosa Bushland Reserve Network Fire
                         Management Plan by Planning and Environment Branch staff, in consultation with Civil
                         Operations.



REPORT
Council manages 159 bushland reserves covering an area of approximately 2,633ha. Fire is
an important consideration in the management of these reserves. Depending on fire
frequency and intensity, fire may support, or impact upon, the biodiversity values of the
reserve. Vegetation can also represent a fire hazard to neighbouring properties.

Senior Strategic Planner, Anne Wilson, recently undertook a review of Council’s fire
management current planning documents and operations. The Senior Strategic Planner’s
internal review highlighted:

•                        A Noosa Bushland Reserve Network Fire Management Plan was developed in 2006
                         and 23 Fire Management Plans have been completed for specific reserves. Some of
                         the actions of these plans, such as the establishment of fire trails and prescription
                         burning programs, have been implemented, but further work needs to be done;
•                        The 2006 Bushland Reserve Network Fire Management Plan and reserve specific Fire
                         Management Plans are now out dated, with new additions of reserves to the network
                         and changes in legislation;
•                        The State has developed new fire hazard mapping which identifies that out of the 159
                         bushland reserves, 122 are within the mapped medium, high or very high bushfire
                         intensity overlay;



                                                                                                     Page 8 of 27

Section 9

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                             3 FEBRUARY 2015


•      To verify the State fire hazard mapping, local fire hazard risk assessments are
       required to determine levels of risk for each of the reserves;
•      Based on their size, 28 reserves are identified as a priority for a risk assessment;
•      Noosa’s extensive vegetated road reserve network needs also to be considered with
       fire management planning.

Based on these findings it is proposed to develop a new Noosa Bushland Reserve Network
Fire Management Plan. The plan will include an assessment of the capital and operational
costs to undertake fire management actions for consideration in the 2015/2016 budget
process. The plan will also assist in longer term operational and financial planning for fire
management. Actions identified in the plan may include the establishment of more fire trails,
prescription burning programs to maintain biodiversity values, and the identification of
Council resources which may be needed to effectively undertake fire management actions
on bushland reserves.

The proposed Noosa Bushland Reserve Network Fire Management Plan would need to
consider Council’s statutory obligations under the following acts:

•      Fire and Emergency Services Act 1990
•      Land Act 1995
•      Nature Conservation Act 1992
•      Noosa Shire Council Local Law No.3 (Community Health and Environmental
       Management)
•      Workplace Health and Safety Act 2011

Following the development of the Management Plan, a further report will be submitted to a
future Infrastructure and Services Committee Meeting with more detailed recommendations
in sufficient time for consideration as part of the 2015/16 budget development. A copy of the
2006 Fire Management Plan will be available in the Councillors Room.

Previous Council Consideration

Nil.

Finance & Risk

Currently there is approximately $20,000 allocated for bushland reserve fire management
(fire trail clearing/slashing and staff time). It is proposed that the Planning and Environment
Branch develop a new Noosa Bushland Reserve Network Fire Management Plan based on
the Senior Strategic Planners review, and assess the costs to undertake further fire
management to inform the 2015/2016 budget process.

Consultation

External Consultation - Community & Stakeholder

Qld Fire and Emergency Services
Qld Public Safety Business Agency




                                                                                      Page 9 of 27

Section 10

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                             3 FEBRUARY 2015


Internal Consultation

Disaster Management & Public Order
Civil Operations Parks and Natural Areas
Planning and Environment


Departments/Sections Consulted:

x   Community Services                     x   Planning & Infrastructure
x   Disaster Management & Public Order         Building & Plumbing Services
    Waste & Environmental Health               DA Planning
    Community Facilities                       Strategic Land Use Planning
    Cultural Facilities                        Asset Design & Investigations
                                               Asset Planning
                                           x   Civil Operations
                                               Environment
                                           x
    Executive Office                           Corporate Services
    Community Engagement                       Finance
    Customer Service                           ICT
    Executive Support                          Procurement & Fleet
    Governance                                 Property & Facilities
    Human Resources                            Revenue Services




                                                                                   Page 10 of 27

Section 11

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                       3 FEBRUARY 2015


Infrastructure Planning & Design

3                        2014/15 CHRISTMAS FREE HOLIDAY BUSES SUMMARY
CUMENT IN FORMA TION




Author                              Project Officer, Joanna Ferris
                                    Planning & Infrastructure Department

Index                               Project: Pub-Trans: PT-FHB; NHLPC, Subject: 45.15 Traffic and
                                    Transport

Attachments                         Nil


EXECUTIVE SUMMARY
The 2014/15 Christmas Free Holiday Buses were conducted between 26 December 2014
and 4 January 2015 at a total cost of $67,904 (excl GST).

There were an estimated 43,146 passengers carried over the 10 day period. The estimated
cost per passenger during the 10-day period was $1.57.

