     139 EUMUNDI NOOSA ROAD & 30
LIONEL DONOVAN DRIVE, NOOSAVILLE
        STORMWATER MANAGEMENT PLAN


[OCR of page images]
 

lUCel Tg

139 EUMUNDI NOOSA ROAD & 30
LIONEL DONOVAN DRIVE, NOOSAVILLE

STORMWATER MANAGEMENT PLAN

 
Full text of the other 91 pages

Page 2

Page 3

Hyder Consulting Pty Ltd
ABN 76 104 485 289
Level 7, 199 Grey Street

South Brisb: QLD 4101
pastel Hyder

Tel: +61 7 3337 0000
Fax: +61 7 3337 0050
www.hyderconsulting.com

EMPIRICA DEVELOPMENTS PTY LTD

139 EUMUNDI NOOSA ROAD & 30 LIONEL
DONOVAN DRIVE, NOOSAVILLE SERVICE
STATION AND RETAIL SITE

Stormwater Management Plan

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Date Rev | Description Author Reviewed Approved
28/11/14 01 Draft Submission Kate Francis Graham Coles | Graham Coles
03/12/14 02 Submission Kate Francis Graham Coles | Graham Coles
16/12/14 03 Submission Kate Francis Graham Coles | Graham Coles
06/03/15 04 Submission Kate Francis Graham Coles | Graham Coles
30/03/15 05 Submission Kate Francis Graham Coles | Graham Coles
11/11/15 06 Submission Kate Francis Graham Coles | Graham Coles
16/11/15 07 Submission Kate Francis Graham Coles | Graham Coles
20/11/15 08 Submission Kate Francis Graham Coles | Graham Coles
Larissa Hughes | Graham Coles core een
14/03/17 09 Submission 5 A ll
Se an Mra
Report No F0002-AA007595-AAR-09
Date 14 March, 2017

This report has been prepared for Empirica
Developments Pty Ltd in accordance with the
terms and conditions of appointment for 139
Eumundi Noosa Road, Noosaville, dated October
2014. Hyder Consulting Pty Ltd (ABN 76 104 485
289) cannot accept any responsibility for any use
of or reliance on the contents of this report by any
third party.

 

 

139 Eumundi Noosa Road & 30 Lionel Donovan Drive, Noosaville Service Station and Retail Site—Stormwater
Management Plans

Hyder Consulting Pty Ltd-ABN 76 104 485 289

f:\aa007595\f-reports\f0002-aar-aa007595 sbswmp report\f0002-aa007595-aar-05-smp.docx

Page 4

Page 5

CONTENTS

           EXECUTIVE SUMMARY............................................................................................................... 1
           SITE CHARACTERISTICS.................................................................................................................. 2
                    Site Description ........................................................................................................................................ 2
                    Existing Topography and Stormwater Infrastructure ............................................................................... 3
                    Drainage Easements ................................................................................................................................ 3
           PROPOSED DEVELOPMENT ............................................................................................................ 4
                    Proposed Internal Drainage Pattern ........................................................................................................ 4
                    External Catchments ................................................................................................................................ 4
               Flood Assessment.......................................................................................................................................... 4
           INTERNAL CATCHMENT ASSESSMENT ......................................................................................... 5
                    Temporal Patterns ................................................................................................................................... 5
                    Legal Point of Discharge .......................................................................................................................... 5
                    CATCHMENTS ........................................................................................................................................ 5
                    Catchment 1 DISCHARGE ...................................................................................................................... 5
                    Catchment 2 DISCHARGE ...................................................................................................................... 6
                    CATCHMENT 3 DISCHARGE ................................................................................................................. 6
           STORMWATER QUANTITY, DETENTION & HYDRAULICS ........................................................... 8
                    Objectives ................................................................................................................................................ 8
           STORMWATER QUALITY .......................................................................................................... 10
                    Existing Water Quality ..................................................................................................................... 10
                    Water Quality Environmental Values and Water Quality Objectives (WQO) ........................................ 10
                    Proposed Stormwater Improvement Devices ........................................................................................ 10
                    BIO RETENTION Basins ....................................................................................................................... 11
                    Modelling of the Development Site (MUSIC) ......................................................................................... 12
           CONCLUSION ............................................................................................................................. 16




139 Eumundi Noosa Road & 30 Lionel Donovan Drive, Noosaville Service Station and Retail Site—Stormwater
Management Plans
Hyder Consulting Pty Ltd-ABN 76 104 485 289                                                                                                                                         i
f:\aa007595\f-reports\f0002-aar-aa007595      sbswmp      report\f0002-aa007595-aar-04.-smp.docx

Page 6

APPENDICES

APPENDIX A   ARCHITECTURAL AND SURVEY PLANS

APPENDIX B   ENGINEERING DRAWINGS

APPENDIX C   FLOOD MAPS

APPENDIX D   SITE SPECIFIC IFD CHARTS

APPENDIX E   RATIONAL METHOD CALCULATIONS

APPENDIX F   XP RAFTS HYDROGRAPHS

APPENDIX G   MUSIC MODELLING LAYOUT AND RESULTS

APPENDIX H   NOOSA COUNCIL STORMWATER CODE COMPLIANCE

APPENDIX I   EROSION AND SEDIMENT CONTROL CHECKLIST

APPENDIX J   SPEL EUMUNDI SERVO PURACEPTOR RISK ASSESSMENT




                                                                               Stormwater Management Plans
Page ii                                                          Hyder Consulting Pty Ltd-ABN 76 104 485 289
                          f:\aa007595\f-reports\f0002-aar-aa007595   sbswmp   report\f0002-aa007595-aar-04.-smp.docx

Page 7

                  EXECUTIVE SUMMARY
                  Hyder Consulting has been engaged by Empirica Developments Pty Ltd to prepare a Site Based
                  Stormwater Management Plan (SBSMP) for the proposed service station and industrial retail
                  development located at 139 Eumundi Noosa Road and 30 Lionel Donovan Drive, Noosaville.
                  This site already has Material Change of Use approval (Council Reference MCU14/0102.02)
                  which allows for the construction of a service station dining/ entertainment retailer, and industrial
                  retailers on site. This application is in relation to a further Reconfiguration of Lot application, to
                  realign the existing site boundaries as per the survey plans provided in Appendix A.

                  This Stormwater Management Plan has been prepared in accordance with the Water
                  Sensitive Urban Design requirements of Council, the Queensland State Planning Policy, the
                  Queensland Development Code, and the Environmental Protection (Water) Policy (1997).

                  The three primary objectives of this SBSMP are to ensure that:

                  1. Suitable measures are incorporated in the development to ensure that there are no adverse
                     impacts to downstream receiving waterways, properExecutive Summty or infrastructure
                     resulting from any increase to peak discharging stormwater flow rates.

                  2. Investigate any potential flood issues affecting the site and set appropriate finished levels
                     for the proposed development to ensure adequate flood immunity is achieved.

                  3. Details of a proposed stormwater quality treatment train are provided to ensure the
                     discharge of stormwater from the site is of adequate quality standards to comply with the
                     Water Sensitive Urban Design (WSUD) requirements of Noosa Council, the State Planning
                     Policy and the South-East Queensland Healthy Waterways Partnership.

                  The aim of this report is to address all the relevant issues by providing stormwater quantity and
                  stormwater quality information to support the development application.




139 Eumundi Noosa Road & 30 Lionel Donovan Drive, Noosaville Service Station and Retail Site—Stormwater
Management Plans
Hyder Consulting Pty Ltd-ABN 76 104 485 289                                                                           1
f:\aa007595\f-reports\f0002-aar-aa007595   sbswmp   report\f0002-aa007595-aar-04.-smp.docx

Page 8

         SITE CHARACTERISTICS
         SITE DESCRIPTION
         The proposed development site is located in Noosaville within the Local Government Area of
         Noosa Council on the Sunshine Coast. The site is bordered by a roundabout and Walter Hay
         Drive to the north, a vacant lot to the east, Lionel Donovan Drive and a car dealership to the
         south and Eumundi Noosa Road to the west. Figure 2.1 below provides a site locality plan:




                            139 Eumundi Noosa Road Site




                                                                              31SP170751


                                                      4SP159610




                                                                     30 Lionel Donovan Drive Site


                           Figure 2.1 Site Locality Plan (Source: Nearmap 2014)

         The site falls within the jurisdiction of the Noosa Council, and under the Noosaville Zone Map
         ZM8 is zoned as “Industry” use.

         PROPERTY DESCRIPTION
         The development is proposed to be undertaken within the following parcel of land designated
         as:

                  Lot 4 on SP159610 (139 Eumundi Noosa Road, Noosaville)
                  Lot 31 on SP170751 (30 Lionel Donovan Drive, Noosaville)

         TOTAL AREA OF LAND
                  The total area of Lot 4 on SP159610 is 0.42 Ha
                  The total area of Lot 31 on SP170751 is 0.36 Ha
                  The total proposed area for development is 0.78 Ha




                                                                                              Stormwater Management Plans
Page 2                                                                          Hyder Consulting Pty Ltd-ABN 76 104 485 289
                                         f:\aa007595\f-reports\f0002-aar-aa007595   sbswmp   report\f0002-aa007595-aar-04.-smp.docx

Page 9

                  EXISTING TOPOGRAPHY AND STORMWATER
                  INFRASTRUCTURE
                  Skyline Surveyor’s survey indicates that the site has a moderate grade (approximately 3%),
                  ranging from approximately RL10.57 in the site’s southwest corner to RL7.54 in the site’s north-
                  east corner. The site generally grades in a north eastern direction.
                  There is a ridgeline located along the boundary of the two lots proposed for development. This
                  has occurred because the site on Lot 4SP159610 has been excavated below natural surface in
                  the southern area of the site, and as a result there are extensive retaining walls around
                  southern boundary. The construction of Walter Hay Drive on the site’s northern boundary has
                  caused a trapped sag to occur which has led to the installation of piped drainage discharge to
                  the site’s east.


                   DRAINAGE EASEMENTS
                  There are two existing drainage easements on the site. One runs along the northern section of
                  Lot 31SP170751 and another in the south – western corner of the same lot. In the developed
                  state, these easements will be dissolved.




139 Eumundi Noosa Road & 30 Lionel Donovan Drive, Noosaville Service Station and Retail Site—Stormwater
Management Plans
Hyder Consulting Pty Ltd-ABN 76 104 485 289                                                                       3
f:\aa007595\f-reports\f0002-aar-aa007595   sbswmp   report\f0002-aa007595-aar-04.-smp.docx

Page 10

         PROPOSED DEVELOPMENT
         This application addresses the reconfiguration of lot component of the development. It is proposed
         that two lots will be created through this development. The proposed Lot 1 (generally in the
         location of existing Lot 31 SP170751) will have a site area of 0.53 Ha. The proposed Lot 2
         (generally in the location of existing Lot 4 SP159610) will have a site area of 0.25 Ha.

         This development currently has approval for the following uses:
             – Retail Business Type 5 – Vehicle Uses (service station);
             – Retail Business Type 2 – Shop & Salon (shop within service station);
             – Industrial Business Type 2 – Production, Alteration, Repackaging & Repairing;
             – Industrial Business Type 1 – Warehouse;
             – Retail Business Type 6 – Hardware Store; and
             – Entertainment and Dining Business Type 1 – Food & Beverages (restaurant/café).
         Landscaping and 63 car parks and 8 motorcycle spaces will also be provided as part of this
         development. Dual access is proposed to the overall site through a left in, left out access from
         Eumundi Noosa Road, and access from Lionel Donovan Drive.

         Access easements, as well as easements for stormwater and sewer services will be provided as
         part of these works. Refer to the survey plan and proposed plans included in Appendix B.


         PROPOSED INTERNAL DRAINAGE PATTERN
         As much as practicably possible the proposed development will maintain and/or improve the
         functionality of the existing drainage pattern. Cut and fill earthworks are proposed across the
         site to generally bring the levels of Lot 31 into line with Lot 4. However, these works are not of a
         significant volume nor do they alter the stormwater runoff regime.


         EXTERNAL CATCHMENTS
         The site is not subject to any external catchments.


         FLOOD ASSESSMENT
         Noosa Council provides River and Storm Tide Flood Maps to assess whether the site will be
         affected by flooding. The proposed development site is not within the flood line for either River
         or Storm flooding. The flood maps can be found in Appendix C.




                                                                                               Stormwater Management Plans
Page 4                                                                           Hyder Consulting Pty Ltd-ABN 76 104 485 289
                                          f:\aa007595\f-reports\f0002-aar-aa007595   sbswmp   report\f0002-aa007595-aar-04.-smp.docx

Page 11

                  INTERNAL CATCHMENT ASSESSMENT
                  TEMPORAL PATTERNS
                  Rainfall data and information from the Australian Bureau of Meteorology was utilised to
                  generate the design storm event hydrographs for the stormwater run-off. Intensity-Frequency-
                  Distribution (IFD) charts and tables for the specific subject site are presented in Appendix D.


                  LEGAL POINT OF DISCHARGE
                  The subject site currently contains three internal catchments which discharge flows into three
                  separate locations.

                        - At the southern border of the site, there is a 600mmx600mm field inlet pit, which collects
                          flows and discharges to a 300mm diameter stormwater pipe within the Lionel Donovan
                          Drive road reserve.

                        - There are two field inlets located within the kerb and channel along Eumundi Noosa
                          Road, which collect flows from Lot 4SP159610. These pits discharge into a 675mm
                          diameter pipe within the Eumundi Noosa Road road reserve. These pipes flow to the
                          north toward Lake Doonella and the Noosa River.

                        - There is also a 225mm diameter pipe within the existing drainage easement of Lot
                          31SP170751. This then increases to a 300mm diameter stormwater pipe in the adjacent
                          lot to the east. At the junction of these pipes is a 600mmx900mm field inlet, which collects
                          overland flow from Lot 31SP10751.

                  The internal catchments are illustrated in the engineering drawings in Appendix B.


                   CATCHMENTS
                  The site has three internal catchments. Details of these catchments are provided in Hyder
                  Drawings SK01300-AA007595-01.


                   CATCHMENT 1 DISCHARGE
                  Catchment 1 is a small internal catchment at the south of Lot 4 on SP159610. In its existing
                  state, the catchment area is used for commercial and automative purposes.
                  Table 4.1, below, lists the catchment characteristics for the site.
                                                    Table 4.1 – Peak discharge flow rates comparison

                              PARAMETERS                                      EXISTING                 DEVELOPED

                       Approx. Developed Area                                     0.10                      0.09

                           Fraction Impervious                                    0.85                      0.85

                      Coefficient of Runoff (C10)                                 0.87                      0.87

                      Coefficient of Runoff (C50)                                   1                        1

                         Time of Concentration                                5 minutes                   5 minutes

139 Eumundi Noosa Road & 30 Lionel Donovan Drive, Noosaville Service Station and Retail Site—Stormwater
Management Plans
Hyder Consulting Pty Ltd-ABN 76 104 485 289                                                                           5
f:\aa007595\f-reports\f0002-aar-aa007595   sbswmp   report\f0002-aa007595-aar-04.-smp.docx

Page 12

         A comparison of the parameters listed in Table 4.1 demonstrates that the proposed
         development will not increase the rate of stormwater runoff discharged from the site as the
         proposed development does not change the existing impervious area and stormwater runoff
         volumes. Therefore, no onsite detention is required to mitigate peak discharge flow rates.
         Stormwater runoff from the proposed development site can be discharged directly to the lawful
         point of discharge, which for Catchment 1 is Lionel Donovan Drive.


