Council archive · source document
Compiled Approved Plans MCU15-0023.02 · MCU15/0023.02
Plans and drawings: the text below has words only, no drawings.
Original PDF page 10, section 3. The text section number identifies this passage in the reader.
at
.4
.2
23,432 23,275 23,100 CORRIDOR
specified rates of dilution as recommended in the Queensland Government Dept of Ag, Fisheries & Foresty Sphangneticola trilobata fact sheet.
5
23
19
3
.8
A: 6.60 m2
Repeat sprays should be carried out over the regrowth period to ensure the weed is completely eradicated before any construction works CONCRETE DRIVEWAY
0"
.5
8
19
commence on the site. Complete eradication is essential because Sphagneticola will regrow from the smallest cutting. Where the species
STORMWATER
COAT TOW 19,300 TOW 18,500 Sphagneticola
23
.1
DETENTION UNDER
T01 GARAGE FLOOR
BINS D KITCHEN trilobata
F
occurs on the sloped area of the site it should be sprayed but not physically removed but covered with erosion control matting (see below) to STORE
20
POWDER A: 10.92 m2
STORAGE
W
LAUNDRY
maintain slope stability. A: 6.51 m2
A: 2.49 m2 A: 3.10 m2
22,025 20,872 19,303 18,330
3. Appropriate chemical control is recommended for the general removal of other groundcover weeds on the site.
Conc. Drive
BALCONY OVER
PANTRY DINING
4. Weed tree species or trees marked for removal are to be removed by either mechanical or manual control (use of saws, chainsaws etc) whichever SHOWER A: 7.88 m2 A: 21.34 m2 02
is the most appropriate according to size, species and location. The cut and paint method of removal should be used wherever trees occur on the A: 2.42 m2 EXISTING TREE
sloped area so that stabilisation root systems remain in place. LAWN TO BE RETAINED
19
6
OUTLINE OF APPROVED PROJECT GARAGE Refer to Existing Tree Schedule
.1
SHOWN DASHED IN RED A: 35.76 m2
STORAGE 21,762
SLOPE STABILISATION
24
A: 14.54 m2
1. It is proposed that stabilisation of the steeper eastern section of the site be carried out in conjunction with the weed eradication programme so that
STORAGE
EXISTING TREE
the site is not left bare of vegetation. It is proposed that immediately after eradication of the Sphagneticola, or as soon as practicably possible, EXISTING TREE
01 PROPOSED FOR REMOVAL
erosion control matting be installed on the sloped section of the site. Matting options include: OR TRANSPLANTATION
0
LINE
.0
2
Refer to Existing Tree Schedule
Spread & Location of Vegetation Species Currently on Site
.7
Sewer UG
T05
24
Heavy Weight Jute Matting (approx 1300gsm): appropriate for sand dune stabilisation. To be fastened with 300mm pins. Pre-slit for planting
4
23
T04
G
Heavy Weight Coir Matting (approx 900gsm): also resistant to high winds in coastal locations. To be fastenied with 300mm pins
UILDIN
87
iling fence 20.
51
The matting remains in place during and after planting & will continue to stabilise the slope and support plant growth for several years.
TAL B
C 18/5/15 Revision RHB
DRAINAGE 58
358¡50'20"
B 24/3/15 Revision RHB
9
COAS
8
.8
RP81810
.4
1. Please refer to Hydraulic Engineer's (BE Collective) Erosion & Sediment Control Plan drawing No. 6532 C201 for detail on the temporary protective
15.158
42 Seaview Terrace A 12/3/15 Preliminary RHB
19
19
drainage meaures to be undertaken during building and pool construction.
RP81810
5
TWO STOREY RESIDENCE REVISION DATE REVISION NOTE BY
.3
2. Silt fencing will be used to prevent pollutants from leaving the site during construction of the landscape. Silt fencing to be pegged geotextile along
23
the eastern boundary, together with, if necessary, additional sediment controls such as coir logs.
INDICATIVE PLANT LIST
'10"
3. Refer to Hydraulic Engineer's (BE Collective) Stormwater Management Plan drawing No. 6532 C200 for permanent drainage infrastructure to be
13.995
THE BUILDER IS RESPONSIBLE FOR THE SETTING OUT OF THE WORKS, THE
installed on site. As set out in Note 3.8 of that Plan, sub-soil drains will be installed to the rear of all retaining walls which will drain to the infiltration CHECKING OF ALL DIMENSIONS AND LEVELS ON SITE, AND THE REPORTING
trench marked on that plan.
