36. Each individual water connection to the water reticulation system shall extend to the property
boundary and be metered. All fees for the supply of water meters shall be paid to the
Council.
37. All water meters must be located outside the property boundary and in an easily assessable
location to facilitate unhindered reading by Council and/or Council’s contracted water meter
readers, and not behind fences or locked gates. In this regard approval of the water meter
configuration and location must be obtained from Council’s Sunshine Coast Water - Capital
Works Manager prior to lodgement and approval of hydraulic drawings.
38. Any building or structure within proximity of any underground public utility must have its
foundations designed so that no surcharge loads are imposed upon such underground
infrastructure. Foundations must be taken down a minimum of 1.0m below a line of
influence measured 1.0m in the direction of the foundation from the centreline of the closest
underground service and along the natural angle of repose of the foundation soil type(s) and
shall be designed by a registered practicing Geotechnical Engineer.
Site Stability and Earthworks
39. A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site,
determine the soil classification, establish whether any measures are required to protect the
stability of adjoining buildings and/or structures and/or land, and make recommendations on
the type of foundation system(s) best suited for the proposed development. The
recommendations of this report shall be incorporated into the design and construction of the
proposed development.
40. Earthworks carried out on site shall not affect the structural integrity of any of the existing
fences or structures that border the development site. Fences that are affected shall be
replaced prior to the Building Certifier issuing the Certificate of Classification.
Erosion and Sediment Control
41. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard, plans detailing the methods of controlling erosion and sediment in accordance
with the Healthy Waterways document and fact sheet series titled Controlling Stormwater
Pollution on your Building Site dated 2006 are required to be submitted with the application
for a Building Works Permit.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Not applicable
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
Drawing Number Rev. Plan - Prepared by Date
1 B Site Plan – Macchia Pty Ltd 10 June 2009
2 B Ground Floor Plan – Macchia Pty Ltd 10 June 2009
3 B First Floor Plan – Macchia Pty Ltd 10 June 2009
Page 6 of 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Decision Notice - 010.2009.00000879.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 69 KB (small file)
- File type
No other editions are linked here.