         CATCHMENT 2 DISCHARGE
         Catchment 2 is an internal catchment on Lot 4 on SP159610. In its existing state, the catchment
         area is used for retail and automative purposes.
         Table 4.2, below, lists the catchment characteristics for the site.
                                 Table 4.2 – Peak discharge flow rates comparision

                 PARAMETERS                               EXISTING                                   DEVELOPED

            Approx. Developed Area                            0.26                                         0.23

               Fraction Impervious                              1                                           0.9

            Coefficient of Runoff (C10)                        0.9                                         0.88

            Coefficient of Runoff (C50)                        1.0                                          1.0

              Time of Concentration                       5 minutes                                    5 minutes


         A comparison of the parameters listed in Table 4.2, above, demonstrates that the proposed
         development will not increase the rate of stormwater runoff discharged from the site as the
         proposed development does not change the existing impervious area and stormwater runoff
         volumes. Therefore, no onsite detention is required to mitigate peak discharge flow rates.
         Stormwater runoff from the proposed development site can be discharged directly to the lawful
         point of discharge, which for Catchment 2 is Eumundi Noosa Road.


         CATCHMENT 3 DISCHARGE
         Catchment 3 is an internal catchment that covers all of Lot 31SP170751. In its existing state, the
         site is undeveloped.

         CATCHMENT PARAMETERS
         A summary of the catchment parameters is presented in Table 4.3.

         Table 4.3: Summary of Catchment Areas
                 PARAMETERS                               EXISTING                                   DEVELOPED

            Approx. Developed Area                            0.42                                         0.47

               Fraction Impervious                             0.1                                         0.90

            Coefficient of Runoff (C10)                       0.72                                         0.89

            Coefficient of Runoff (C50)                       0.83                                         1.00

              Time of Concentration                     17.7 minutes                                   5 minutes


                                                                                                Stormwater Management Plans
Page 6                                                                            Hyder Consulting Pty Ltd-ABN 76 104 485 289
                                           f:\aa007595\f-reports\f0002-aar-aa007595   sbswmp   report\f0002-aa007595-aar-04.-smp.docx

Page 13

                  Detailed catchment plans and assessments are also provided in Appendix B.

                  RATIONAL METHOD CALCULATIONS
                  In the existing case analysis the time of concentration for the above catchment 3 areas have
                  been derived with the use of the Friends Sheet Flow Equation in accordance with the
                  Queensland Urban Drainage Manual (QUDM Equation 4.5) and Argue’s Flow travel time in
                  pipes and channels (QUDM Section 4.6.7). These equations require parameters including the
                  total length of the flow path, slope and surface roughness/channel type.

                  In the developed case analysis a combined application of standard inlet time for industrial areas
                  has been employed to determine the time of concentration (QUDM Sections 4.6.5 and 4.6.7).

                  The Coefficient of Runoff was determined using QUDM Tables 4.05.3a & 4.05.3b.

                  The rational method, as prescribed by QUDM Section 4.03 was then used to determine
                  discharging flow rates for standard average return intervals (ARI’s) of 1, 2, 5, 10, 20, 50 and 100
                  years. Detailed Rational Method calculation results are attached in Appendix E.

                  XP-RAFTS
                  XP-RAFTS is a computer based program which generates detailed event hydrographs for
                  specified storm events. XP-RAFTS was used to determine the critical storm duration for a range
                  of standard recurrence interval storm events for all catchments. Detailed catchment parameters
                  are used by XP-RAFTS including manning’s values, vectored slope of the site and percentage
                  impervious.

                  The results of the Rational Method calculations were employed as a basis for calibration and
                  verification of the development of hydrologic models for each of the included catchment areas.
                  Presented below is a summary of the peak discharge flow rates for all ARI’s calculated using
                  XP-RAFTS.

                  Table 4.3.4: Peak Discharge Flow Rates – XP-RAFTS
                         Storm Event                          Existing                       Developed    Difference (%)

                               1 in 1                           0.039                          0.161
                                                                                                              +313%

                               1 in 2                           0.054                          0.206          +281%

                               1 in 5                           0.076                          0.239          +214%

                              1 in 10                           0.094                          0.269          +186%

                              1 in 20                           0.117                          0.311          +166%

                              1 in 50                           0.135                          0.342
                                                                                                              +153%

                             1 in 100                           0.155                          0.408
                                                                                                              +163%




139 Eumundi Noosa Road & 30 Lionel Donovan Drive, Noosaville Service Station and Retail Site—Stormwater
Management Plans
Hyder Consulting Pty Ltd-ABN 76 104 485 289                                                                                7
f:\aa007595\f-reports\f0002-aar-aa007595   sbswmp   report\f0002-aa007595-aar-04.-smp.docx

Page 14

         STORMWATER QUANTITY, DETENTION &
         HYDRAULICS
         OBJECTIVES
         The stormwater discharge from the proposed development shall maintain the pre-developed
         flow rates for all storm events, from the 1 in 1 year (frequent flow) to 1 in 100 year (major storm
         events).

         The stormwater management strategy will also need to comply with the Noosa Council
         Stormwater Management Code.

         METHODOLOGY
         A hydrologic model was created using XP-RAFTS. The model was calibrated and verified via a
         comparison to the results of the Rational Method calculations (described in Section 4.5). The
         critical storm event for each standard ARI was determined via an investigation of storm
         durations ranging from 10mins to 720mins. The model was then used to route post-
         development runoff through detention structures to determine adequate detention size to
         comply with the objectives. The model was iteratively optimised to achieve the most efficient
         design dimensions.

         The required detention volume is proposed to be included as an additional structure as a
         detention tank, which will collect minor flows from the proposed bioretention basin and overland
         major flows. The outlet pipe sizes have also been individually designed according to the
         required discharge flow rates and receiving system.

5.1.1    MODEL CONDITIONS
         Three hydrologic conditions were modelled as shown below.

         Case 1 - Existing Scenario
         Case 2 - Developed Scenario
         Case 3 - Mitigated (Developed with Detention Scenario)

5.1.2    DETENTION TANK DESIGN
         Table 5.1 presents the design details of the proposed detention tank which is required to
         achieve the waterway stability management objectives. The tank design has been iteratively
         optimised to ensure peak performance.

         It has been determined that due to the increase in impervious area, that the site requires
         stormwater quantity controls to mitigate flows. A detention tank has therefore been proposed to
         mitigate this consequent increase in peak discharge resulting from the development.

         The proposed lot layout incorporates the proposed basin area listed in Table 5.1.




                                                                                               Stormwater Management Plans
Page 8                                                                           Hyder Consulting Pty Ltd-ABN 76 104 485 289
                                          f:\aa007595\f-reports\f0002-aar-aa007595   sbswmp   report\f0002-aa007595-aar-04.-smp.docx

Page 15

                  Table 5.1: Stormwater Detention Basin Summary
                                           Parameter

                                     Base Dimensions                                                     12m x 18m

                                             Depth                                                        1.25m

                                      Storage Volume                                                      245 m 3

                                     Outlet Arrangement

                                      Low Flow Outlet                              150mm diameter orifice at the base of the Tank


                                     High Flow Outlet                            225mm diameter orifice at 800mm above the base
                                                                                                  of the Tank
                  The detention tank parameters listed in Table 5.1 were calculated using XPRafts. An iterative
                  method was used to adjust the parameters until the catchment flows were reduced to the
                  predevelopment flows. Hydrographs relating to the detention tanks, including basin storage
                  volume, have been included in Appendix F.

5.1.3             MODEL RESULTS
                  The discharge rate at each discharge point is tabulated below for the existing, developed and
                  mitigated scenarios. This table shows that the proposed detention tank is successful in
                  mitigating the developed discharge back to existing rate for all of the ARI storm events.

                  Table 5.2: Stormwater Discharge Rates
                                             Existing             Developed                  Mitigated      Impact
                          ARI                Scenario              Scenario                  Scenario         (%)


                      Q1 (m3/s)                0.039                  0.161                   0.039           0%

                      Q2 (m3/s)                0.054                  0.206                   0.046          -15%
                      Q5 (m3/s)                0.076                  0.239                   0.056          -26%
                     Q10 (m3/s)                0.094                  0.269                   0.073          -22%
                     Q20 (m3/s)                0.117                  0.311                   0.110          -6%
                     Q50 (m3/s)                0.135                  0.342                   0.131          -3%

                    Q100 (m3/s)                0.155                  0.408                   0.150          -3%




139 Eumundi Noosa Road & 30 Lionel Donovan Drive, Noosaville Service Station and Retail Site—Stormwater
Management Plans
Hyder Consulting Pty Ltd-ABN 76 104 485 289                                                                                         9
f:\aa007595\f-reports\f0002-aar-aa007595   sbswmp   report\f0002-aa007595-aar-04.-smp.docx

Page 16

          STORMWATER QUALITY
          EXISTING WATER QUALITY
          No stormwater quality control measures have been incorporated into the existing site drainage
          infrastructure.


          WATER QUALITY ENVIRONMENTAL VALUES
          AND WATER QUALITY OBJECTIVES (WQO)
          The subject site is located within the region of South East Queensland and as such the
          Department of Environment and Heritage Protection has specified Environmental Values and
          Water Quality Objectives for the management of stormwater quality in this region under
          Schedule 1 of the Environmental Protection (Water) Policy 2009. This document stipulates that
          stormwater design objectives for industrial developments are to be as per the ‘Urban
          Stormwater Quality Planning Guidelines 2010.’ This document provides specified design
          objectives for both the construction and operational phases of the development in accordance
          with landscape features and the regional location of the proposed development.

          As per the ‘Urban Stormwater Quality Planning Guidelines 2010’, the identified Water Quality
          Objectives for South East Queensland are defined as:

          Table 6.1: Design Objectives for Management of Stormwater Quality in South East Queensland
          – Operational (Post-Construction) Phase of Development
           Pollutant                          Minimum reductions in mean annual loads from
                                              unmitigated development (%)

           Total Suspended Solids (TSS)                                                80

           Total Phosphorus (TP)                                                       60

           Total Nitrogen (TN)                                                         45

           Gross Pollutants > 5mm                                                      90




          PROPOSED STORMWATER IMPROVEMENT
          DEVICES
          Water Sensitive Urban Design (WSUD) aims to minimise the impact of a development on the
          natural water cycle by reducing the export of pollutants, sediments and nutrients from the site
          into the natural watercourse. In order to treat the stormwater runoff from the site, various
          treatment devices can be used throughout the development area and these concepts can be
          integrated into the overall design of the road layouts, road cross sections, stormwater layouts
          and water supply reticulation systems. Stormwater from the development will follow a specially
          designed stormwater quality treatment train prior to discharge from the site, which will ensure
          compliance with the water quality objectives.




                                                                                              Stormwater Management Plans
Page 10                                                                         Hyder Consulting Pty Ltd-ABN 76 104 485 289
                                         f:\aa007595\f-reports\f0002-aar-aa007595   sbswmp   report\f0002-aa007595-aar-04.-smp.docx

Page 17

                   BIO RETENTION BASINS
                  A bio-retention area is a vegetated region where runoff is filtered through a filter media layer
                  (e.g. sandy loam) as it percolates downwards to receiving underlying reticulation. Specific
                  vegetation is to be incorporated into the landscaping of bio-retention areas which effectively
                  reduce nutrient loads. Table 20 in the Water By Design Bioretention Technical Design
                  Guidelines provides guidance on selecting appropriate plant species for systems where the
                  plants have a functional role in stormwater treatment, such as the aforementioned bio-retention
                  basins. The landscape architect is to select plant species from this table for the vegetation of the
                  basin. The following plant species are suggested:

                             Carex appressa;
                             Gahnia sieberiana;
                             Lomandra hystrix;
                             Pennisetum alopecuroides;
                             Callistemon sieberi; and / or
                             Leptospermum liversidgei.

                  Bio-retention areas are to be incorporated within each of the three catchments in the proposed
                  development with both a sediment forebay and planted bio-retention filter area. The sediment
                  forebay is to mitigate the accumulation of coarse sediment near the basin inflow, which will
                  smother vegetation and reduce infiltration. The bio-retention basin is to be incorporated into the
                  base of the stormwater detention structure; the lower 300mm of the basin has been excluded
                  from the stormwater detention analysis of the basin and is to be dedicated to extended
                  detention, ensuring that sufficient volume from frequent storm events will pond in the basin and
                  percolate through the filter media receiving treatment.
                  A typical example of a bio-retention area in operation with suitable vegetation is presented in
                  Figure 6.1 below. A typical section is also presented in Figure 6.2.




                  Figure 6.1: Newly Constructed Bio-Retention Area (Salacia Waters, Paradise Point)




139 Eumundi Noosa Road & 30 Lionel Donovan Drive, Noosaville Service Station and Retail Site—Stormwater
Management Plans
Hyder Consulting Pty Ltd-ABN 76 104 485 289                                                                        11
f:\aa007595\f-reports\f0002-aar-aa007595   sbswmp   report\f0002-aa007595-aar-04.-smp.docx

Page 18

          Figure 6.2: Bio-Retention Basin Typical Cross-Section (courtesy of Healthy Waterways)


          MODELLING OF THE DEVELOPMENT SITE
          (MUSIC)
          Modelling of the site was undertaken using the ‘Model for Urban Stormwater Improvement
          Conceptualisation (MUSIC)’ as promoted by the Noosa Council and the South East Queensland
          Healthy Waterways Partnership. The development was modelled using the split catchment
          approach. An appropriate type of land use was applied to all surface types within the developed
          catchments; with individual treatment devices assigned the relevant modelling treatment
          parameters. Consequently, a treatment train was established for each catchment, ensuring that
          all water discharging from site adheres to the specified Water Quality Objectives.

          Meteorological data for input into MUSIC was obtained for the Cooroy Composite Station (station
          number 40059) from the Bureau of Meteorology. Six minute time step rainfall data was
          obtained for the climate period from 1/1/1973 to 31/12/1983. The catchment parameters of the
          MUSIC modelling are specified within the South East Queensland Healthy Waterways
          Partnerships’ Water by Design MUSIC Modelling Guidelines for South East Queensland Version
          1 (2010), and have been modelled as such.

          POLLUTANT SOURCE NODE DETAILS
          Tables 6.2 and 6.3 show the pollutant source node parameters input into the MUSIC model.
          These parameters have been utilised in accordance with the South East Queensland Healthy
          Waterways Partnerships’ Water by Design MUSIC Modelling Guidelines for South East
          Queensland Version 1 (2010).