The services included six bus services (5 existing TransLink services and a temporary
shuttle between Peregian Beach and Noosa Heads), Council Cabs and the Boreen Point-
Tewantin Flexilink service.

The Noosa Heads Lions Park was utilised as a paid car park for 13 of the 17 days (26
December – 11 January 2015). A total of 4,437 vehicles utilised the car park which
generated $44,370 with 60% of the parking revenue going to the Tewantin-Noosa Heads
Lions Club, the remaining 40% was used to fund traffic control and for the park
refurbishment.

RECOMMENDATION
That Council note the report by the Project Officer to the Infrastructure & Services
Committee Meeting dated 3 February 2015 providing an overview of the 2014/15 Christmas
Free Holiday Buses program.


REPORT
The purpose of this report is to provide an overview of the 2014/15 Christmas Free Holiday
Buses program (26 December 2014 - 4 January 2015).

1.                       Free Services

The following five Noosa-specific TransLink services were included:
•                      Route 626 – Tewantin to Sunrise Beach via Noosa Heads
•                      Route 627 – Tewantin to Sunshine Beach via Noosa Heads
•                      Route 628 – Noosa Parklands to Noosa Junction, via Noosa Civic
•                      Route 629 – Tewantin to Noosa Junction via Noosa Civic
•                      Route 632 – Noosa to Cooran via Cooroy and Pomona

Additional service:
•                      064 (1 bus) – Peregian Beach to Noosa Heads from 8am to 6pm


                                                                                              Page 11 of 27

Section 12

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                               3 FEBRUARY 2015


The additional service was provided because the existing Route 620 Noosa Heads-
Maroochydore bus service was not able to be part of the Free Holiday Buses Program.
Existing Council services:
•    Council Cabs and Boreen Point-Tewantin Flexilink were also free.

2.      Passenger Data

An estimated 43,146 passengers were carried over the 10-day period (passenger numbers
are recorded though manual ‘button pushing’ by the bus drivers). Refer to Table 1: Free
Services 26 Dec 2014 – 4 Jan 2015 for a breakdown of passenger numbers by route.

Table 1: Free Services 26 Dec 2014- 4 Jan 2015

Route      26       27      28      29       30       31       01 Jan   02 Jan   03 Jan     04      Total
           Dec      Dec     Dec     Dec      Dec      Dec                                   Jan
064        260      245     255     241      213      262      268      160      356        170     2,430

626        1,306    1,262   1,575   1,864    1,377    2,017    1,686    2,119    1,364      1,778   16,348

627        1,177    820     1,179   1,692    1,211    2,932    1,405    1,758    1,424      1,369   14,967

628        333      372     299     455      507      412      211      377      305        224     3,495

629        267      370     435     699      574      699      516      579      425        403     4,967

632        104      103     61      124      147      66       55       85       128        66      939

Total      3,447    3,172   3,804   5,075    4,029    6,388    4,141    5,078    4,002      4,010   43,146


Passenger data for Council Cabs and the Boreen Point- Tewantin Flexilink was consistent
with the regular passenger use.

The 2013/14 Christmas Free Holiday Buses passenger data for Routes 626, 627, 628, 629
and 630 from 26 Dec 2013 – 4 Jan 2014 was 47,681. However, in 2013/14 all buses across
the whole of the Sunshine Coast were free therefore it could be that the reason for the
reduction in patronage is due to the fact that there were more people connecting from other
services.

3.      Marketing

Marketing of the Free Holiday Buses included:

•     Provision of signage at major bus stops, 15 street banners, and variable message
      boards on major connecting roads;
•     Posters in all Council facilities, including a banner at Noosa library and Level 3 Council
      office;
•     Council communication tools including website, Facebook, eNews and messages on
      hold;
•     Liaison with external stakeholders (Tourism Noosa, Accommodation Providers,
      Shopping Centres etc.) for inclusion on websites, emails, and newsletters;
•     Specific promotion to Peregian community groups of temporary shuttle Route 064
      Peregian- Noosa Heads; and
•     Media launch with support from local newspapers.


                                                                                         Page 12 of 27

Section 13

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                             3 FEBRUARY 2015


TransLink also provided in-kind marketing support including but not limited to:

•    Inclusion of the additional shuttle services on TransLink’s journey planner;
•    Inclusion of messaging on webpages of all relevant TransLink routes;
•    Item in TransLink newsletter;
•    Web tile on TransLink home page leading up to and during free period; and
•    Newspaper advertisement in local newspapers.

4.     Passenger Assistant at Noosa Heads Bus Station

One Sunbus passenger assistant was based at Noosa Heads Bus Station from 9.30am to
4.10pm on the New Year’s Day public holiday (01 Jan 2015) and week-ends (27-28 Dec & 3-
4 Jan) to assist with passenger enquiries and movements at the station. Survey respondents
and the staff at the Visitor Information Centre all provided positive feedback about the
passenger assistant.

