Skip to the record
Accept no substitutions.

Original source · versioned page text

2015-02-03 Infrastructure & Services Committee Agenda

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                           3 FEBRUARY 2015


COMMUNITY SERVICES DEPARTMENT

SECTION            RECENT ACHIEVEMENTS                            CURRENT PRIORITIES                         LOOKING AHEAD
Waste Management   • Developed an information pack on             •   Drafting of a new contract for the     •   Finalisation of the Waste Strategy.
                     options for the disposal of organic waste        sale of metal from the landfill.       •   The first payment of royalties from
                     for distribution to the Community Jury       •   Commencement of works to                   LMS for gas extraction due in
                   • Council approval of a waste services             construct a bio basin and to upgrade       February 2015.
                     policy that details minimum service levels       the HES basin at the landfill.         •   Tendering and implementation of
                     and other criteria for variation to waste    •   Conducting a risk assessment of            2015/16 Capital Works Program.
                     services.                                        barriers at the three waste transfer   •   Redevelopment of the entrance to
                   • Finalisation of a new contract for the           stations.                                  the Eumundi Rd waste facility and
                     crushing of concrete at the landfill.        •   Development of a draft 5 year              improvement to directional signage.
                   • Extension of the Licence Agreement for           capital works program.
                     Briteside Industries to operate the Tip      •   Development of the 2015/2016
                     Top shop at the landfill.                        Waste Management Budget.
                   • Production and distribution of a public      •   Provision of information to the
                     education DVD on home                            Community Jury.
                     composting/worm farming.                     •   Commencement of concrete
                   • Extension of the Garden Waste service to         crushing to provide material for the
                     rural areas of the Shire.                        redevelopment of the green waste
                   • Completion of a draft Planning Scheme            processing pad and the bio-basin.
                     Policy on Waste Management.
                   • Awarding of major capital works contracts
                     for construction of a biological control
                     basin to collect and treat nutrient rich
                     stormwater at the Eumundi Landfill.




                                                                                   Page 18 of 27
Log in to download the original file

2015-02-03 Infrastructure & Services Committee Agenda(PDF, 214KB).pdf · 219 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.