          Table 6.2: Rainfall – Runoff Parameters
           Storage Capacity (mm/day)                         18
           Initial Storage (%)                               10
           Field Capacity (mm)                               80
           Initial Depth (mm)                                50
           Daily Recharge Rate (%)                            0
           Daily Baseflow Rate (%)                           31


                                                                                               Stormwater Management Plans
Page 12                                                                          Hyder Consulting Pty Ltd-ABN 76 104 485 289
                                          f:\aa007595\f-reports\f0002-aar-aa007595   sbswmp   report\f0002-aa007595-aar-04.-smp.docx

Page 19

                  Table 6.3: Rainfall – Runoff Parameters
                   Flow Type Industrial            TSS log10 values                          TP log10 values   TN log10 values
                                Urban Surface
                                                   Mean       Std.                           Mean     Std.     Mean     Std.
                                Type
                                                              dev                                     dev.              dev.
                   Baseflow            Roof                     N/A              N/A          N/A      N/A     N/A       N/A
                                       Roads                    0.78             0.45        -1.11    0.48     0.14     0.20

                                       Ground level             0.78             0.45        -1.11    0.48     0.14     0.20
                   Stormflow           Roof                     1.30             0.44        -0.89    0.36     0.25     0.32

                                       Roads                    2.43             0.44        -0.30    0.36     0.25     0.32

                                       Ground level             1.92             0.44        -0.59    0.36     0.25     0.32



                  MUSIC MODEL LAYOUT
                  A MUSIC model has been created with three conceptual Legal Point of Discharge (LPOD)
                  nodes in order to demonstrate that the site meets the pollutant removal targets as specified by
                  Council and the State Planning Policy. Separate land use types have been modelled to
                  represent; roof water runoff, runoff from hardstand impervious areas and runoff from grassed or
                  otherwise pervious areas within each catchment. Appropriate percentage impervious factors
                  have been applied to all nodes based on the proposed design detailed within the Engineering
                  Drawings presented in Appendix B.

                  Four separate bio-retention areas across thee catchments form the basis of the treatment train
                  and is represented in the model with appropriate areas and volumes. A diagrammatic view of
                  the MUSIC model layouts is presented in Figure 6.3.




139 Eumundi Noosa Road & 30 Lionel Donovan Drive, Noosaville Service Station and Retail Site—Stormwater
Management Plans
Hyder Consulting Pty Ltd-ABN 76 104 485 289                                                                                      13
f:\aa007595\f-reports\f0002-aar-aa007595   sbswmp   report\f0002-aa007595-aar-04.-smp.docx

Page 20

              Figure 6.3: MUSIC Model Layout for Convenience Centre Development

The bio-retention areas for each catchment are listed below:

          -   Catchment 1: 33 m 2 of filter media area
          -   Catchment 21: 12m2 of filter media area
          -   Catchment 2b: 12m2 of filter media area
          -   Catchment 4: 72m2 of filter media area

     FUEL AREAS
      The proposed development will need to comply with the Australian Standard 1940 – The Storage
      and Handing of Flammable and Combustible Liquids. An emergency storage container, capable
      of containing, as a minimum, the quantity of at least the largest compartment of the delivery
      tanker, is required to be installed to collect vehicle dispensing spillage, blown in rain and tanker
      delivery spillages. In addition, the fuel dispensing area is to be treated by a package oil and grit
      separator.

      It is recommended to engage a suitably qualified hydraulic consultant to design the Fuel
      Dispensing Area (FDA), Uncovered Forecourt Area (UFA) and the tanker unloading area
      hydraulic management systems. Arcadis suggests the use of a specifically designed SPEL

Page 21

Puraceptor system to treat stormwater runoff in the Fuel Dispensing Area.

Independent testing on the SPEL systems concluded the following removal efficiencies:
     97% Total Suspended Solids (TSS)
     100% >5mm Gross Pollutant Solids (GP)
     99.9% of light liquids (TPH) (certified discharge quality of 5ppm or less)
     >30% particulate specialisation of phosphorous and nitrogen.
     <0.1mg/L hydrocarbon content (minimum requirement is 10mg/L)

A risk assessment has been completed by SPEL proposing to use a P.070.S.C1.2C Puraceptor
for the site. The risk assessment has been included in Appendix J.

The Puraceptor tank and associated infrastructure is to be installed prior to the stormwater
infrastructure discharging to Council assets.

CONSTRUCTION PHASE WATER QUALITY
An Erosion Hazard Assessment has been carried out for the proposed development – refer to
Appendix I for a copy of the completed Noosa Council form. As a result of this assessment, it
was determined that the site is a ‘low’ risk. During the construction phase of the development,
an Erosion and Sediment Control Program (ESCP) will need to be implemented to minimise
water quality impacts. A detailed Erosion and Sediment Control Program will be employed
throughout the site.

Details of the ESCP measures shall be provided on the operational engineering drawings for
the site earthworks and civil engineering works. The contractor shall be responsible for the
provision of the construction phase water quality objectives which shall be enforced by the
preparation and implemention of an Erosion and Sediment Control Program.

The ESCP shall be provided to all people involved with the construction, including sub-
contractors, private certifiers and regulators. These guidelines will be formed in accordance with
the Healthy Waterways Fact Sheet ‘Erosion and Sediment Control Management Plans’ and the
‘Best Practice Erosion and Sediment Control Guidelines.’

Page 22

          CONCLUSION
          The Site Based Stormwater Management Plan has been prepared to provide a design proposal
          and guide to the stormwater quantity and quality management techniques for the proposed
          Reconfiguration of Lot application across the convenience centre site.

          The three primary objectives of this SBSMP have been to ensure that:

          1. Suitable measures are incorporated in the development to ensure that there are no
             adverse impacts to downstream receiving waterways, property or infrastructure
             resulting from any increase to peak discharging stormwater flow rates;
             This has been achieved by demonstrating that the proposed development does not
              increase runoff flows from Lot 4 on SP159610. Development on Lot 31 SP170751 as part of
              MCU14/0102.02 and OPW15/0051 involves the construction of a detention basin which will
              detain peak flow discharges to the existing level.
          2. Investigate flood issues affecting the site and set appropriate finished levels for the
             proposed development to ensure adequate flood immunity is achieved.
             This has been achieved by reviewing Council’s flood records. It was established that the
              site is not affected by flooding.
          3. Details of a proposed stormwater quality treatment train are provided to ensure the
             discharge of stormwater from the site is of adequate quality standards to comply
             with the requirements of Noosa Council and the South-East Queensland Healthy
             Waterways Partnership.
             This has been achieved by the provision of a proposed stormwater treatment train which
              has been specifically designed and verified to achieve the necessary objectives under the
              Water by Design ‘MUSIC Modelling Guidelines’ approach. The treatment train includes a
              bio-retention area prior to the three legal points of discharge on site.
             An assessment of the development against Noosa Council’s Stormwater Code has been
              provided in Appendix H.
             Additionally, an Erosion Hazard Assessment has been carried out which has identified that
              the site is ‘low’ risk under the Noosa Council assessment guidelines. It is proposed that
              appropriate Erosion and Sediment control devises and a detailed Erosion & Sediment
              Control Plan are implemented throughout the site during construction.
             This report has demonstrated that the design of the proposed development has taken all
              necessary steps to adopt Water Sensitive Urban Design principals in full compliance of the
              Queensland State Planning Policy (2013), the Environmental Protection (Water) Policy
              1997, and The Australian Guidelines for Urban Stormwater Management (ANZECC 2000).




                                                                                              Stormwater Management Plans
Page 16                                                                         Hyder Consulting Pty Ltd-ABN 76 104 485 289
                                         f:\aa007595\f-reports\f0002-aar-aa007595   sbswmp   report\f0002-aa007595-aar-04.-smp.docx

Page 23

APPENDIX A


Architectural And Survey Plans




139 Eumundi Noosa Road Service Station Site—Stormwater Management Plans
Hyder Consulting Pty Ltd-ABN 76 104 485 289
f:\aa007595\f-reports\f0002-aar-aa007595   sbswmp   report\f0002-aa007595-aar-01-smp.docx

Page 24

SkylineSurveyors
Suite8,DwyerHouse   PHONE
                    0754934877
256NicklinWay       FAX
WARANAQLD4575       0754934899

Page 25

SkylineSurveyors
Suite8,DwyerHouse   PHONE
                    0754934877
256NicklinWay       FAX
WARANAQLD4575       0754934899

Page 26

APPENDIX B


Engineering Drawings




                                                                            Stormwater Management Plans
                                                              Hyder Consulting Pty Ltd-ABN 76 104 485 289
                       f:\aa007595\f-reports\f0002-aar-aa007595   sbswmp   report\f0002-aa007595-aar-01-smp.docx

Page 27

LEGEND




                                 CATCHMENT3




         CATCHMENT2




             CATCHMENT1

                                              FH




                            FH




                                                   HYDERCONSULTINGPtyLtd
                                                   ABN76104485289
                                                   Level7,199GreyStreet
                                                   LockedBag2017
         SkylineSurveyors                          SouthBrisbane,QLD4101
                                                   Australia

                                                   Tel:+610733370000
                                                   Fax:+610733370050

                                                   www.hyderconsulting.com

Page 28

LEGEND




                                 FH




                            FH




                                      HYDERCONSULTINGPtyLtd
                                      ABN76104485289
                                      Level7,199GreyStreet
                                      LockedBag2017
         SkylineSurveyors             SouthBrisbane,QLD4101
                                      Australia

                                      Tel:+610733370000
                                      Fax:+610733370050

                                      www.hyderconsulting.com

Page 29

                   HYDERCONSULTINGPtyLtd
                   ABN76104485289
                   Level7,199GreyStreet
                   LockedBag2017
SkylineSurveyors   SouthBrisbane,QLD4101
                   Australia

                   Tel:+610733370000
                   Fax:+610733370050

                   www.hyderconsulting.com

Page 30

APPENDIX C


Flood Assessment




139 Eumundi Noosa Road Service Station Site—Stormwater Management Plans
Hyder Consulting Pty Ltd-ABN 76 104 485 289
f:\aa007595\f-reports\f0002-aar-aa007595   sbswmp   report\f0002-aa007595-aar-01-smp.docx

Page 31

                                                                                                                                                                                         NOO S A
                                                                                                                                                                                         NO RTH                                                                                                                         I
                                                                                                                                                                                                                                                                                                                        !
                                                                                                                                                                                         SHORE                                                        N




                                                                                                                                                                                                                                                                                                                        RIVER FLOOD INFORMATION MAP 10-D34 - September 2012
HOW TO USE THIS MAP                                                                                                                                                                                                                                                                      O


(1) Identify locations important to                                                                       CE
                                                                                                                                                                     R
you such as home, work, and               Doonella
where your children go to school.          Lake
                                                                                               NOOSA                                                                              Noosa Home
(2) If any of these places are in                                                              LEISURE                                                                            Maker Centre




                                                                                                                                                                                                                                                                                                                                                                              Path: B:\Workflow\Projects\M3633_SCRC_Disaster_Management\R4815_Evacuation_Planning_Analysis\V20110809\Maps\Final Draft MXD's 23 Aug 2012\SCRC_Riverine_Flood_Hazard_Street-Level_PUBLIC_A4L_DDPAtlas_draft_20120828_1613_KelvinM.mxd - Printed on: 28/08/2012, Created by: at005, Date Created: Tuesday, 28 August 2012
one of the coloured zones, you              T E WAN T IN                                       CENTRE
                                                                                                                                                                I B S O NNoosa Village
may beat risk from river
flooding.
                                                                                                                                                                         Noosa
(3) Discuss and develop an
                                                                                                                                                                         Waters




                                                                                                            NO
                                                                                                                                                                                                                                                                                          YB A R
emergency plan for you and your                                                                                                                                          Canals
family, and identify potential                                                                                                                                                                                                                        NOOSA AUSTRALIAN
evacuation routes and high                                                                                                                                                                                                                               FOOTBALL CLUB
ground in your neighbourhood in
case roads are closed.                                                                                            LUTHERN
(4) During an event, stay tuned                                                                                   OVALS                        NO O S AV IL LE
to local radio, council's website,                                                                                PARK
facebook and twitter sites for
updates and evacuation advice.

       This area will flood first.




                                                                                                                                                                                                                                                                        ey a Creek
       In a major flood, waters
       will be deepest here.
       This area will flood after
       the red zone in a
       moderate flood.                                                                Noosa
                                                                                       Civic                                                                                                                                                                                              NOO S A
       This area will flood after
       the orange zone in a                                                                                                                                                                                                                                                               HE AD S
       major flood.
       This area may flood in
       an extreme flood event
                                                                                                                                                                                                                                                                                                 Lake
       but water will be                                                                                                                                                                                                                                                                        Weyba
       shallower than other
       zones.                                                   Disclaimer
                                                                This map has been produced in response to the recommendations of the Qld Floods Commission of Inquiry to promote             While every care is taken to ensure the accuracy of this product, neither the Sunshine Coast Council nor the
                                                                awareness of potential flood prone areas. The information is of a general nature and is not intended to replace the          State of Queensland makes any representations or warranties about its accuracy, liability, completeness or
                                                                need for site specific enquiry of Council records or to be a substitute for more formal flooding investigation required in   suitability for any particular purpose and disclaims all responsibility and all liability (including without limitation,
                                      0    125    250     500   any development approval or permit process. The information presented on this map is either model based,                     liability in negligence) for losses, damages (including indirect or consequential damage) and costs that may
                                                                derived from historic flood data, or estimated using the best judgement of a professional hydrologist. The map
                Major Roads                      Metres         is not accurate to the scale of a specific property and for some areas flood information is not available.
                                                                                                                                                                                             occur as a result of the product being inaccurate or incomplete in any way or for any reason.

