Council archive · source document
App C - Code Responses · RAL23/0009
Performance outcomes Acceptable outcomes Comments
appropriate to the site’s setting and intended
use.
PO11 No acceptable outcome provided Not Applicable
Roadway and pathway layout are predominantly Roadway and pathway are not proposed.
rectilinear with a high degree of permeability.
Editor’s Note— Further detail on traffic and the
road network is addressed in Part 9.4.8
Transport Code
Infrastructure and services Table 9.5.1.3 Criteria for assessment (part)
Performance outcomes Acceptable outcomes Comments
Growth Management
Infrastructure and services
PO12 AO12.1 Complies
New lots are located, sized and configured so as All lots are connected to power supply and The existing buildings are provided with all
to ensure each lot is capable of being serviced telecommunications services and where necessary infrastructure which will be
by appropriate levels of infrastructure including: located within the Urban boundaries, power retained.
supply and communications infrastructure are
a) power supply; provided underground.
b) telecommunications; and AO12.2 Not Applicable
c) where within Local Plan Areas If located in a water service area each new lot
d) reticulated water supply; can be connected to Unitywater’s water supply
e) reticulated sewerage; and network.
f) stormwater drainage.
AO12.3 Not Applicable
If located in a sewerage service area each new
lot can be connected to Unitywater’s sewerage
network.
7 & 55 Happy Jack Creek Rd, Ridgewood Reconfiguring a Lot Code – Noose Shire Planning Scheme 2020 Page 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
App C - Code Responses.pdfRelated documentApplication case desk ↗
About this file
- File size
- 354 KB (small file)
- File type
No other editions are linked here.