5.     Feedback Survey

A feedback survey was available on Council’s website and 40 hard copies were distributed
by the passenger assistant at the Noosa Heads bus station. The survey consisted of 16
questions seeking feedback on areas such as age, purpose of travel, satisfaction with trip,
residential status, reasons for using the Free Holiday Buses and awareness of public
transport. Of the 16 questions, 5 of the questions were targeted specifically at Noosa
residents. A total of 100 surveys were completed (60 online & 40 hard copy).

Points of interest include:

•    Nearly 70% of respondents who caught a Free Holiday Bus had access to a car in
     Noosa;
•    The main reason people caught a free holiday bus was to avoid traffic and congestion;
•    29% of users were satisfied with their trip and 70% were very satisfied;
•    85% of users caught a bus for recreational purposes e.g. to get to the beach,
     entertainment, dining etc., 18% used it to perform errands such as shopping, 14%
     caught a bus to visit friends/family and nearly 6% caught the bus to get to work (total is
     greater than 100% as people could select more than one answer);
•    If the buses had not been free, 57% of the respondents would have driven their car and
     20% would have caught the bus anyway;
•    As with previous years, word of mouth continued to be a primary means by which people
     found out about the Free Holiday Buses (40%), followed by street banners (27%), the
     newspaper (22%), and roadside traffic signs/posters (13%);
•    The residential status of respondents included – Noosa Council residents (34%),
     Queensland residents (23%), Sunshine Coast Council residents (20%), Interstate visitors
     (19%) and International visitors (4%);
•    36% of respondents were aged between 41-60 years and 28% were aged between 26-
     40 years;
•    Of the Noosa respondents, outside of the Free Holiday Buses, nearly 55% only catch a
     bus once a year and 20% never catch a bus. The main reason cited for not catching
     public transport was cost; and
•    When asked if there were free buses year round, would you/your household consider
     reducing the number of vehicles you owned, 63% of respondents said yes.




                                                                                    Page 13 of 27

Section 14

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                            3 FEBRUARY 2015


Some of the additional feedback provided by respondents included:

•    Great transport option, we are staying at Sunshine Beach and probably wouldn't have
     come to Hastings St if the bus option was not available. Definitely an incentive to beat
     the crazy traffic.
•    A wonderful service! Made a total difference to my personal options on my holiday!
•    Could do with a shuttle for Noosa Junction to Noosa Heads to ease local services.
     Thank-you
•    Excellent idea as a goodwill gesture to provide free buses over the holiday period. The
     passenger assist employee was very approachable, helpful, professional and polite,
     since it is tricky to establish which services are free, the additional assistance was
     essential. Thank-you.
•    I think it is good that Noosa Shire have provided the Free buses, it's just a shame that
     SCC doesn't feel the same because it is needed just as much for the rest of the coast as
     much as here in Noosa
•    I think the free buses are a great idea and I commend Noosa Council on having them. I
     think it is a disappointment that the Sunshine Coast Council have discontinued them.
•    It is an excellent initiative for the peak holiday seasons and should be continued. If
     extended it would benefit most on weekends.
•    It needs to be clearly advertised the times the free holiday buses apply. We had a lovely
     walk with relatives from abroad through the national park from sunshine beach to Noosa
     only to find out after a nice meal that the free buses had stopped running at 6pm so had
     to pay for 7 people. If I'd had known that it would have been cheaper to drive. I thought
     the bus drivers were very polite as once I knew about the times of the buses we used the
     service a few times to avoid traffic congestion
•    Is it all affordable, or do we rate payers have our rates increased to fund the tourists!


6.     Noosa Heads Lions Park Car Park

The Noosa Heads Lions Park was to be used as a car park from 26 December 2014 – 11
January 2015 but was closed for four days during this period due to wet weather as such the
park was used for 13 of the possible 17 days. Vehicles are charged a flat rate of $10. The
car park was managed by the Tewantin Noosa Lions Club with assistance from Council’s
Works Superintendent, Fred Spinks. There were a total of 4,437 cars with a daily average of
341 vehicles. This is a slight increase from 2013/14 and was attributed to the increase in
demand in the usually quitter mid-week days. The total income generated from the car park
was $44,370 with 60% of the parking revenue going to the Tewantin Noosa Heads Lions
Club. The remaining revenue is used to fund traffic control and park refurbishment.

7.     Traffic Control

Two traffic control officers were employed from 26 December 2014 to 11 January 2015, from
9.30am to 3.00pm each day to assist with traffic and pedestrian movement. The total cost of
the traffic control staff was $5,790 (excl GST). This was paid for by revenue raised from the
Noosa Heads Lions Park car park.