Page 32

                                                                                                                                                                                                       NOOSA
                                                                                                                                                                                                       NO RTH
                                                                                                                                                                                                                                                                                                                            I
                                                                                                                                                                                                                                                                                                                            !
                                                                                                                                                                                                       SHORE




                                                                                                                                                                                                                                                                                                                            STORMTIDE INFORMATION MAP 10-D34 - September 2012
w w w. noosa.qld.gov.au

HOW TO USE THIS MAP                                                                                                 o osa Rive
(1) Identify locations important to                                                                              AC
you such as home, work, and
where your children go to school.                                                                                                                                                              Noosa Home
                                                                                                       NOOSA
(2) If any of these places are in                                                                     LEISURE
                                                                                                                                                                                               Maker Centre
one of the coloured zones, you                 T E WAN T IN                                                                                                                           Noosa Village




                                                                                                                                                                                                                                                                                                                                                                                Path: B:\Workflow\Projects\M3633_SCRC_Disaster_Management\R4815_Evacuation_Planning_Analysis\V20110809\Maps\Final Draft MXD's 23 Aug 2012\SCRC_StormTide_Flood_Hazard_Street-Level_PUBLIC_A4L_DDPAtlas_draft_20120828_1604_KelvinM.mxd - Printed on: 29/08/2012, Created by: at005, Date Created: Wednesday, 29 August 2012
                                                                                                      CENTRE
may be at risk from stormtide                                                                                                                                             AD
flooding.                                                    Doonella
(3) Discuss and develop an                                    Lake




                                                                                                                      NO
                                                                                                                                                                                                                                                                                               Y BA R
emergency plan for you and your
family, and identify potential                                                                                                                                                                                                                              NOOSA AUSTRALIAN
evacuation routes and high                                                                                                                                                                        Noosa                                                        FOOTBALL CLUB
                                                                                                                                                                                                  Waters
ground in your neighbourhood in                                                                                                                                                                   Canals
case roads are closed.                                                                                                   LUTHERN
(4) During an event, stay tuned                                                                                          OVALS
to local radio, council's website,                                                                                       PARK
facebook and twitter sites for
updates and evacuation advice.
         This area will flood when
         the Bureau of Meteorology
         (BOM) predicts a stormtide
         of 1 metre above HAT.*
         This area will flood after
         the red zone when the                      NO O S AV IL LE                                                                                                                                                                                                                              NOO S A
                                                                                            Noosa




                                                                                                                                                                                                                                                                                     W
         Bureau of Meteorology
         (BOM) predicts a stormtide                                                          Civic                                                                                                                                                                                               HE AD S
         of 1-2 metres above HAT.
         This area will flood after
         the orange zone when the
                                                                                                                                                                                                                                                                                                           Lake
         Bureau of Meteorology                                                                                                                                                                                                                                                                            Weyba
         (BOM) predicts a stormtide
         of 2-3 metres above HAT.
                                                                    Disclaimer
                     Major Roads                                    This map has been produced in response to the recommendations of the Qld Floods Commission of Inquiry to promote
                                                                    awareness of potential flood prone areas. The information is of a general nature and is not intended to replace the
                                                                                                                                                                                                 While every care is taken to ensure the accuracy of this product, neither the Sunshine Coast Council nor the
                                                                                                                                                                                                 State of Queensland makes any representations or warranties about its accuracy, liability, completeness or
                                                                    need for site specific enquiry of Council records or to be a substitute for more formal flooding investigation required in   suitability for any particular purpose and disclaims all responsibility and all liability (including without limitation,
                                          0   125    250      500   any development approval or permit process. The information presented on this map is either model based,                     liability in negligence) for losses, damages (including indirect or consequential damage) and costs that may
* HAT- Highest Astronomical Tide                    Metres
                                                                    derived from historic flood data, or estimated using the best judgement of a professional hydrologist. The map
                                                                    is not accurate to the scale of a specific property and for some areas flood information is not available.
                                                                                                                                                                                                 occur as a result of the product being inaccurate or incomplete in any way or for any reason.

levels are similar to King Tide levels.

Page 33

APPENDIX D


Site Specific IFD Charts




                                                                           Stormwater Management Plans
                                                             Hyder Consulting Pty Ltd-ABN 76 104 485 289
                      f:\aa007595\f-reports\f0002-aar-aa007595   sbswmp   report\f0002-aa007595-aar-01-smp.docx

Page 34

139 Eumundi Noosa Road Service Station Site—Stormwater Management Plans
Hyder Consulting Pty Ltd-ABN 76 104 485 289
f:\aa007595\f-reports\f0002-aar-aa007595   sbswmp   report\f0002-aa007595-aar-01-smp.docx

Page 35

                                                     Stormwater Management Plans
                                       Hyder Consulting Pty Ltd-ABN 76 104 485 289
f:\aa007595\f-reports\f0002-aar-aa007595   sbswmp   report\f0002-aa007595-aar-01-smp.docx

Page 36

APPENDIX E


Rational Method Calculations




139 Eumundi Noosa Road Service Station Site—Stormwater Management Plans
Hyder Consulting Pty Ltd-ABN 76 104 485 289
f:\aa007595\f-reports\f0002-aar-aa007595   sbswmp   report\f0002-aa007595-aar-01-smp.docx

Page 37

                                                                 Project:           Eumundi Noosa Road
                                                                 Project No.:       AA007595
                                                                 Designer:          KF
                                                                 Date:              5/11/2014




Rational Method Calculations

Project                       Eumundi Noosa Road

Description                   Catchment 1 (South Corner) Pre-Developed Discharge




Time of Concentration                                          5.0                  minutes

Area of Catchment                                       0.10                        Hectares

Fraction Impervious                                          0.85

Council Chart No.
                 15

Council Name
                                  #N/A


                   ARI                   C value          Rainfall Intensity        Discharge         (m3/s)         Comments
                                                                 (mm/hr)

        3month                                                                                 0.01             Write anything here
              1 year                      0.71                       128.57                    0.02             that is applicable to
                                                                                                                the analysis
             2 year                       0.75                       163.17                    0.03
             5 year                       0.84                       200.83                   0.04
       10 year                            0.89                       222.29                    0.05
       20 year                            0.93                       252.10                   0.06
       50 year                            1.00                       291.10                    0.08
  100 year                                1.00                       320.76                    0.08

                                                               ARI vs Discharge

                       6.00


                       5.00
  Discharge (cumecs)




                       4.00


                       3.00


                       2.00


                       1.00


                       0.00
                              0          10        20   30            40      50     60          70        80         90       100

                                                                              ARI


All Calculations are based on QUDM methods                                                                               Version 4/05

Page 38

                                                                 Project:           Eumundi Noosa Road
                                                                 Project No.:       AA007595
                                                                 Designer:          KF
                                                                 Date:              5/11/2014




Rational Method Calculations

Project                       Eumundi Noosa Road

Description                   Catchment 1 (South Corner) Post-Developed Discharge




Time of Concentration                                          5.0                  minutes

Area of Catchment                                       0.09                        Hectares

Fraction Impervious                                          0.85

Council Chart No.
                 15

Council Name
                                  #N/A


                   ARI                   C value          Rainfall Intensity        Discharge         (m3/s)         Comments
                                                                 (mm/hr)

        3month                                                                                 0.01             Write anything here
              1 year                      0.71                       128.57                    0.02             that is applicable to
                                                                                                                the analysis
             2 year                       0.75                       163.17                    0.03
             5 year                       0.84                       200.83                   0.04
       10 year                            0.89                       222.29                    0.05
       20 year                            0.93                       252.10                   0.06
       50 year                            1.00                       291.10                    0.07
  100 year                                1.00                       320.76                    0.08

                                                               ARI vs Discharge

                       6.00


                       5.00
  Discharge (cumecs)




                       4.00


                       3.00


                       2.00


                       1.00


                       0.00
                              0          10        20   30            40      50     60          70        80         90       100

                                                                              ARI


All Calculations are based on QUDM methods                                                                               Version 4/05

Page 39

                                                                    Project:          Eumundi Noosa Road
                                                                    Project No.:      AA007595
                                                                    Designer:         KF
                                                                    Date:             5/11/2014




Rational Method Calculations

Project                       Eumundi Noosa Road

Description                   Catchment 2 (Western Side) Pre-Developed Discharge




Time of Concentration                                          5.0                    minutes

Area of Catchment                                       0.26                          Hectares

Fraction Impervious                                             1

Council Chart No.
                 15

Council Name
                                  #N/A


                   ARI                   C value          Rainfall Intensity          Discharge         (m3/s)         Comments
                                                                 (mm/hr)

        3month                                                                                   0.03             Write anything here
              1 year                      0.72                       128.57                      0.07             that is applicable to
                                                                                                                  the analysis
             2 year                       0.77                       163.17                      0.09
             5 year                       0.86                       200.83                     0.12
       10 year                            0.90                       222.29                      0.14
       20 year                            0.95                       252.10                     0.17
       50 year                            1.00                       291.10                      0.21
  100 year                                1.00                       320.76                      0.23

                                                               ARI vs Discharge

                       6.00


                       5.00
  Discharge (cumecs)




                       4.00


                       3.00


                       2.00


                       1.00


                       0.00
                              0          10        20   30            40        50     60          70        80         90       100

                                                                                ARI


All Calculations are based on QUDM methods                                                                                 Version 4/05

Page 40

                                                                 Project:           Eumundi Noosa Road
                                                                 Project No.:       AA007595
                                                                 Designer:          KF
                                                                 Date:              5/11/2014




Rational Method Calculations

Project                       Eumundi Noosa Road

Description                   Catchment 2 (Western Side) Post-Developed Discharge




Time of Concentration                                          5.0                  minutes

Area of Catchment                                       0.24                        Hectares

Fraction Impervious                                            0.9

Council Chart No.
                 15

Council Name
                                  #N/A


                   ARI                   C value          Rainfall Intensity        Discharge         (m3/s)         Comments
                                                                 (mm/hr)

        3month                                                                                 0.03             Write anything here
              1 year                      0.71                       128.57                    0.06             that is applicable to
                                                                                                                the analysis
             2 year                       0.76                       163.17                    0.08
             5 year                       0.85                       200.83                   0.11
       10 year                            0.89                       222.29                    0.13
       20 year                            0.93                       252.10                   0.16
       50 year                            1.00                       291.10                    0.19
  100 year                                1.00                       320.76                    0.21

                                                               ARI vs Discharge

                       6.00


                       5.00
  Discharge (cumecs)




                       4.00


                       3.00


                       2.00


                       1.00


                       0.00
                              0          10        20   30            40      50     60          70        80         90       100

                                                                              ARI


All Calculations are based on QUDM methods                                                                               Version 4/05

Page 41

                                                                 Project:           Eumundi Noosa Road
                                                                 Project No.:       AA007595
                                                                 Designer:          KF
                                                                 Date:              5/11/2014




Rational Method Calculations

Project                       Eumundi Noosa Road

Description                   Catchment 3 (Eastern Side) Pre-Developed Discharge




Time of Concentration                                        17.7                   minutes

Area of Catchment                                       0.42                        Hectares

Fraction Impervious                                            0.1

Council Chart No.
                 15

Council Name
                                  #N/A


                   ARI                   C value          Rainfall Intensity        Discharge         (m3/s)         Comments
                                                                 (mm/hr)

        3month                                                                                 0.03             Write anything here
              1 year                      0.58                       76.83                     0.05             that is applicable to
                                                                                                                the analysis
             2 year                       0.61                       97.75                     0.07
             5 year                       0.68                       121.01                   0.10
       10 year                            0.72                       134.41                    0.11
       20 year                            0.76                       152.84                   0.13
       50 year                            0.83                       177.08                    0.17
  100 year                                0.86                       195.52                    0.20

                                                               ARI vs Discharge

                       6.00


                       5.00
  Discharge (cumecs)




                       4.00


                       3.00


                       2.00


                       1.00


                       0.00
                              0          10        20   30            40      50     60          70        80         90       100

                                                                              ARI


All Calculations are based on QUDM methods                                                                               Version 4/05

Page 42

                                                                  Project:           Eumundi Noosa Road
                                                                  Project No.:       AA007595
                                                                  Designer:          KF
                                                                  Date:              5/11/2014




Rational Method Calculations

Project                        Eumundi Noosa Road

Description                    Catchment 3 (Eastern Side) Post-Developed Discharge




Time of Concentration                                           5.0                  minutes

Area of Catchment                                        0.47                        Hectares

Fraction Impervious                                             0.9

Council Chart No.
                 15

Council Name
                                   #N/A


                 ARI                      C value          Rainfall Intensity        Discharge         (m3/s)         Comments
                                                               (mm/hr)

      3month                                                                                    0.06             Write anything here
           1 year                          0.71                       128.57                    0.12             that is applicable to
                                                                                                                 the analysis
          2 year                           0.76                       163.17                    0.16
          5 year                           0.85                       200.83                    0.22
     10 year                               0.89                       222.29                    0.26
     20 year                               0.93                       252.10                    0.31
     50 year                               1.00                       291.10                    0.38
  100 year                                 1.00                       320.76                    0.42
                                                                ARI vs Discharge

                        6.00


                        5.00
   Discharge (cumecs)




                        4.00


                        3.00


                        2.00


                        1.00


                        0.00
                               0          10        20   30            40      50     60          70        80          90       100

                                                                               ARI


All Calculations are based on QUDM methods                                                                                Version 4/05

Page 43

APPENDIX F


XP-RAFTS Hydrographs




                                                                      Stormwater Management Plans
                                                        Hyder Consulting Pty Ltd-ABN 76 104 485 289
                 f:\aa007595\f-reports\f0002-aar-aa007595   sbswmp   report\f0002-aa007595-aar-01-smp.docx

Page 44

EXISTING Q1




EXISTING Q100




139 Eumundi Noosa Road Service Station Site—Stormwater Management Plans
Hyder Consulting Pty Ltd-ABN 76 104 485 289
f:\aa007595\f-reports\f0002-aar-aa007595   sbswmp   report\f0002-aa007595-aar-01-smp.docx

Page 45

DEVELOPED Q1




DEVELOPED Q100




                                                                      Stormwater Management Plans
                                                        Hyder Consulting Pty Ltd-ABN 76 104 485 289
                 f:\aa007595\f-reports\f0002-aar-aa007595   sbswmp   report\f0002-aa007595-aar-01-smp.docx

Page 46

MITIGATED Q1




MITIGATED Q100




139 Eumundi Noosa Road & 30 Lionel Donovan Drive, Noosaville Service Station and Retail Site—Stormwater
Management Plans
Hyder Consulting Pty Ltd-ABN 76 104 485 289
f:\aa007595\f-reports\f0002-aar-aa007595   sbswmp   report\f0002-aa007595-aar-04.-smp.docx

Page 47

BASIN STORAGE




BASIN STAGE




                                                                         Stormwater Management Plans
                                                           Hyder Consulting Pty Ltd-ABN 76 104 485 289
                f:\aa007595\f-reports\f0002-aar-aa007595    sbswmp   report\f0002-aa007595-aar-04.-smp.docx

Page 48

APPENDIX G


MUSIC Modelling Layout and Results




139 Eumundi Noosa Road Service Station Site—Stormwater Management Plans
Hyder Consulting Pty Ltd-ABN 76 104 485 289
f:\aa007595\f-reports\f0002-aar-aa007595   sbswmp   report\f0002-aa007595-aar-01-smp.docx

Page 49

                                                     Stormwater Management Plans
                                       Hyder Consulting Pty Ltd-ABN 76 104 485 289
f:\aa007595\f-reports\f0002-aar-aa007595   sbswmp   report\f0002-aa007595-aar-01-smp.docx

Page 50

Catchment 1 Bio Retention Details




Catchment 2a Bio Retention Details


[OCR of page images]
Catchment 1 Bio Retention Details

 

 

 

 

 

 

 

 

 

Properties of 1 Bioretention =a)
Location roducts >>
po Inlet Properties AA a Lining Properties --__

Low Flow By-pass (cubic metres per sec) 0.000 |s Base Lined? 5 Yes [¥] No
Foi ic metres! 0.075
High Flow By-pass (cubic per sec) — Vegetation Propert
[pee ties © Vegetated with Effective Nutrient Removal Plants
Extended Detention Depth (metres) 0.15
Surface Area (square metres) 33.00 © Vegetated with Ineffective Nutrient Removal Plants
Fitter and Media Properties | © Unvegetated
Filter Area (square metres) 33.00
Unlined Fiter Media Perimeter (metres) 22.00 es
Overflow Weir Width (metres) 2.00
Saturated Hydraulic Conductivity (mm/hour) 200.00
Fiter Depth (metres) 0.70 Underdrain Present? {¥] Yes [fF] No
TN Content of Filter Media (mg/kg) 800 Submerged Zone With Carbon Present? © Yes [¥] No
Orthophosphate Content of Filter Media (mg/kg) 55.0 i 045
Depth (metres 0.45
\~ Infiltration Properties
Extitration Rate (mm/hr) 0.00 | —— | Notes... || sie |

