Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

App C - Code Responses · RAL23/0009

of 55

Text shows just the words. Original shows the document exactly as it was published.

 Performance outcomes                                   Acceptable outcomes                                    Comments
 appropriate to the site’s setting and intended
 use.
 PO11                                                   No acceptable outcome provided                         Not Applicable
 Roadway and pathway layout are predominantly                                                                  Roadway and pathway are not proposed.
 rectilinear with a high degree of permeability.

 Editor’s Note— Further detail on traffic and the
 road network is addressed in Part 9.4.8
 Transport Code


Infrastructure and services Table 9.5.1.3 Criteria for assessment (part)

 Performance outcomes                                   Acceptable outcomes                                    Comments
 Growth Management
 Infrastructure and services
 PO12                                                   AO12.1                                                 Complies
 New lots are located, sized and configured so as       All lots are connected to power supply and             The existing buildings are provided with all
 to ensure each lot is capable of being serviced        telecommunications services and where                  necessary infrastructure which will be
 by appropriate levels of infrastructure including:     located within the Urban boundaries, power             retained.
                                                        supply and communications infrastructure are
     a)   power supply;                                 provided underground.
     b)   telecommunications; and                       AO12.2                                                 Not Applicable
     c)   where within Local Plan Areas                 If located in a water service area each new lot
     d)   reticulated water supply;                     can be connected to Unitywater’s water supply
     e)   reticulated sewerage; and                     network.
     f)   stormwater drainage.
                                                        AO12.3                                                 Not Applicable
                                                        If located in a sewerage service area each new
                                                        lot can be connected to Unitywater’s sewerage
                                                        network.




7 & 55 Happy Jack Creek Rd, Ridgewood                 Reconfiguring a Lot Code – Noose Shire Planning Scheme 2020                                    Page 10

Used in these records

About this file

File size
354 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

App C - Code Responses.pdf · 354 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.