Traffic was deemed to be particularly heavy this year, in previous years traffic control was
not required all day.

Previous Council Consideration

Free Holiday Buses General Committee Meeting report – 25 August 2014.



                                                                                    Page 14 of 27

Section 15

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                            3 FEBRUARY 2015


Finance & Risk

The total cost for the Christmas 2014/15 Free Holiday Buses including marketing and bus
services was $67,904 and was funded out of the Public Transport Levy.

A marketing budget of $7,718 for the Christmas services was approved at Council’s Ordinary
Meeting of 26 August 2014. The actual expenditure was $7,134.

TransLink is paid for loss of revenue for the five TransLink bus routes and Council paid for a
shuttle service between Peregian and Noosa Heads. The total cost for the bus services was
$60,770 (Refer to Table 2: Bus Services).

Table 2 Bus Services

Services                                        Amount (excl GST)
TransLink Routes x 5                            $44,675
064 Peregian – Noosa Heads Shuttle              $16,095
Total                                           $60,770

It is estimated that the cost per passenger during the 10-day period was $1.57.

The total income generated from the Noosa Heads Lions Park car park was $44,370. The
Tewantin Noosa Heads Lions club received $24,201.


Consultation

External Consultation - Community & Stakeholder

Sunbus - Thanked Council and expressed appreciation for Council’s support.

Passenger Assistant – Dave was very busy and although he was scheduled to work 9:30-
4:00pm, he worked through his lunch break and didn’t get away until after 4:30pm. He
received feedback that it would be beneficial to have a passenger assistant all week, not just
on the week-ends and public holidays. Dave is involved in passenger transport for the Noosa
Triathlon and suggested that during the Free Holiday Buses, as is the case for the Noosa
Tri, there be a shuttle from Noosa Heads to Noosa Junction as this alleviates the amount of
traffic coming into Noosa Heads and ensures that Sunbus services run on time. Due to the
traffic congestion on Noosa Parade, some of the bus services were running up to 35-40mins
behind schedule.

Tewantin Noosa Heads Lions Club – Feedback regarding running of the car park.

Free Holiday Buses Survey – refer to report section 5. Feedback Survey

Internal Consultation

Works Superintendent, Fred Spinks – Traffic Control and Noosa Heads Lions Park.

Fred has been involved in traffic control over the Christmas period for many years and
expressed that this year the traffic was particularly bad and even if he had 10 traffic
controllers it wouldn’t have made any difference.

Management Accountant, Claudia Barnes – Free Holiday Buses Budget.



                                                                                   Page 15 of 27

Section 16

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                          3 FEBRUARY 2015


Departments/Sections Consulted:

   Community Services                   x   Planning & Infrastructure
   Disaster Management & Public Order       Building & Plumbing Services
   Waste & Environmental Health             DA Planning
   Community Facilities                     Strategic Land Use Planning
   Cultural Facilities                  x   Asset Design & Investigations
                                            Asset Planning
                                        x   Civil Operations
                                            Environment

   Executive Office                     x   Corporate Services
   Community Engagement                 x   Finance
   Customer Service                         ICT
   Executive Support                        Procurement & Fleet
   Governance                               Property & Facilities
   Human Resources                          Revenue Services




                                                                                Page 16 of 27

Section 17

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                       3 FEBRUARY 2015


COMMUNITY SERVICES DEPARTMENT REPORTS


4    COMMUNITY SERVICES DEPARTMENT UPDATE - 2ND QUARTER 2014/15

Author           Director Community Services, Alan (Fox) Rogers
                 Community Services Department

Index            ECM/Subject/Branch Management/Community Services Section

Attachments      Nil


EXECUTIVE SUMMARY
Not applicable

RECOMMENDATION
That Council note the report by the Director Community Services to the Infrastructure &
Services Committee Meeting dated 3 February 2014 providing an update on the operations
of the Community Services Department for the period 1 October 2014 to 31 December 2014.



REPORT

The Community Services Department consists of the following sections and teams:

•    Community Development, and Community Grants
•    Community Facilities (including Noosa Community Care, The J, The Bicentennial
     Centre, The Noosa Aquatic Centre, and The Noosa Leisure Centre);
•    Disaster Management and Public Order;
•    Libraries and Galleries; and
•    Waste, Environmental Health and Cemeteries.