 

 

 

 

 

 

 

 

Catchment 2a Bio Retention Details

 

 

 

 

 

 

 

 

 

 

 

Properties of 2a Bioretention (12) ete)
Location 2a Bioretention (12) =} Products >>
;~ Inlet Properties r~ Lining Properties
Low Flow By-pass (cubic metres per sec) 0.000 Is Base Lined? Yes No
Flor ic metres 0.075
High Flow By-pass (cubic metres per sec) — =
[Storage Pro © Vegetated with Effective Nutrient Removal Plants
Extended Detention Depth (metres) 0.20
Surface Area (square metres) 12.00 © Vegetated with Ineffective Nutrient Removal Plants
[Filter and Media Properties _| © Unvegetated
Filter Area (square metres) 12.00
Unlined Fitter Media Perimeter (metres) 18.00 CoS ES
Overflow Weir Width (metres) 2.00
Saturated Hydraulic Conductivity (mm/hour) 200.00
Fiter Depth (metres) 0.70 Underdrain Present? Yes [F] No
TN Content of Filter Media (mg/kg) 800 Submerged Zone With Carbon Present? © Yes [¥] No
Orthophosphate Content of Fitter Media (ma/ka) 55.0
Depth (metres: 0.45
(— Infitration Properties
Exitration Rate (mm/nr) 0.00 | Funes... | Notes... | | More

 

 

 

 

 

 

 

 

 

 

Page 51

Catchment 2b Bio Retention Details




Catchment 3 Bio Retention Details




139 Eumundi Noosa Road & 30 Lionel Donovan Drive, Noosaville Service Station and Retail Site—Stormwater
Management Plans
Hyder Consulting Pty Ltd-ABN 76 104 485 289
f:\aa007595\f-reports\f0002-aar-aa007595   sbswmp   report\f0002-aa007595-aar-04.-smp.docx

Page 52

Sources
Residual Load

% Reduction

Flow (ML/yr)
1.16
1.11

44

Treatment Train Effectiveness

TSS (kg/yr)
155
11.2

92.7

1 Outlet

TP (kg/yr)
0.380
0.149

60.7

TN (kg/yr)
2.69
0.931

65.4

27/02/2015 8:21:51 AM

Gross Pollutants (kg/yr)
19.0
7.73E-3

100.0

Page 53

Sources
Residual Load

% Reduction

Flow (MU/yr)

1.17
1.16
1.2

TSS (kg/yr)

402
74.6
81.4

2a Outlet

Treatment Train Effectiveness
TP (kg/yr)
0.677
0.243
64.1

TN (kg/yr)
2.68
1.37
48.8

11/11/2015 4:10:17 PM

Gross Pollutants (kg/yr)
27.2
0.00
100.0

Page 54

Sources
Residual Load

% Reduction

Flow (MUjr)

1.24
1.23
1.2

TSS (kg/yr)

568
105
81.5

2b Outlet

Treatment Train Effectiveness

TP (kg/yt)

0.860
0.285

66.9

TN (kg/yr)
2.88
1.53

46.9

11/11/2015 4:11:46 PM

Gross Pollutants (kg/yr)
29.1
0.00
100.0

 

Page 55

Sources
Residual Load

% Reduction

Flow (MLIyr)
6.48
6.37
18

Treatment Train Effectiveness

TSS (kg/yr)
1.40E3
187

86.7

3 Outlet

TP (kg/yr)

2.65
1.02
61.3

TN (kg/yr)
15.1
6.78
§5.2

27/02/2015 8:22:17 AM

Gross Pollutants (kg/yr)
144
1.05
99.3

Page 56

APPENDIX H


Noosa Council Stormwater Code Compliance




139 Eumundi Noosa Road Service Station Site—Stormwater Management Plans
Hyder Consulting Pty Ltd-ABN 76 104 485 289
f:\aa007595\f-reports\f0002-aar-aa007595   sbswmp   report\f0002-aa007595-aar-01-smp.docx

Page 57

SPECIFIC OUTCOMES, ACCEPTABLE SOLUTIONS AND PROBABLE SOLUTIONS
FOR THE WATER SENSITIVE DESIGN CODE
SPECIFIC OUTCOMES                     PROBABLE SOLUTIONS             SITE COMPLIANCE

Water reuse                           S1.1                           Complies:
O1                                    Development complies with        - The development
Development uses a                    the water quality standards         includes three
combination of detention              in Table 2 of the SEQ               bioretention systems
and retention systems to              Regional Plan                       and a detention
capture run-off from areas            Implementation Guideline            basin to ensure that
on the site                           No.7 for Water Sensitive            peak flow
AND                                   Urban Design;                       discharges are
                                                                          mitigated and water
O2                                                                        quality is maintained
                                      S2.1
Water storage devices                                                  - Water detained on
must have sufficient                  No solution provided
                                                                          site will not be for
capacity having regard to                                                 potable use
local rainfall pattern and            S3.1
the catchment area of roof                                             - Site is not within the
                                      Captured water is plumbed           Shire Business
or other hard standing                to be available for all
surface                                                                   Centre
                                      external uses including
AND                                   gardening, irrigation,
O3                                    ponds, filling swimming
Captured water is utilised            pools and outdoor
for all non-potable uses on           cleaning, as well as all
site;                                 ground floor toilet cisterns
                                      and washing machine cold
AND
                                      taps;
O4
On-site detention does not            AND
adversely impact on water
requirements downstream               S3.2
of the site where the water           Where the captured water
is required to sustain the            is used for toilet flushing
ecology and hydrology of              and/or laundry use, an
downstream systems                    automatic or manual
(environmental flows);                interchange device that
AND                                   allows alternate use of
                                      captured water or the
O5                                    reticulated water supply is
Within the Shire Business             installed to ensure that
Centre site, as shown on              there is a continual supply
Map SBC, on-site detention            of water for sanitary
measures are contained                flushing and laundry use.
within the developed                  S4.1
areas of the site,
clear of drainage lines and           No solution provided
Open Space Precincts.                 S5.1
                                      No solution provide

Eumundi Stormwaster Code Compliance                                                        Page 1

Page 58

Run-off treatment                     S6.1 & S7.1                   Complies - the
O6                                    Development complies with     development includes bio-
Run-off that leaves the site          the water quality standards   retention systems that will
is treated so as not to               in Table 2 of the SEQ         meet all water quality
adversely impact on the               Regional Plan                 standards.
ecology and hydrology of              Implementation Guideline
downstream environmental              No. 7 for Water Sensitive
flows                                 Urban Design
AND
O7
Within the Shire Business
Centre site, as shown on
Map SBC—run-off
treatment occurs within the
site; and drainage lines are
only used for final polishing
of run-off
Town water supply                     S8.1                          Complies – this will be
connections                           A suitable backflow           installed during
O8                                    prevention device is          construction phase
Backflow devices or similar           installed to protect the
systems ensure water                  potable water within the
reuse facilities have no              reticulated water supply in
impact on the quality of the          accordance with AS/NZS
town mains water                      3500:2003 Plumbing and
                                      Drainage
Use of natural treatments             S9.1 & S10.1                  Complies – the
and systems                           Development complies with     development includes bio-
O9                                    the water quality standards   retention systems that will
Natural treatment                     in Table 2 of the SEQ         maintain water quality
strategies, including grass           Regional Plan                 standards.
swales and bio- retention             Implementation Guideline
systems, vegetated                    No. 7 for Water Sensitive
filtration strips and gross           Urban Design
pollutant traps, are used
wherever practicable;
AND
O10
Within the Shire Business
Centre, as shown on Map
SBC—where necessary,
drainage lines are
ecologically enhanced to
ensure that the water
quality polishing functions
are of high standard


Eumundi Stormwaster Code Compliance                                                           Page 2

Page 59

APPENDIX I


Noosa Council Erosion Assessment Form




                                                                        Stormwater Management Plans
                                                          Hyder Consulting Pty Ltd-ABN 76 104 485 289
                   f:\aa007595\f-reports\f0002-aar-aa007595   sbswmp   report\f0002-aa007595-aar-01-smp.docx

Page 60

SCHEDULE 2—EROSION AND SEDIMENT CONTROL
ASSESSMENT

 

 

1; Preamble

Erosion and sediment control on building sites

Builders must not pollute the environment. The Environmental Protection Act provides for
penalties for persons or entities causing environmental harm.

Soil erosion on building sites can be a major source of sediment pollution (environmental
harm) in our watercourses, A single building site can lose up to four truckloads of soil in one
storm. Washed from the sites into stormwater drains, this sediment can cause flooding and
also affects the water quality and the fish stocks in our creeks, lakes and the Noosa River
system.

Preventing sediment run-off from building sites is one of a number of ways that Council and
industry are improving our watercourses.

Effective on-site erosion and sediment control provides the following benefits—

e Abetter looking, more marketable site;

e Improved wet weather working conditions;
e Reduced stockpile losses;

e Less mud and dust problems;

e Reduced clean-up costs;

e Fewer public complaints;

e Better public image;

e Cleaner watercourses; and

e Better fishing and swimming in our nearby watercourses.

 

2, Erosion Hazard Assessment Form

Controlling Factors me) Score Checking
Predominant slope’ of the whole site, prior to
building works:
¢ 0-3% slope

>3% - 5% slope

>5% - 10% slope

>10% - 15% slope

> 15% slope

ann AO

 

 

Sandy soil/gravel

°
°
e
e
Soil type: (see 7 below)
°
e Sandy loam

[

 

 

 

 

 

' The term ‘predominant slope’ is defined in Part 2 Section 2.12.

$2.1

The Noosa Plan

Including amendments to 16 September 2013

Page 61

The Noosa Plan

Ircluding amendments to 16 September 2013

 

 

 

 

 

 

 

 

 

Controlling Factors de Stteh 2) Checking
e Clay loam 2
e _Claysoil 2
Anticipated duration of site disturbance: (see 2 below)
e Duration < 2 weeks 0
e 2weeks # Duration <3 months 2 7.
e 3months # Duration <6 months 4
e Duration > 6 months 5
Month that works are undertaken: (see 3 below)
e August, September 0
e April, May, June, July, November, October 1 E
e March December 2
e__ January February 3 _ -
Offsite sediment control (i.e. down slope of the soil
disturbance): |
e Score 1 point if there is no purpose built, operational |
and well maintained sediment traps (eg. sediment
basin, gross pollutant trap or purpose built wetland) QO
to catch sediment before it enters a water body with
environmental values (eg. creek, natural wetland,
river or bay) (see 4 below)
Run-off entering the site:
e Score 1 point if stormwater run off entering the site is 1 QO
not diverted away from the soil disturbance
Extent of site disturbance:
e Score 2 points if building work requires reshaping of
the ground surface (eg. ‘cut and fill’ works) (see 5 2 G
below)
e Score 5 points if the area to be disturbed is greater 5
than 600m?
Works within environmentally sensitive areas:
e Score 11 points if the disturbance is within the banks
of a watercourse (see 6 below) 11
e Score 5 points if the disturbance is within 50m of the
top of bank of a watercourse 5 O
e Score 2 points if the disturbance is between 50m
and 100m of the top of bank of a watercourse 2
TOTAL SCORE (See 7 & 8 below) | -

 

 

 

Notes:

 

1. Where there is more than one type of soil on the site, select the category with the highest point value.

2. The time, from when the building site will first become vulnerable to erosion, to the time the soil will
be fully stabilised (eg. grassing).

3. If this time span covers more than one category, select the category with the highest point value.
Note that if there is no grass/vegetation cover on the site before building work has started, the time
span starts from the time this form is completed.

4. If you are not sure, score 7 point.

5. For the purpose of this form, ‘cut and fill’ works are those that will result in a steep batter or retaining
wall above and/or below the building slab, greater than 1 metre in height. If the building slab has
already been fully cut and stabilised (eg. grassed) during the subdivision stage, score 0 points.

6. Watercourse means any clearly identifiable creek, stream or river, whether flowing permanently or
intermittently.

7. For a high risk site, the total score is > 14 points.

8. Fora lowrisk site, the total score is < 14 points.

$2.2

Page 62

APPENDIX J


SPEL Eumundi Servo Puraceptor Risk Assessment


[OCR of page images]
APPENDIX J

 

SPEL Eumundi Servo Puraceptor Risk Assessment

Page 63

    SPEL Puraceptor Report
             For
  Eumundi Service Station and
      Commercial Centre

Date: Mar 2017                     Brisbane Office
Client: Noosa Shire Council         96 Cobalt Street
                              Carole Park QLD 4300
Issue: 1
                                 P +61 7 3271 6960
                                 F +61 2 9630 0369
                              E [email protected]

                                 www.spel.com.au

Page 64

            Table of Contents

            List of Tables ......................................................................................................................... 3
            List of Figures ........................................................................................................................ 3
            1.0       Introduction ............................................................................................................... 5
               1.1       Objectives ............................................................................................................... 6
               1.2       Scope ...................................................................................................................... 6
            2.0       The SPEL Puraceptor................................................................................................... 6
               2.1       Components ........................................................................................................... 8
                   2.1.1        Coalescing Filter............................................................................................... 8
                   2.1.2        SPEL Auto Closure Device (ACD) ....................................................................... 9
                   2.1.3        SPEL Automatic Alarm/Monitoring System .................................................... 10
               2.2       SPEL Puraceptor Sizing .......................................................................................... 12
               2.3       SPEL Puraceptor Application Areas........................................................................ 12
               2.4       Performance Analysis............................................................................................ 12
                   2.4.1        University of South Australia Testing – Oil & TPH ........................................... 12
                   2.4.2        HR Wallingford Testing – Oil & TPH ................................................................ 14
                   2.4.3        Australian Field Testing – Oil & TPH ............................................................... 14
                   2.4.4        Woolworths Bomaderry................................................................................. 15
                   2.4.5        Caltex-Woolworths - Lakewood. .................................................................... 17
                   2.4.6        Caltex Woolworths - Warner.......................................................................... 20
                   2.4.7        Freedom Fuels - Southport............................................................................. 22
            3.0       Maintenance Procedures.......................................................................................... 25
               3.1       Coalescer Unit....................................................................................................... 25
               3.2       Coalescer Foam..................................................................................................... 25
               3.3       Vacuum removal of Fuel & Silt .............................................................................. 26
               3.4       Vacuum removal of Complete Contents (If Necessary).......................................... 26
               3.5       Re-insert Coalescer Unit and ACD ......................................................................... 26
               3.6       SPEL Automatic Alarm/Monitoring System ........................................................... 26
            4.0       Conclusion................................................................................................................ 28
            5.0       References ............................................................................................................... 29
            6.0       List of Appendices .................................................................................................... 30
               Appendix 1 – British Standard BS EN 858......................................................................... 30
               Appendix 2 – Oil Alert Technical Settings and Operation & Maintenance Manual ........... 30
               Appendix 3 – UniSA Lab Tests & Independent Validations ............................................... 30



HEAD OFFICE                     POSTAL                                EMAIL                                  ABN                                 spel.com.au
100 Silverwater Road            PO BOX 7138                           [email protected]                      83 151 832 629
Silverwater NSW 2128            Silverwater NSW 2128

