Council archive · source document
F0002-AA007595-AAR-09-SMP · MCU14/0102.05
Attached to the e-mail Updated SW management plan MCU14/0102.05.
Puraceptor system to treat stormwater runoff in the Fuel Dispensing Area. Independent testing on the SPEL systems concluded the following removal efficiencies: 97% Total Suspended Solids (TSS) 100% >5mm Gross Pollutant Solids (GP) 99.9% of light liquids (TPH) (certified discharge quality of 5ppm or less) >30% particulate specialisation of phosphorous and nitrogen. <0.1mg/L hydrocarbon content (minimum requirement is 10mg/L) A risk assessment has been completed by SPEL proposing to use a P.070.S.C1.2C Puraceptor for the site. The risk assessment has been included in Appendix J. The Puraceptor tank and associated infrastructure is to be installed prior to the stormwater infrastructure discharging to Council assets. CONSTRUCTION PHASE WATER QUALITY An Erosion Hazard Assessment has been carried out for the proposed development – refer to Appendix I for a copy of the completed Noosa Council form. As a result of this assessment, it was determined that the site is a ‘low’ risk. During the construction phase of the development, an Erosion and Sediment Control Program (ESCP) will need to be implemented to minimise water quality impacts. A detailed Erosion and Sediment Control Program will be employed throughout the site. Details of the ESCP measures shall be provided on the operational engineering drawings for the site earthworks and civil engineering works. The contractor shall be responsible for the provision of the construction phase water quality objectives which shall be enforced by the preparation and implemention of an Erosion and Sediment Control Program. The ESCP shall be provided to all people involved with the construction, including sub- contractors, private certifiers and regulators. These guidelines will be formed in accordance with the Healthy Waterways Fact Sheet ‘Erosion and Sediment Control Management Plans’ and the ‘Best Practice Erosion and Sediment Control Guidelines.’
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
F0002-AA007595-AAR-09-SMP.PDFRelated documentApplication case desk ↗
About this file
- File size
- 9.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.