                                                                              Page 17 of 27

Section 18

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                           3 FEBRUARY 2015


COMMUNITY SERVICES DEPARTMENT

SECTION            RECENT ACHIEVEMENTS                            CURRENT PRIORITIES                         LOOKING AHEAD
Waste Management   • Developed an information pack on             •   Drafting of a new contract for the     •   Finalisation of the Waste Strategy.
                     options for the disposal of organic waste        sale of metal from the landfill.       •   The first payment of royalties from
                     for distribution to the Community Jury       •   Commencement of works to                   LMS for gas extraction due in
                   • Council approval of a waste services             construct a bio basin and to upgrade       February 2015.
                     policy that details minimum service levels       the HES basin at the landfill.         •   Tendering and implementation of
                     and other criteria for variation to waste    •   Conducting a risk assessment of            2015/16 Capital Works Program.
                     services.                                        barriers at the three waste transfer   •   Redevelopment of the entrance to
                   • Finalisation of a new contract for the           stations.                                  the Eumundi Rd waste facility and
                     crushing of concrete at the landfill.        •   Development of a draft 5 year              improvement to directional signage.
                   • Extension of the Licence Agreement for           capital works program.
                     Briteside Industries to operate the Tip      •   Development of the 2015/2016
                     Top shop at the landfill.                        Waste Management Budget.
                   • Production and distribution of a public      •   Provision of information to the
                     education DVD on home                            Community Jury.
                     composting/worm farming.                     •   Commencement of concrete
                   • Extension of the Garden Waste service to         crushing to provide material for the
                     rural areas of the Shire.                        redevelopment of the green waste
                   • Completion of a draft Planning Scheme            processing pad and the bio-basin.
                     Policy on Waste Management.
                   • Awarding of major capital works contracts
                     for construction of a biological control
                     basin to collect and treat nutrient rich
                     stormwater at the Eumundi Landfill.




                                                                                   Page 18 of 27

Section 19

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                              3 FEBRUARY 2015


SECTION                RECENT ACHIEVEMENTS                           CURRENT PRIORITIES                           LOOKING AHEAD
Environmental Health   • Staff have completed an intensive 3-day     •   Training for Vector Control Officer to   •   Conduct review of EHO
                         LGAQ asbestos training course prior to          undertake vermin complaints and              administration functions and duties
                         devolution in early 2015 of additional          investigations thereby freeing up            of administrative support staff.
                         responsibilities under Public Health Act.       EHO time.                                •   Develop a regular food safety
                       • 50% of licenced premises (496 premises)     •   EHO’s to undertake further training          newsletter.
                         have been inspected for licence renewal.        of key staff in the handling and         •   Undertake a food safety compliance
                       • Follow up and resolution of outstanding         management of Asbestos.                      project on private water supplies.
                         unpaid annual licence renewals.                                                          •   Review existing development
                       • Completion of a report on food safety       •   Develop a new recreational water             approvals of Service Stations (ERA
                         compliance on sushi food.                       monitoring program.                          “deemed approval” premises) and
                       • Substantial improvements achieved in        •   Review the environmental health              undertake compliance program.
                         turnaround time for responding to CRM’s.        SAFI advice provided for customer        •   Investigate viability of contracting
                       • Completed improvements to food handler          service staff.                               vermin control of Council BBQ’s.
                         training course.                            •   Development of 2015/16 operational       •   Investigate potential for mobile
                       • Updated environmental health information        budget.                                      technology options to enhance the
                         on council’s website.                       •   Continue the annual inspection               EHO inspection program.
                       • Completed training of customer service          program of regulated premises to
                         staff in environmental health application       meet statutory requirements.
                         forms and fees.                             •   Continue to assess regulated
                       • Reviewed the local laws in environmental        premises licence applications, fit out
                         health field.                                   plans and development applications.
                                                                     •   Undertake customer service training
                                                                         for staff dealing with internments.




                                                                                       Page 19 of 27

Section 20

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                           3 FEBRUARY 2015


SECTION           RECENT ACHIEVEMENTS                             CURRENT PRIORITIES                         LOOKING AHEAD
Pest Management   • Pest Management Survey second quarter         •   Pest Management Survey for third       •   Extend a pig and deer control
                    completed.                                        quarter to commence 5 January              program with QPWS, Forestry ,SEQ
                  • Staff participated in stakeholder meetings        2015.                                      water and Noosa land holders.
                    to develop a new Pest Management Plan.        •   Complete deer survey in the            •   Training of community groups in
                  • Fox control index reduced from 5.86 to            Tinbeerwah area.                           Pest Management techniques.
                    3.2 in the Coastal strip through focussed     •   Procurement of equipment from the
                    control techniques, particularly around           $18,000 State Government Grant for
                    Teewah township.                                  Wild Dog control.
                  • Application submitted and approved for
                    $10,000 grant for Pig Traps – SEQ
                    Catchment and Mary River Catchment
                    Drought.
                  • Draft Pest Management Plan for Noosa
                    approved to go out for public consultation.
                  • Regular aerial treatment to control
                    mosquitoes underway.