Page 65

                Appendix 4 – HR Wallingford testing ............................................................................... 30
                Appendix 5 – Field test results (Australia)........................................................................ 30



            List of Tables

            Table 1. - Reduction of Total Petroleum Hydrocarbons, UniSA............................................................................ 13
            Table 2. – Test results of SPEL Separators, HR Wallingford .................................................................................. 14
            Table 3. Water Quality Analysis results – Woolworths Bombaderry.................................................................... 17
            Table 4. Water Quality Analysis results – Woolworths Lakewood ....................................................................... 19
            Table 5. Water Quality Analysis results – Woolworths Warner ........................................................................... 22
            Table 6. Water Quality Analysis results (values exceeding 10ppm highlighted in yellow) ................................... 24




            List of Figures

            Figure 1. SPEL Puraceptor and its major components............................................................................................ 8
            Figure 2. Actual coalescer unit (Left), the unit with its lifting chains (Centre) and the unit’s guide rail system,
            locating and locking system (Right) ........................................................................................................................ 9
            Figure 3. Automatic closure device within the SPEL Puraceptor .......................................................................... 10
            Figure 4. Oil Alert Probe and its Location in the Puraceptor ................................................................................ 10
            Figure 5. Automatic closure device within the SPEL Tank .................................................................................... 11
            Figure 6. Woolworths Bomaderry site (shown by yellow line)............................................................................. 15
            Figure 7. Location of Puraceptor on site plan....................................................................................................... 16
            Figure 8. Section through Puraceptor showing sample points............................................................................. 16
            Figure 9. Woolworths Lakewood site (shown by yellow line). ............................................................................. 18
            Figure 10. Section through Puraceptor showing sample points........................................................................... 19
            Figure 11. Woolworths Warner site (shown by yellow line). ............................................................................... 20
            Figure 12. Section through Puraceptor showing sample points........................................................................... 21
            Figure 13. Freedom Fuels site (shown by yellow line).......................................................................................... 23
            Figure 14. Section through Puraceptor showing sample points........................................................................... 24
            Figure 15. Maintenance Schematic. ..................................................................................................................... 25
            Figure 16. Maintenance process relevant to SPEL Puraceptor components........................................................ 27




HEAD OFFICE                        POSTAL                                      EMAIL                                       ABN                                     spel.com.au
100 Silverwater Road               PO BOX 7138                                 [email protected]                           83 151 832 629
Silverwater NSW 2128               Silverwater NSW 2128

Page 66

            DOCUMENT CONTROL RECORD


              Prepared By:           Dr Darren Drapper, B.Eng(Env)Hons, PhD(EnvEng), MBA,
                                     CertIV (WHS), RPEQ, NPER.
              Position:
                                     Research & Development
              Signed:

              Date:
                                     Feb 2016



              Reviewed By:
                                     Andy Hornbuckle
              Position:
                                     Team Leader - Australasia, SPEL Environmental


              Signed:


              Date:
                                     Feb 2016



            REVISION STATUS

                      Revision No.            Description Of Revision             Date                      Approved
                                                     Submission                 Feb 2016
                           1




                                                    RELIANCES, USES AND LIMITATIONS
              This report is copyright and is to be used only for its intended purpose by the intended recipient and is not to
              be copied or used in any other way. The report may be relied on for its intended purpose within the limits of
              the following disclaimer. This study, report and analysis have been based on the information available to SPEL
              Environmental at the time of preparation SPEL Environmental accepts responsibility for the report and its
              conclusions to the extent that the information was sufficient at the time of preparation. SPEL Environmental
              does not take responsibility for errors and emissions due to incorrect information or information not available
              to SPEL Environmental at the time of preparation of the study, report or analysis




HEAD OFFICE                    POSTAL                            EMAIL                       ABN                          spel.com.au
100 Silverwater Road           PO BOX 7138                       [email protected]           83 151 832 629
Silverwater NSW 2128           Silverwater NSW 2128

Page 67

            1.0        Introduction
            SPEL Environmental has been requested by Noosa Shire Council to prepare a report for the SPEL Puraceptor to
            demonstrate the overall compliance of the Puraceptor and its performance in removing hydrocarbons from
            stormwater, compliant with Council requirements. And in addition achieve the capture of a large spill that may
            occur as a result of tanker unloading and retain it as a holding tank function via the auto-closure device. The
            SPEL Puraceptor is sized to collect the oily runoff from all the high risk area on site and treat it to less than 5 ppm
            hydrocarbon concentration and discharge to stormwater. The aerial view of the site is shown below:




            The site is a proposed Service Station and Commercial Centre located in 139 Eumundi Noosa Road Eumundi, QLD
            which is about 120 km north of Brisbane and under Noosa Shire Council. The undercanopy area of the Service Station
            will be considered as high risk and will therefore be treated by the Puraceptor.
            The proposed SPEL Puraceptor for this siteis a P.070.S.C1.2C which has a spill capacity of 12,400 Litres.




HEAD OFFICE                  POSTAL                           EMAIL                             ABN                           spel.com.au
100 Silverwater Road         PO BOX 7138                      [email protected]                 83 151 832 629
Silverwater NSW 2128         Silverwater NSW 2128

Page 68

            1.1        Objectives

            The overall objective of this report is to demonstrate that the SPEL Puraceptor can treat the stormwater runoff
            to remove hydrocarbons providing superior advantages to the suggested design by Council (i.e. Blind Sump),
            and to demonstrate that it can isolate and retain a spill should it occur.


            1.2        Scope

            The scope of this document includes the following:

                      demonstrate the operation of the Puraceptor is equivalent or better than the conditioned set up of a
                       blind sump for a large amount of hydrocarbon spill;
                      presentation of the testing results of both laboratory and field installations for hydrocarbon removal;
                       and
                      Discussion of applications in under-canopy and other sites areas.



            2.0        The SPEL Puraceptor
            The SPEL Puraceptor is a full retention oil separator that treats the runoff generated from fuel stations. It is sized
            to contain more than the anticipated maximum oil spillage (industry standard practice is 8,000L) enabling it to
            be fully operational at all times. The flow tests conducted by the University of South Australia Hydraulics
            Research Laboratory (UniSA) and at HR Wallingford United Kingdom confirms that the unit complies with the
            European Standard BS EN 858.1.2006. The Australian Runoff Quality Handbook (ARQ) makes several references
            to the BS EN 858.1.2006 standard in chapter 9 (Hydrocarbon Management). The SPEL Puraceptor achieves a
            water discharge quality of less than 5 mg light liquids per litre, complying with European Standard BS EN 858
            (Appendix 1). Treatable flow rates range from 2 L/sec to 200 L/sec and its pipe sizes range from 100mm to
            450mm. SPEL Puraceptor units are glass reinforced plastic vessels made by the technical advanced chop hoop
            filament winding process (patented) producing circumferential and longitudinal strength complying with BS4994
            FRP Pressure Vessel code and AS 2634FRP Chemical Equipment to ensure the construction meets the necessary
            strength and stability requirements. The tank is designed to accept ground conditions with low stiffness down
            to 4.8MPa, water tables are set to ground level as standard with a minimum depth of cover, based on a standard
            soil density.

            The treatment efficiency in SPEL Puraceptor Class 1 is:

                      >99.9% hydrocarbons reduction
                      >97% sediment reduction for median particle size distribution 70µm




HEAD OFFICE                   POSTAL                          EMAIL                            ABN                           spel.com.au
100 Silverwater Road          PO BOX 7138                     [email protected]                83 151 832 629
Silverwater NSW 2128          Silverwater NSW 2128

Page 69

            SPEL Puraceptors are easy and safe to clean and maintain, with provision to both chambers through manholes
            conveniently placed for vacuum - loading truck access. Cleaning is performed by personnel from outside the
            tank. Entry of the tank is not required, satisfying OH&S requirements.

            The SPEL Puraceptor has many unique benefits and covers a broad duty range, making it the obvious choice to
            avert runoff contamination, and treat hydrocarbon and TSS runoff. Some of the benefits include:

            Suitable to discharge to local rivers and streams;

                      Approved to the stringent European Standard BS EN 858.1 2006;
                      Complies with the Department of Environment Climate Change Water of NSW [DECCW] for stormwater
                       quality;
                      Lightweight fibreglass horizontal construction;
                      Complying with ANZECC 2000 Guidelines;
                      Complying with the standards of Department of Environment and Resource Management of QLD
                       [DERM];
                      Complying with Environmental Protection Agency [EPA] of South Australia, Northern Territory,
                       Tasmania & Victoria;
                      Australian and New Zealand Environment Conservation Council Guidelines for recreational water
                       quality and aesthetics (Chapter 5);
                      Complying with the Australian Airport [Federal] Environmental Protection Act;
                      Complying with the “no visible trace or sheen of oil or grease on released waters” condition forced by
                       the Department of Water;
                      Duty range 2L/sec - 200L/sec;
                      Coalescer pack to improve output quality to less than 5mg/L;
                      Oil Level probe for continuous monitor;
                      Auto Closure Device for bulk spill protection;
                      Gravity driven;
                      One piece unit for easy on-site installation;
                      No power requirement for auto closure device — failsafe protection from light liquid spills (Puraceptor
                       model);
                      Cost effective;
                      Compliments other components in the treatment train;
                      Discharge to stormwater/receiving environment drain or as site requires.




HEAD OFFICE                   POSTAL                           EMAIL                        ABN                          spel.com.au
100 Silverwater Road          PO BOX 7138                      [email protected]            83 151 832 629
Silverwater NSW 2128          Silverwater NSW 2128

Page 70

            2.1        Components

            The Puraceptor Class 1 is a gravity-type, passive, full retention flow system that treats all flows through two
            chambers. Low velocity laminar flow provides quiescent conditions in the separator enabling the light liquid
            content of the water to separate and rise to the surface due to the difference in density of the hydrocarbons
            and water. Contaminated water cannot flow directly across the surface before effective separation has taken
            place. Treatment process involves the `cleaner` water passing from the primary chamber by underflow into the
            secondary chamber and finally through a coalescing filter mounted in the secondary chamber to `collect` smaller
            droplets of hydrocarbons and encourage larger droplets to form enabling better removal by gravity to the
            collecting area in the sealed secondary chamber. The SPEL Puraceptor is sized to treat and capture all flows.
            There is no bypass facility, meaning all pollutants are captured and retained between maintenance cycles. Figure
            1 illustrates a sectional view of the SPEL Puraceptor and its components.




                                           Figure 1. SPEL Puraceptor and its major components

            2.1.1      Coalescing Filter
            The coalescer is a high-reticulated and high-contact surface filter with a minimum life span of eight years. It is
            mounted into the secondary chamber, providing a coalescing process for the separation of smaller oil droplets.
            Incorporated in the secondary chamber prevents the coalescer from being blocked in the event of major
            spillages and large amounts of accumulated hydrocarbon or heavy silt content in the surface water.

            SPEL Coalescer Units Guide Rail System/Lifting, Locating and Locking System
            This facilitates easy insertion and removal of coalescer unit. The system is robust, manufactured throughout in
            stainless steel and is action positive, leaving no doubt the coalescer unit is located properly. Brackets fixed to
            the top and bottom of the coalescer unit simply engage the stainless steel guide rail fixed to the top of the stub
            access shaft.




HEAD OFFICE                  POSTAL                         EMAIL                           ABN                          spel.com.au
100 Silverwater Road         PO BOX 7138                    [email protected]               83 151 832 629
Silverwater NSW 2128         Silverwater NSW 2128

Page 71

             Figure 2. Actual coalescer unit (Left), the unit with its lifting chains (Centre) and the unit’s guide rail system,
                                                    locating and locking system (Right)

            The coalescer is then lowered in the normal way, being guided at the correct angle into the conical base unit
            which finally locates the coalescer unit into its final position. Extension guide rails can be incorporated into the
            SPEL extension shafts to suit (preferably when ordered with the separator). However, when the separator is full
            of water, debris or sludge accumulated over a period could prevent the coalescer unit from re-seating correctly
            after servicing. The coalescer unit lifting / locating / locking system ensures the coalescer unit is seated correctly
            and can be locked into position to prevent tampering. The stainless steel lifting handle can be extended to suit
            deep tank inverts and provide easy access for lifting manually or with a tripod and hoist utilising the lifting hook.

            2.1.2      SPEL Auto Closure Device (ACD)
            The Automatic Closure Device (ACD) is found in the first chamber of a Puraceptor. The purpose of the ACD is to
            close the separator off automatically when the maximum storage capacity of light liquid is attained. The ACD is
            to ensure that in the event of a major spillage, pollutants do not pass into the drainage system; it should not be
            regarded as a substitute for an automatic alarm / monitoring system. The ACD is a specifically designed copper
            float that is semi-buoyant and floats at the oil/water interface. As the oil depth increases in the Puraceptor
            (during a spill), the ACD float remains at the oil/water interface and subsequently floats lower, closer to the
            outlet point. The ACD seal hangs 400mm below the ACD float such that it will fully close the outlet port 400mm
            before the oil/water interface reaches the outlet port. This minimises the potential risk of any oil spill being
            entrained from the Puraceptor.

            Operation and Maintenance
            If the tank should fill with light liquid, the ACD which is calibrated for a specific gravity of 0.85 will automatically
            sink and isolate the SPEL Puraceptor. Normally routine maintenance would include removing light liquid
            intercepted within the Puraceptor. If a SPEL automatic alarm/monitoring system is incorporated, it will
            automatically indicate when the Puraceptor should be emptied. Only in an emergency will the Puraceptor fill to
            its maximum and operate the ACD. In such an event the Puraceptor should be completely vacuumed out and
            the ACD lifted out. To re-insert the ACD, partially fill the Puraceptor with clean water (if necessary) to ensure the
            ACD when re-inserted remains floating and then re-insert the ACD. Finally check the ACD is floating and the




HEAD OFFICE                  POSTAL                           EMAIL                             ABN                            spel.com.au
100 Silverwater Road         PO BOX 7138                      [email protected]                 83 151 832 629
Silverwater NSW 2128         Silverwater NSW 2128

Page 72

            retaining cap has been replaced to safeguard against its removal by unauthorised persons, unless depth of tank
            precludes doing so from ground level.




                                    Figure 3. Automatic closure device within the SPEL Puraceptor

            2.1.3      SPEL Automatic Alarm/Monitoring System
            The SPEL automatic alarm/monitoring system provides an audible warning alarm when the level of the oil in the
            SPEL separator reaches approximately 10% of the storage volume under static liquid level conditions. This is an
            early warning system that is used for spills or lack of maintenance. The system comprises of a probe mounted in
            the main separation chamber which senses when the design volume of hydrocarbons has accumulated and
            sends a signal to the electronic control unit activating a red ‘empty now’ warning light and an audible alarm.




                                      Figure 4. Oil Alert Probe and its Location in the Puraceptor




HEAD OFFICE                  POSTAL                         EMAIL                          ABN                          spel.com.au
100 Silverwater Road         PO BOX 7138                    [email protected]              83 151 832 629
Silverwater NSW 2128         Silverwater NSW 2128

Page 73

            Operation
            The probe is freely suspended in the probe protection tube in the separator at the correct level. When the oil-
            layer or depth of hydrocarbons reaches the predetermined level, the top of the probe will be immersed in the
            oil, breaking the circuit and activating the alarm. It is a ‘fail-safe’ system providing complete assurance that it is
            operative. If a fault occurs, the fault lights activate immediately.