2 ID Latin Name Common Name Pot Size Mature Height Mature Spread
1200 Timber pa
.6 OF ANY DISCREPANCIES TO THE PROPRIETOR PRIOR TO COMMENCEMENT OF
195¡20
TREES
19
WORK. DO NOT SCALE FROM DRAWINGS.
4
GROUNDCOVER & SMALL UNDERSTOREY PLANTING DENSITY B.in Banksia integrifolia Coastal Banksia 45L 7 - 10m 3.5 - 6m
.7
B.se Banksia serrata Old Man Banksia 45L 8 - 10m 5 - 6m
1. Groundcovers will be planted at an approximate density of 10 per square metre. Small understorey planting will be carried out at densities
18
PROJECT
E.eu Elaeocarpus eumundii Quandong 45L 5 - 10m 2.0 - 3.5m
1
between 2-10 per square metre depending on size and spread at maturity:
5
3
Proposed Alterations & Additions
.0
.6
H.tr Hibiscus tiliaceus Bronze Cottonwood 75L 6 - 8m 5 - 7m
.9
Viola hederacea x 10 per square metre
0
23
22
P.pe Pandanus tectorius Screw Pine ground dug 5 - 10m 2.0 - 3.5m
.6
22
Carpobrotus glaucescens x 10 per square metre Not to be used
6
T.lu Tristaniopsis laurina 'Luscious' Water Gum 100L 8 - 10m 6 - 8m
22
.1
Dianella congesta x 10 per square metre ADDRESS
SHRUBS
23
Isolepsis nodosa x 5 per square metre
B.ro Banksia oblongifolia Dwarf Banksia 200mm 1.5 - 3.0m 1.2 - 2.5m
Lomandra longifolia x 2 per square metre Trunk Protection:
9 B.vd Baeckea frutescens Weeping Baeckea 140mm 1.0 - 8.0m 1.0 - 5.0m 44 Seaview Terrace, Sunshine Beach
0
.8
0
Install to maximum height
6
.6
L.le Leptospermum laevigatum Coast Tea-Tree 200mm 1.5 - 3m 1.2 - 2.0m
6
.3
permitted by lowest branches
.1
17
SOILWORKS & PLANTING
.1
20
R.ex Randia chartacea Narrow-leafed Gardenia 300mm 1.5 - 3m 1.2 - 2.0m
1
CLIENT
23
2
23
8
INSTALL & MAINTAIN
7
.9
8
23
X.gl Xanthorrhoea johnsonii Grass Tree 300mm 0.9 - 1.5m 0.9 - 1.2m
.1
2
1
1. PLANTER BOX PREPARATION:
5
TREE PROTECTION ZONE
.6
.2
EXISTING TREE TO BE RETAINED:
.7
Catherine Bastock & Robert Mead
.9
22
.5
AS SPECIFIED
.9
REFER TO TREE SCHEDULE
GROUNDCOVERS
22
6
- All structures, waterproofing & drainage connections to be installed by Head Contractor (Builder).
22
23
21
TO RADII AS SHOWN
1800 timber pailing fence
.9
21
22
20
0 B.pa Baloskion pallens Didgery Sticks 140mm 0.9 - 1.5m 0.9 - 1.2m
ON SCHEDULE
23 - Landscape Contractor to install a layer of corflute plastic board over all membrane surfaces, and tape in place, prior to installation of drainage
23
1
1
Tree Protection Zone
Overhead Po
17
.3
.0
C.gl Carpobrotus glaucescens Pigface 140mm 0.0 - 0.3m 1.2 - 2.0m
39.228
Edge Bitu
(radius from trunk)
cell. PERMISSIBLE WORKS
DRAWING
x
21
19
19 19
WITHIN TPZ: D.co Delosperma cooperi Ice Plant 140mm 0.0 - 0.3m 1.2 - 2.0m
- Landscape Contractor to supply & install drainage cell, filter fabric, sand layer & soilmixes as detailed on this plan, Detail 2, LC01.
22
- One incursion of no greater
- Install soilmixes to depths and levels as detailed, or as otherwise directed by Head Contractor. 276¡22'50" 20% than 20% of the total TPZ area
- Do not cut roots greater than
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Compiled Approved Plans MCU15-0023.02.pdfRelated documentApplication case desk ↗