Public Order      • The first draft of a new suite of Local       •   Council approval to go out for         •   New suite of Local laws approved by
                    Laws for the Noosa Shire has been                 public consultation on the new suite       Council prior to June 2015.
                    developed.                                        of local laws.                         •   Reduce the number of unregistered
                  • Planning for the 2015 house to house dog      •   Undertake the dog inspection of all        dogs in our pound.
                    inspection program including advertising          residential properties in the shire    •   Introducing a new structure for the
                    the program with a public notice in the           between February and June.                 local laws section in the middle of
                    newspaper and via press release.              •   Complete the operational review            the year.
                  • The local law operations service review           and commence the tasks identified      •   Roll out new dog off leash and dog
                    commenced.                                        during the review to improve the           on leash areas and educate dog
                  • Beach patrols are continuing to identify          sections outcomes.                         owners on the rules around dogs.
                    dog owners breaching the law.                 •   Continue random patrols to keep        •   Investigate the use of new mobile
                  • Illegal camping still occurring but to a          dog owners from going into                 technologies to achieve operational
                    lesser extent as the word spreads across          restricted areas.                          efficiencies.
                    the travelling public about Council’s         •   Continue patrols each day to
                    strong stance on this issue.                      identify any illegal campers and
                  • Busy Christmas and New Year period                move offenders on.
                    managing parking matters in the Shire         •   Undertake a safety audit of the
                    with a low number of complaints.                  office, cars and locations where
                                                                      officers regularly work at.


                                                                                   Page 20 of 27

Section 21

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                               3 FEBRUARY 2015


SECTION                RECENT ACHIEVEMENTS                            CURRENT PRIORITIES                        LOOKING AHEAD
Disaster Management    • Successful disaster management               •   Ongoing storm season                  •   Council approval for the Noosa Local
                         exercise held on 29/30 October.                  preparedness will be the focus of         Disaster Management Plan by June
                       • In house training in the Guardian system         the Disaster Management Team              2015
                         has commenced and has been well                  until Easter 2015.
                         received.                                    •   Continue in house training in
                       • The emergency operations team                    processes and systems, saving
                         continues to meet regularly.                     council funds to use elsewhere.
                       • The recovery function in the disaster plan   •   Redrafting the Noosa Local Disaster
                         has been tested to ensure our community          Management Plan.
                         is prepared.                                 •   Evacuation Centre Management
                       • Membership of the LDMG for 2015                  training.
                         reviewed and approved by Council.

Noosa Community        • Highly successful community and client       •   Finalise design and commence          •   Increase activity options at our Day
Care                     engagement at Animal farm day.                   construction for the Centre               Care centre.
                       • Design for refurbishment works at the            refurbishment.                        •   Develop business and marketing
                         Respite Centre completed.                    •   Expand and improve gardens for the        plan.
                       • Development of new PDs for Centre staff          Horticultural Therapy Program.
                         commenced.                                   •   Continue with the new Logo design
                                                                          and rebranding for NCC.

Noosa Leisure Centre   • Major bookings secured in 2015 for :         •   Finalise capital works delivery for   •   Undertake condition audit and
                         - Australian Badminton Championships             2014/15.                                  develop asset management plan.
                         - Noosa Long Weekend production by           •   Development of 2015/16 capital and    •   Prepare for 2015 major events.
                           Opera Australia                                recurrent works program.              •   Re-establish Jump Bunch birthday
                         - Noosa Long Weekend - Noosa and             •   Completion of maintenance                 parties and casual play room
                           Brisbane Symphony Orchestras                   program.                                  sessions for School Holidays.
                           anniversary performance.
                       • New booking from Sunshine Coast Area
                         Rollers for 6 x Roller Derby League
                         events from March to December.
                       • Hillsong Church Group held Christmas
                         services for first time at NLC –they
                         expressed that their expectations were
                         exceeded and very happy with NLC as
                         alternative venue.


                                                                                       Page 21 of 27

Section 22

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                               3 FEBRUARY 2015


SECTION                RECENT ACHIEVEMENTS                            CURRENT PRIORITIES                        LOOKING AHEAD
Noosa Aquatic Centre   • 2 week training camp for the NZ              •   Preparing for busy swim carnival      •   Ongoing refinement of automatic
                         Paralympic Team – very positive                  season – 10 carnivals in 3 weeks          payment process for the Learn to
                         feedback and rebooked for 2015.                  during Term 1.                            Swim program.
                       • Pre-season training camp for the GWS         •   Term trial of evening Group Fitness   •   Undertake condition audit and
                         Giants, second year running utilising gym        and Squad Programs.                       develop asset management plan.
                         & pool.                                      •   Progress Expression of Interest for
                       • Revenue targets met for 6 months from            Gym space.
                         July – December 2014.