            Installation
            The control unit has been designed to be located indoors and outdoors. It should be wall mounted and positioned
            such that the LED display and push switches on the front panel can be readily seen and accessed. The unit can
            be secured to the wall by using the four mounting holes provided. Included within the control is an intrinsically
            safe circuit (approved according to ATEX Directive 94/9/EC), to which the probe unit is connected. The probe and
            the circuit are intrinsically safe and are attached to a remote control unit.




                                        Figure 5. Automatic closure device within the SPEL Tank

            The control unit should be connected to a suitable 220/240V AC supply and fused at 3 amps. This appliance must
            be earthed. Wiring from the control unit to the probe junction box in the separator chamber requires a 3-core
            screened, 0.75 mm core section cable and maximum cable length is 300 metres. A 5 metre 3-core probe cable
            is normally fitted to the junction box and the probe. After all connections have been made, the cables must be
            secured by tightening each entry gland.

            Certificate of conformity
            The alarm device has been approved to be used in explosion-hazardous areas. The control unit and probe are
            approved according to ATEX Directive 94/9/EC. These approvals mean that the probes can be installed in Zone
            0, which is continuously explosion-hazardous.




HEAD OFFICE                  POSTAL                           EMAIL                           ABN                           spel.com.au
100 Silverwater Road         PO BOX 7138                      [email protected]               83 151 832 629
Silverwater NSW 2128         Silverwater NSW 2128

Page 74

            2.2        SPEL Puraceptor Sizing

            The sizing of the SPEL Puraceptor is based on the Rational Method that is common practice among water
            engineers to determine the treatment flow rate as a result of rainfall events. The geographical location of the
            site by means of its latitude and longitude figures is used along with the Intensity-Frequency-Duration (IFD) data
            provided by the Bureau of Meteorology to determine the amount of Rainfall Intensity relevant to the duration
            of time of concentration of the catchment area and 3 month ARI (Annual Recurrence Interval).


            2.3        SPEL Puraceptor Application Areas

            Typically, fuel stations have been required to install a blind sump to capture any hydrocarbon spills. A blind sump
            is effectively an underground tank that has no outlet. These sumps have been designed with an upstream
            drainage network to capture runoff from the under-canopy areas and the fill box used by tankers to refill
            underground tanks. These areas have traditionally been considered the “high-risk” areas for fuel spills, and so
            treatment measures have focussed on capturing and retaining runoff/spills from these areas for subsequent
            removal via vacuum truck. In reality, a hydrocarbon spill is a higher risk anywhere on a fuel station site in
            comparison to a residential catchment, for example. It is considered, therefore, that runoff from all areas of fuel
            stations should be treated. Where this becomes problematic with blind sumps, is that they provide no treatment
            and are simply capture systems. Therefore, they must be emptied each time they are full. In many cases, blind
            sumps fill with stormwater that occupies, and reduces, hydrocarbon volume should a spill occur. The solution is
            to implement a treatment system that can remove hydrocarbons from stormwater runoff, allowing treated
            water to escape, yet retain hydrocarbons and seal the system if a spill occurs. This is the function provided by
            the Puraceptor.


            2.4        Performance Analysis

            SPEL Puraceptor devices have undergone rigorous and comprehensive testing for total suspended solids, heavy
            metals and hydrocarbons. The reduction values listed within are from flow tests conducted by the University of
            South Australia Hydraulics Research Laboratory (UniSA) and at HR Wallingford United Kingdom.

            2.4.1      University of South Australia Testing – Oil & TPH
            Tests were performed at the UNISA Hydraulics Research facility with the device in flow mode, with the following
            results. Test methodology was done to European Standard BS EN 858.1 Section 8.3.

            The oily water mix compiled by the UniSA was specifically made to replicate service station runoff. This field
            testing illustrates that for an inflow of 5699 mg/l (5% over test target level of 5000 mg/l), which was expected
            to have deleterious effects on the performance of the unit, the SPEL Puraceptor was able to treat the runoff to
            a TPH concentration complying with the most stringent standards. This, highlights the conservative and rigorous
            character of the testing conducted by UniSA. As such, the Puraceptor is considered to qualify as a Class 1 light
            liquid separator in accordance with EN 858-1. Moreover it should be noted that Environmental Authorities



HEAD OFFICE                   POSTAL                        EMAIL                            ABN                          spel.com.au
100 Silverwater Road          PO BOX 7138                   [email protected]                83 151 832 629
Silverwater NSW 2128          Silverwater NSW 2128

Page 75

            worldwide regard less than 10 ppm as being the benchmark for no visible trace or sheen. Table 1 shows that
            discharge water quality reduction remains constant at <0.1ppm of TPH translating to `no visible trace` from a
            constant inflow concentration of 5,000ppm. The detail of the testing can be reviewed in Appendix 3.

            The Hydrocarbon mix used for the University of South Australia testing program was formulated to replicate the
            carbon fraction breakdown that we see in the field on service stations all over Australia. The NATA detection
            instruments detect all forms of hydrocarbon as in free phase, emulisified and dissolved fractions. The C6 – C9
            fraction represents the BTEX (Benzene, Toluene, Ethylbenzene, and Xylene) constituent of the mix.

            Table 1. - Reduction of Total Petroleum Hydrocarbons, UniSA



                                        Inflow                Outlet Samples TPH Fraction Concentrations    Calculated
               Hydrocarbon
                                EQL*    Concentration                                                       Mean
               Fraction
                                        (Total 5699.0)                                                      Concentration
                                                              1         2        3         4        5

               C6-C9            0.02    0.15                  <0.02     <0.02    <0.02     <0.02    <0.02   <0.02

               C10-C14          0.04    125.43                <0.04     <0.04    <0.04     <0.04    <0.04   <0.04

               C15-C28          0.10    5570.62               <0.1      0.162    <0.1      <0.1     <0.1    < 0.032

               C29-C36          0.1     3.42                  <0.1      <0.1     <0.1      <0.1     <0.1    <0.1
               * Detection Limit: Estimated Quantitation Limit Results expressed in mg/l



            Results show below detection levels of hydrocarbons of all carbon fractions except for C15-C28 with the level
            just above the EQL at 0.162ppm. This is still less than the 10ppm target.

            Independent Standard and Validation

            The British Standard and the independent validation applied to the SPEL Puraceptor™ separators provides the
            council the appropriate latitude to assess the product and the catchment design unencumbered by commercial
            partiality. Please refer to the test data in Appendix 3.




HEAD OFFICE                  POSTAL                          EMAIL                             ABN                          spel.com.au
100 Silverwater Road         PO BOX 7138                     [email protected]                 83 151 832 629
Silverwater NSW 2128         Silverwater NSW 2128

Page 76

            2.4.2      HR Wallingford Testing – Oil & TPH
            Tests were performed by HR Wallingford facility and at HR Wallingford UK with the device in flow mode, with
            the following results. Test methodology was done to European Standard BS EN 858.1 Section 8.3. The results
            are presented below.

            Table 2. – Test results of SPEL Separators, HR Wallingford

                        Separator Model                         Range                         Average effluent oil
                                                                                            concentration* (mg/L)
              NS4                                                                                     <0.1
              NS6                                             Puraceptor                              <0.1
              NS30                                                                                    0.5
              NSB8                                                                                    <0.1
              NSB10                                           Stormceptor                             0.7
              NSB30                                                                                   0.3
                *Average of five samples with the requirement that none has an oil concentration higher than 10mg/L.

            2.4.3      Australian Field Testing – Oil & TPH
            Grab samples have been collected from a number of installations across Australia immediately after rainfall
            events to compare the concentration of hydrocarbons in the inlet chamber to the outlet pipe. The results have
            been collated for Woolworths Bombaderry, Woolworths Lakewood and Woolworths Warner and are presented
            below.

            Flow-weighted, Event Mean Concentration (EMC) field testing has commenced at a Freedom Fuels Station on
            the Gold Coast and only 2 qualifying events have been recorded at present. This information will be released to
            industry once further events have been received and reported on by the independent research organisation.




HEAD OFFICE                  POSTAL                        EMAIL                          ABN                         spel.com.au
100 Silverwater Road         PO BOX 7138                   [email protected]              83 151 832 629
Silverwater NSW 2128         Silverwater NSW 2128

Page 77

            2.4.4      Woolworths Bomaderry
            The Caltex Woolworths Bomaderry Fuel station site is located on the Princes Highway, Bomaderry, NSW, 2541.
            The site is predominantly hardstand with a canopy over the refuelling area, some landscaped area to the rear of
            the site and a shop area. The SPEL Puraceptor is located in the north-eastern corner of the site, shown on Figure
            6 by a red dot.




                                     Figure 6. Woolworths Bomaderry site (shown by yellow line).

            The site layout is shown in Figure 7, with details of the drainage network and the alignment of the Puraceptor
            and Legal Point of Discharge. Grab samples were collected from the upstream access chambers to the
            Puraceptor (Locations 1 and 2, yellow dot) and from the treated downstream chamber of the Puraceptor
            (Location 3, green dot) as shown in Figure 8.

            The results of the water quality analyses are presented in Table 1. An evaluation of the percentage removal of
            the pollutant concentrations as the water passes through the Puraceptor is presented in Table 3, though it is
            recognised that the grab samples provide a snapshot of a single point in time.




HEAD OFFICE                   POSTAL                        EMAIL                            ABN                        spel.com.au
100 Silverwater Road          PO BOX 7138                   [email protected]                83 151 832 629
Silverwater NSW 2128          Silverwater NSW 2128

Page 78

                                     Figure 7. Location of Puraceptor on site plan.




                                                                        2
                                 1                                                          3




                              Figure 8. Section through Puraceptor showing sample points.




HEAD OFFICE            POSTAL                      EMAIL                          ABN              spel.com.au
100 Silverwater Road   PO BOX 7138                 [email protected]              83 151 832 629
Silverwater NSW 2128   Silverwater NSW 2128

Page 79

            Table 3. Water Quality Analysis results – Woolworths Bombaderry

                                                                                        Second
                                                                                       Chamber       Third
                                                                                          and       manhole
                                                                      First Chamber    manhole         (3)      Removal
                                           LOR          Unit         and manhole (1)      (2)       (Outlet)    Efficiency
                                                                                         S14-         S14-
              Report Reference                                          S14-Ap04581    Ap04582      Ma19519       (1)-(3)
              Total Recoverable Hydrocarbons - 1999 NEPM Fractions
              TRH C6-C9                          0.02   mg/L               6.9            5.6          0.16        97%
              TRH C10-C14                        0.05   mg/L              1400            530          0.08        99%
              TRH C15-C28                         0.1   mg/L              4900           1700          0.3         99%
              TRH C29-C36                         0.1   mg/L               4.5            1.6          <0.1       100%
              TRH C10-C36 (TOTAL)                 0.1   mg/L              6300           2200          0.4         99%


              BTEX
              Benzene                         0.001     mg/L              <.01            <.01       <0.001          -
              Toluene                         0.001     mg/L             0.039           0.035       <0.001       100%
              Ethylbenzine                    0.001     mg/L              0.24            0.23       <0.001       100%
              m&p-Xylenes                     0.002     mg/L               3.3            2.7         0.052        98%
              o-Xylene                        0.001     mg/L               1.9            1.7         0.037        98%
              Xylenes - Total                 0.003     mg/L               5.2            4.4         0.088        98%


              Total Recoverable Hydrocarbons - 2013 NEPM Fractions
              Napthalene                         0.02   mg/L              0.44            0.45        <0.02       100%
              TRH C6-C10                         0.02   mg/L               16              12          0.17        99%
              TRH C6-C10 less BTEX (F1)          0.02   mg/L               10             7.6          0.08        99%
              TRH>C10-C16                        0.05   mg/L              2900           1100          0.11        99%
              TRH>C10-C16           less
              Napthalene (F2)                    0.05   mg/L              2900           1100          0.11        99%
              TRH>C16-C34                         0.1   mg/L              3700           1300          0.3         99%
              TRH>C34-C40                         0.1   mg/L              <0.1            0.2          <0.1       100%



            2.4.5      Caltex-Woolworths - Lakewood.

            The Caltex Woolworths Lakewood Fuel station site is located at 108 Sirius Drive, Lakewood, NSW, 2443. The site
            is predominantly hardstand with a canopy over the refuelling area, some landscaped area to the rear of the site
            and a shop area. The SPEL Puraceptor is located in the south-western corner of the site, shown on Figure 9 by a
            red dot.




HEAD OFFICE                  POSTAL                            EMAIL                      ABN                            spel.com.au
100 Silverwater Road         PO BOX 7138                       [email protected]          83 151 832 629
Silverwater NSW 2128         Silverwater NSW 2128

Page 80

                                     Figure 9. Woolworths Lakewood site (shown by yellow line).




            Grab samples were collected on 11th July 2014, from the upstream access chambers to the Puraceptor (Location
            1, yellow dot) and from the treated downstream chamber of the Puraceptor (Location 2, green dot) as shown in
            Figure 10. Chemical analyses were performed by eurofins I mgt laboratories.




            The results of the water quality analyses are presented in Table 4. An evaluation of the percentage removal of
            the pollutant concentrations as the water passes through the Puraceptor is also presented in Table 3, though it
            is recognised that the grab samples provide a snapshot of a single point in time.




HEAD OFFICE                 POSTAL                          EMAIL                          ABN                        spel.com.au
100 Silverwater Road        PO BOX 7138                     [email protected]              83 151 832 629
Silverwater NSW 2128        Silverwater NSW 2128

Page 81

                                          1                                                         2




                                      Figure 10. Section through Puraceptor showing sample points.

            Table 4. Water Quality Analysis results – Woolworths Lakewood

                                                                             Inlet (1)     Outlet (2)        Removal
              Report Reference                LOR          Unit            S14-Jl11277    S14-Jl11278     Efficiency (%)
              Total Recoverable Hydrocarbons - 1999 NEPM Fractions
              TRH C6-C9                             0.02   mg/L              16000            0.3             100%
              TRH C10-C14                           0.05   mg/L               1700           < 0.05           100%
              TRH C15-C28                            0.1   mg/L              14000            0.3             100%
              TRH C29-C36                            0.1   mg/L               150            < 0.1            100%
              TRH C10-C36 (TOTAL)                    0.1   mg/L               0.18           < 0.02           94%
              Total Recoverable Hydrocarbons - 2013 NEPM Fractions
              Naphthalene                           0.02   mg/L              < 0.02          < 0.02             -
              TRH C6-C10                            0.02   mg/L               5900           < 0.05           100%
              TRH C6-C10 less BTEX (F1)             0.02   mg/L               5900           < 0.05           100%
              TRH>C10-C16                           0.05   mg/L              10000            0.3             100%
              TRH>C10-C16             less
              Naphthalene (F2)                      0.05   mg/L                87            < 0.1            100%
              TRH>C16-C34                            0.1   mg/L               0.25            0.04            84%
              TRH>C34-C40                            0.1   mg/L               0.15            0.04            73%

              Suspended Solids                        5    mg/L               3400            7.5             100%
              Total Phosphorous                     0.01   mg/L               0.34            0.02            94%
              Total Nitrogen Set (as N)
              Nitrate & Nitrite (as N)              0.01   mg/L              < 0.01          < 0.01             -
              Total Kjeldahl Nitrogen (as
              N)                              0.1          mg/L                9.8            0.2             98%
              Total Nitrogen (as N)           0.1          mg/L                9.8            0.2             98%




HEAD OFFICE                  POSTAL                               EMAIL                  ABN                         spel.com.au
100 Silverwater Road         PO BOX 7138                          [email protected]      83 151 832 629
Silverwater NSW 2128         Silverwater NSW 2128

Page 82

            2.4.6      Caltex Woolworths - Warner
            The Caltex Woolworths Warner Fuel station site is located at the NW corner of the intersection between Old
            North Rd and Samsonvale Rd, Warner, QLD. The site is predominantly hardstand with a canopy over the
            refuelling area, some landscaped area to the site boundaries and a shop area. The SPEL Puraceptor is located in
            the north-eastern portion of the site, shown on Figure 11 by a red dot.




