Skip to the record
For the highest quality transcripts.

Council archive · source document

App C - Code Responses · RAL23/0009

of 55

Text shows just the words. Original shows the document exactly as it was published.

 Performance outcomes                              Acceptable outcomes                                  Comments
        performance of waterways and flood
        plain; and
     c) development integrates with the natural
        landform rather than modifying the
        landform to suit the development as far
        as practicable.
 PO4                                               AO4.1                                                Not Applicable
 For reconfiguring a lot, development does not     Development provides an effective evacuation         Not required as there will be no changes to the
 compromise the safety of people resulting from    route that remains passable, with sufficient         existing buildings.
 the flood risk associated with events exceeding   flood warning time, to enable people to
 the DFE.                                          progressively evacuate to safe areas above
                                                   the PMF in the face of advancing flood or
                                                   waters for events that exceed the DFE.

                                                   OR
                                                   AO4.2                                                Not Applicable
                                                   Development provides for an area of sufficient       Not required as there will be no changes to the
                                                   size    and     dimensions      on site above        existing buildings.
                                                   the PMF that allows for safe congregation and
                                                   refuge.
                                                   AO4.3                                                Not Applicable
                                                   Where the existing roads servicing a                 Not required as the existing access to the
                                                   development provide a specific flood immunity        buildings will be unchanged.
                                                   (as determined by the Qld Transport Road and
                                                   Drainage Design Manual, Queensland Urban
                                                   Drainage Manual and the Australian Rainfall
                                                   and Runoff Guide), all lots have access to the
                                                   flood free area identified in Table 8.2.6.5 that
                                                   matches the road immunity.
 PO5                                               AO5                                                  Complies
 For reconfiguring a lot or operational works,     In the Flood Hazard Overlay, or in areas
 development does not directly, indirectly or      otherwise determined to be subject to



7 & 55 Happy Jack Creek Rd, Ridgewood          Flood Hazard Overlay Code – Noose Shire Planning Scheme 2020                                       Page 2

Used in these records

About this file

File size
354 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

App C - Code Responses.pdf · 354 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.