The J &                • Removal of stage and other fixtures at the   •   Complete The J Service Review.        •   Implement actions from Service
Bicentennial             Bi centennial Centre (BCC) Main Hall to      •   Community social networking events        Review.
Community Centre         allow Noosa Gymnastics to move into the          at The J.                             •   Further develop relationships with
(BCC)                    building from January 1.                     •   Finalise Noosa Long Weekend               Noosa Junction Association and
                       • Successful relocation of several existing        Festival 2015 venue hire and              continue ongoing involvement with
                         BCC tenants to other Council facilities.         ticketing agreements.                     working groups.
                       • Qld Arts Alliance – installation of art      •   Ensure Noosa Gymnastics set up is
                         display in upper foyer at J.                     completed for new school term and
                       • Ticketing – Record number of pre-sales           finalise lease.
                         for Noosa International Food & Wine
                         Festival (NIFWF).
                       • The J operational review underway.




                                                                                       Page 22 of 27

Section 23

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                        3 FEBRUARY 2015


SECTION         RECENT ACHIEVEMENTS                            CURRENT PRIORITIES                          LOOKING AHEAD
Community       • Social plan Reference Group established      •   Undertaking literature and data         •   First draft of Social Plan due August
Development       and first meeting held.                          review phase of Social Plan                 2015.
                • MCU for Tait Duke House approved.                including community NFP facilities      •   Planning with United Synergies for
                  Stakeholder consultation undertaken for          audit.                                      new venue for annual Booin Gari
                  building design,internal layout completed.   •   Finalise building plans for Tait Duke       Festival, in April 2015 as this event
                • Conducted consultation with community            House and relocate building to the          previously occurred in Earl St.
                  stakeholders, State sporting body &              Earl St site.                           •   Reduction in graffiti offences through
                  cross-government agencies to determine       •   Working with Property and                   partnership, education and
                  a process to replace Cooran Sports               Contracts Branch in the preparation         development strategies.
                  Ground lights.                                   of a community tenure policy.           •   Negotiate expired leases on
                • Facilitated delivery of Graffiti Education   •   Preparation of discussion paper for         community halls, centres and sports
                  programs to 850 students in 5 Noosa              reduction of graffiti.                      complexes (pending community
                  Shire Schools utilising funding from Qld     •   Development online grant process in         tenure policy).
                  Safer Communities and Graffiti-Stop.             line with new grants policy.            •   Deliver Community Drought Support
                • Developed Get Ready for Storm Season         •   Update and improve Community                project.
                  awareness video for young people in              Development web information.            •   Next Community Grants Round
                  partnership with Noosa Flexi School.         •   Preparation of 2nd edition of Not for       Opens 16 Feb, Closes 31 March.
                • Prepared successful funding submission           Profit e-newsletter for release in
                  to Dept. Communities for Community               February 2015.
                  Drought Support ($40k).
                • Presented Social Procurement paper to
                  Leadership Team with agreement
                  reached to trial social procurement tender
                  for Cooroy Library Coffee Cart in Feb.
                • Review of Council Policy Community
                  Grants completed.
                • Contributed to negotiations for Noosa
                  Mens Shed to secure tenure over part of
                  Unity Water property at Girraween &
                  Pomona Mens Shed to secure tenure
                  over part of National Parks & Wildlife
                  property at Pomona & support for
                  hydrology planning from Plumbing
                  Services.
                • Inaugural Not for profit e-newsletter sent
                  to community organisations.



                                                                                Page 23 of 27

Section 24

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                         3 FEBRUARY 2015


SECTION         RECENT ACHIEVEMENTS                             CURRENT PRIORITIES                          LOOKING AHEAD
Libraries       • Successful summer school holiday              •   Development and drafting of the         •   Completion of Libraries Strategy.
                  program for children, young adults and            Libraries 5 year strategic plan.        •   Tender process for management of
                  families Total attendance: 706.               •   Annual off-site literary event –            Library Espresso at Cooroy Library.
                • Successful grant application, Noosa’s             author and Master Chef participant,     •   Further investigations on funding
                  War Front, for Queensland Anzac                   Amina Elshafei confirmed for 8              sources for target marketing and
                  Centenary. Total $14,481.                         March 2015 for International                possible delivery of Library
                • Successful grant application for Dollars          Women’s Day.                                independent eNews.
                  Making Sense which will assist adults to      •   Coordination and delivery of            •   Development of financial literacy
                  manage day-to-day finances and make               Noosa’s War Front grant project.            programs in consultation with
                  informed financial decisions. The             •   Secure an external financial literacy       successful literacy consultant and
                  program, was made possible through a              consultant for the recent successful        professional evaluator.
                  $46,000 Financial Literacy Australia              Dollars Making Sense grant.             •   Finalise new cleaning tender for next
                  grant.                                        •   Preparation for Fusion Festival             financial year.
                • Trialled new targeted eNews for the               (May) in partnership with Cooroy        •   Commence Best Start Literacy
                  school holiday program which had a                Lower Mill Board.                           program, funded through State
                  successful click rate of 4.3% compared to     •   Griffiths Negative Collection -             Library of Qld.
                  the Community eNews click rate of                 Volunteers trained and working on       •   Boilerhouse priority structural works
                  2.67%.                                            collection to assess, index and scan        to be undertaken.
                • Implemented staffing changes following            negatives. Over 1,500 images            •
                  population of structure.                          indexed and 155 images scanned.
                • Commissioned online payment option                Launch will be held on Feb 25th.
                  which increases Libraries capacity to offer   •   Development of new social media
                  fee based events.                                 channel – Instagram.
                • On target to meet 5% savings target from      •
                  Libraries Service Review.