                                     Figure 11. Woolworths Warner site (shown by yellow line).

            Grab samples were collected on 28 th November 2014, immediately after a rain event. Samples were collected
            from the upstream access chambers to the Puraceptor (Location 1, yellow dot) and from the treated
            downstream chamber of the Puraceptor (Location 2, green dot) as shown in Figure 12. Chemical analyses were
            performed by ALS Environmental NATA registered laboratories.




HEAD OFFICE                  POSTAL                        EMAIL                          ABN                         spel.com.au
100 Silverwater Road         PO BOX 7138                   [email protected]              83 151 832 629
Silverwater NSW 2128         Silverwater NSW 2128

Page 83

            The results of the water quality analyses are presented in Table 4. An evaluation of the percentage removal of
            the pollutant concentrations as the water passes through the Puraceptor is also presented in Table 5, though it
            is recognised that the grab samples provide a snapshot of a single point in time.




                                        1                                                          2




                                    Figure 12. Section through Puraceptor showing sample points.

            The ALS Environmental Lab reports are presented in the Appendix. Samples 1 and 4 were collected with the
            standard sampling method. An experimental method was used for Samples 2 and 3 to determine whether it
            influenced the outcome of analyses, and has subsequently been discontinued.




HEAD OFFICE                 POSTAL                          EMAIL                          ABN                        spel.com.au
100 Silverwater Road        PO BOX 7138                     [email protected]              83 151 832 629
Silverwater NSW 2128        Silverwater NSW 2128

Page 84

            Table 5. Water Quality Analysis results – Woolworths Warner

                                                                          Inlet (1)          Outlet (2)          Removal
              Report Reference               LOR        Unit           EB1447371001        EB1447371004       Efficiency (%)
              EP075(SIM)B: Polynuclear Aromatic Hydrocarbons
              Naphthalene                          1    µg/L               <1.0                 <1.0                ND
              Acenaphthylene                       1    µg/L               <1.0                 <1.0                ND
              Acenaphthene                         1    µg/L               <1.0                 <1.0                ND
              Fluorene                             1    µg/L               <1.0                 <1.0                ND
              Phenanthrene                         1    µg/L               <1.0                 <1.0                ND
              Anthracene                           1    µg/L               <1.0                 <1.0                ND
              Fluoranthene                         1    µg/L               <1.0                 <1.0                ND
              Pyrene                               1    µg/L               <1.0                 <1.0                ND
              Benz(a)anthracene                    1    µg/L               <1.0                 <1.0                ND
              Chrysene                             1    µg/L               <1.0                 <1.0                ND
              Benzo(b+j)fluoranthene               1    µg/L               <1.0                 <1.0                ND
              Benzo(k)fluoranthene                 1    µg/L               <1.0                 <1.0                ND
              Benzo(a)pyrene                      0.5   µg/L               <0.5                 <0.5                ND
              Indeno(1.2.3.cd)pyrene               1    µg/L               <1.0                 <1.0                ND
              Dibenz(a.h)anthracene                1    µg/L               <1.0                 <1.0                ND
              Benzo(g.h.i)perylene                 1    µg/L               <1.0                 <1.0                ND
              Sum of polycyclic aromatic
              hydrocarbons                        0.5   µg/L               <0.5                 <0.5                ND
              Benzo(a)pyrene TEQ (zero)     0.5     µg/L                   <0.5                 <0.5                ND
              EP080/071: Total Petroleum Hydrocarbons

              C6 - C9 Fraction               20         µg/L               <20                   <20                ND
              C10 - C14 Fraction             50         µg/L                60                   <50              100%
              C15 - C28 Fraction             100        µg/L               370                  <100              100%
              C29 - C36 Fraction             50         µg/L               200                   <50              100%
              C10 - C36 Fraction (sum)       50         µg/L               630                   <50              100%
              Total Recoverable Hydrocarbons - 2013 NEPM Fractions
              Naphthalene                    20         µg/L               <20                   <20                ND
              TRH C6-C10                     20         µg/L               <20                   <20                ND
              TRH C6-C10 less BTEX (F1)      100        µg/L               <100                 <100                ND
              TRH>C10-C16                    100        µg/L               510                  <100              100%
              TRH>C10-C16             less
              Naphthalene (F2)               100        µg/L               <100                 <100                ND
              TRH>C16-C34                    100        µg/L               510                  <100              100%
              TRH>C34-C40                    100        µg/L               <100                 <100                ND



            2.4.7      Freedom Fuels - Southport
            The Freedom Fuels station site is located at the intersection between Smith Street and Curtin Avenue, Southport,
            QLD. The site is predominantly hardstand with a canopy over the refuelling area, some landscaped area to the
            site boundaries and a shop area. The SPEL Puraceptor is located in the north-western portion of the site, shown
            on Figure 13 by a red dot.



HEAD OFFICE                  POSTAL                            EMAIL                      ABN                            spel.com.au
100 Silverwater Road         PO BOX 7138                       [email protected]          83 151 832 629
Silverwater NSW 2128         Silverwater NSW 2128

Page 85

                                        Figure 13. Freedom Fuels site (shown by yellow line).

            Flow-weighted samples were collected with an automated monitoring installation from two rainfall events on
            2nd April 2015 and 29th April 2015. Samples were collected from the upstream inlet to the Puraceptor (Location
            1, yellow dot) and from the treated outlet of the Puraceptor (Location 2, green dot) as shown in Figure 14.
            Chemical analyses were performed by GCCC Analytical Services, NATA registered laboratories.




            The results of the water quality analyses are presented in Table 5. An evaluation of the percentage removal of
            the pollutant concentrations as the water passes through the Puraceptor is also presented in Table 6, though it
            is recognised that further results are required in the monitoring program. As can be seen from the results in
            Table 6, there are no outflow hydrocarbon concentrations exceeding 10ppm.




HEAD OFFICE                 POSTAL                         EMAIL                          ABN                         spel.com.au
100 Silverwater Road        PO BOX 7138                    [email protected]              83 151 832 629
Silverwater NSW 2128        Silverwater NSW 2128

Page 86

                          1
                                                                                                               2




                                     Figure 14. Section through Puraceptor showing sample points.

            Table 6. Water Quality Analysis results (values exceeding 10ppm highlighted in yellow)

                                                     LOR   Unit   Inlet (1)   Outlet (2)    Inlet (1)   Outlet (2)

              Report Reference                                    2/4/15      2/4/15        29/4/15     29/4/15

              EP080/071: Total Petroleum Hydrocarbons

              C6 - C9 Fraction                       20    µg/L   <20         <20           90          60

              C10 - C14 Fraction                     50    µg/L   220         <50           1890        110

              C15 - C28 Fraction                     100   µg/L   2540        500           11000       470

              C29 - C36 Fraction                     50    µg/L   380         100           200         70

              C10 - C36 Fraction (sum)               50    µg/L   3140        600           13090       650

              Anionic Surfactants as MBAS            0.5   µg/L   8           1             1           0.4

              Non-ionic Surfactants as CTAS          0.5   µg/L   <0.5        <0.5          <0.5        <0.5

              Efficiency Ratio (%)

              C6 - C9 Fraction                                                                          30%

              C10 - C14 Fraction                                                                        94%

              C15 - C28 Fraction                                                                        93%

              C29 - C36 Fraction                                                                        71%

              C10 - C36 Fraction (sum)                                                                  92%

              Anionic Surfactants as MBAS                                                               84%

              Non-ionic Surfactants as CTAS                                                             ND




HEAD OFFICE                   POSTAL                       EMAIL                           ABN                       spel.com.au
100 Silverwater Road          PO BOX 7138                  [email protected]               83 151 832 629
Silverwater NSW 2128          Silverwater NSW 2128

Page 87

            The Freedom Fuels site is being monitored in accordance with an agreed protocol formulated with Griffith
            University, and will continue until 15 qualifying events have been analysed. The present data will need to be
            supplemented before it can be considered to comply with the Healthy Waterways Water by Design guidelines.



            3.0        Maintenance Procedures
            The Maintenance Programme will be kept on the premises at all times, with a ledger recoding all maintenance
            and inspection activities. This will provide a useful and efficient record for Inspection officers to facilitate random
            verification. Maintenance is performed at a minimum of every six months or if the probe alarm is activated, by
            eduction method (suction). The Inspection and Maintenance guideline in Appendix 5 better elaborates the
            procedures.




                                                    Figure 15. Maintenance Schematic.




            3.1        Coalescer Unit

            Use the lifting handle or the chain and lift the Coalescer unit out of the tank and place it near the Puraceptor™,
            in a retained area so pollutants do not escape.


            3.2        Coalescer Foam

            Remove the coalescer foam insert, and wash with normal water pressure ensuring the dirty water runs into the
            SPEL Puraceptor™.




HEAD OFFICE                  POSTAL                           EMAIL                            ABN                            spel.com.au
100 Silverwater Road         PO BOX 7138                      [email protected]                83 151 832 629
Silverwater NSW 2128         Silverwater NSW 2128

Page 88

            3.3        Vacuum removal of Fuel & Silt

            Vacuum the retained oil from both chambers of the SPEL Puraceptor™ and then the silt deposited on the bottom,
            leaving sufficient water to ensure the (auto closure device) ACD remains floating.


            3.4        Vacuum removal of Complete Contents (If Necessary)

            If the quantity of pollutants exceeds recommended level, the complete contents of the Puraceptor™ may need
            to be removed. After full eduction, remove the ACD. Using a pole with a hook, lift out the ACD using the lifting
            eye on the float.


            3.5        Re-insert Coalescer Unit and ACD

            Re-insert the foam coalescer insert into the stainless steel Coalescer unit and re-insert the Coalescer unit into
            the Puraceptor™ as provided with the SPEL lifting/location/locking system. Partially fill the Puraceptor with clean
            water (if necessary) to ensure the ACD when re-inserted remains floating and then re-insert the ACD. Finally
            check the ACD is floating and the retaining cap has been replaced to safeguard against its removal by
            unauthorized persons, unless depth of tank precludes doing so from ground level.


            3.6        SPEL Automatic Alarm/Monitoring System

            The SPEL automatic alarm/monitoring system probe should be lifted out of the probe protection tube, wiped
            clean and re-inserted. The system should now be reset according to instructions.

            All of these Maintenance Processes are illustrated in Figure 16.




HEAD OFFICE                 POSTAL                          EMAIL                           ABN                           spel.com.au
100 Silverwater Road        PO BOX 7138                     [email protected]               83 151 832 629
Silverwater NSW 2128        Silverwater NSW 2128

Page 89

                        Figure 16. Maintenance process relevant to SPEL Puraceptor components




HEAD OFFICE            POSTAL                     EMAIL                        ABN              spel.com.au
100 Silverwater Road   PO BOX 7138                [email protected]            83 151 832 629
Silverwater NSW 2128   Silverwater NSW 2128

Page 90

            4.0        Conclusion
            The SPEL Puraceptor is a tested and proven hydrocarbon treatment measure for fuel stations. It effectively
            replaces a blind sump whilst maintaining a hydrocarbon discharge level acceptable under BS/EN858.1.2006. The
            Auto-closure device, integral to the Puraceptor, and the Oil Alert probe are fail-safe measures that ensure that,
            should a spill occur, it will be retained within the Puraceptor and the operator alerted to the need for immediate
            maintenance. In the light of this evidence, it is considered that the Puraceptor is a superior solution than the
            current blind sump specification.




HEAD OFFICE                 POSTAL                          EMAIL                           ABN                          spel.com.au
100 Silverwater Road        PO BOX 7138                     [email protected]               83 151 832 629
Silverwater NSW 2128        Silverwater NSW 2128

Page 91

            5.0        References
            The information presented herein has been prepared with reference to the following:

                1.     Department of Environment and Resource Management 2009, Monitoring and Sampling Manual,
                       September 2009.
                2.     Department of Environment and Resource Management 2009, Queensland Water Quality Guidelines
                       September 2009.
                3.     Australian and New Zealand Environment and Conservation Council (ANZECC) (2000). Australian and
                       New Zealand guidelines for fresh and marine water quality. ISBN 09578245 0 5.
                4.     AMSA. 2003. Oil Spill Monitoring Handbook. Prepared by Wardrop Consulting and the Cawthron
                       Institute for the Australian Maritime Safety Authority (AMSA) and the Marine Safety Authority of New
                       Zealand (MSA). Published by AMSA, Canberra.
                5.     Department of Urban Affairs and Planning (DUAP) (1992a). Guidelines for Hazard Analysis: Hazardous
                       Industry Planning Advisory Paper No. 4.
                6.     Environment Australia (1998). Best Practice Environmental Management in Mining: Dust Control.
                       Environment Australia, Department of the Environment, 1998
                7.     Department of Environment and Resource Management (2009) Urban stormwater – Queensland best
                       practice environmental management guidelines. Technical Note: Derivation of Design Objectives.
                       Prepared by AECOM (Ecological Engineering Practice Area).
                8.     Department of Environment and Resource Management (2009) Monitoring and sampling manual 2009
                       Version 1, September 2009
                9.     Engineers Australia 2006, Australian Run-off Quality – A guide to water sensitive urban design




HEAD OFFICE                   POSTAL                         EMAIL                          ABN                         spel.com.au
100 Silverwater Road          PO BOX 7138                    [email protected]              83 151 832 629
Silverwater NSW 2128          Silverwater NSW 2128

Page 92

            6.0        List of Appendices
            Appendix 1 – British Standard BS EN 858

            Appendix 2 – Oil Alert Technical Settings and Operation & Maintenance Manual

            Appendix 3 – UniSA Lab Tests & Independent Validations

            Appendix 4 – HR Wallingford testing

            Appendix 5 – Field test results (Australia)




HEAD OFFICE                POSTAL                 EMAIL               ABN              spel.com.au
100 Silverwater Road       PO BOX 7138            [email protected]   83 151 832 629
Silverwater NSW 2128       Silverwater NSW 2128

Used in these records

About this file

File size
9.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

F0002-AA007595-AAR-09-SMP.PDF · 9.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.