                • Mill Place Boiler house structural
                  assessment complete.
                • Wallace Park Precinct 21st Birthday
                  celebrations well attended with very good
                  publicity.




                                                                                  Page 24 of 27

Section 25

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                   3 FEBRUARY 2015


SECTION          RECENT ACHIEVEMENTS                      CURRENT PRIORITIES                         LOOKING AHEAD
Butter Factory   • Completion of community consultation   •   Present Butter Factory Review to       •   Implement Butter Factory Review
                   phase of Butter Factory Review and         Council for their consideration.           recommendations.
                   development of potential options for   •   Public Programs: continuation of       •   Public programs and exhibitions
                   further review.                            guided tours and morning teas for          programmed through to 30 June
                 • Successful delivery of summer school       exhibiting artists. Family oriented        2015.
                   holiday programs for children.             art activities continue on a regular
                                                              basis.
                                                          •   Exhibition Openings – January 30
                                                              January 2015. Zest – an exhibition
                                                              by Sam Vatovey and Kym Angelique
                                                              Nelson. Local artists expressing
                                                              unique perspectives of the Noosa
                                                              and Sunshine Coast hinterland
                                                              landscape. Coastal Awareness by
                                                              Christ Postle. Guest speaker
                                                              Damien Massingham, CEO Tourism
                                                              Noosa.




                                                                           Page 25 of 27

Section 26

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                          3 FEBRUARY 2015


SECTION            RECENT ACHIEVEMENTS                           CURRENT PRIORITIES                          LOOKING AHEAD
Regional Gallery   • Successful delivery of summer school        •   Public Programs: continuation of        •   Two week maintenance program to
                     holiday programs for children.                  guided tours and morning teas for           audit and assess the current shelf
                   • Successful delivery of recent exhibitions       exhibiting artists. Family oriented         life of materials and equipment and
                     included: Rick and Yeats Gruin,                 art activities will continue on a           to reconfigure existing storage areas
                     Thousand Rolls of Batik.                        regular basis.                              to enable improved functionality.
                   • Major coup in securing Ah Xian’s            •   Currently showing: The winner of        •   Commence Floating Land
                     Metaphysica exhibition from GOMA which          the Noosa Regional Gallery                  preparation.
                     proved very popular with our audiences.         Travelling Scholarship Award, Ange      •   Resolve storage issues for corporate
                                                                     Leech and her Puppet Project                art collection
                                                                     alongside two Queensland artists
                                                                     Erica Gray Pipe Dreams and Joolie
                                                                     Gibbs Flood Language 2 with their
                                                                     contemporary take on the mundane
                                                                     aspects of everyday life and effects
                                                                     of climate change.
                                                                 •   Upcoming exhibitions: working with
                                                                     the Friends of the Gallery to develop
                                                                     their Taste of Art exhibition
                                                                     exclusively for their creative
                                                                     members.
                                                                 •   Finalisation of Gallery website.
                                                                 •   Develop new program concept for
                                                                     Floating Land 2015 following
                                                                     unsuccessful funding bid through
                                                                     Arts Qld.




                                                                                  Page 26 of 27

Section 27

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                              3 FEBRUARY 2015


Previous Council Consideration

Nil.

Finance & Risk

Broadly speaking all Branches within the Department are on budget for the first half of the
2014/15 financial year a number of budget variations have been presented to Council in 3rd
budget review for their consideration.

Consultation

External Consultation - Community & Stakeholder

Nil

Internal Consultation

Nil

Departments/Sections Consulted:

x      Community Services                       Planning & Infrastructure
       Disaster Management & Public Order       Building & Plumbing Services
       Waste & Environmental Health             DA Planning
       Community Facilities                     Strategic Land Use Planning
       Cultural Facilities                      Asset Design & Investigations
                                                Asset Planning
                                                Civil Operations
                                                Environment

       Executive Office                         Corporate Services
       Community Engagement                     Finance
       Customer Service                         ICT
       Executive Support                        Procurement & Fleet
       Governance                               Property & Facilities
       Human Resources                          Revenue Services




                                                                                    Page 27 of 27

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.