Skip to the record
Search everything, all in one place.

Council archive · source document

Response to Information Request 10-6-2025 Traffic management plan · OPW25/0042

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Traffic Management Plan – 25040286

   9.2 Emergency Services

Emergency services shall be notified of the proposed works nature, location, date and times as well as contact
details for the site supervisor.

On-site traffic controllers will be equipped with mobile communications to advise and/or liaise with emergency
services to ensure a prompt response should the need arise.

   9.3 Dangerous Goods

Should any incident arise involving vehicles transporting dangerous goods, all work shall cease immediately,
machinery and vehicles turned off and the area cleared of personnel as soon as possible. Traffic Controllers
(and other personnel if necessary) shall be deployed immediately to ensure no traffic or other road users
approach the area.

Emergency services shall be notified of the proposed works nature, location, date and times as well as contact
details for the site supervisor. All site personnel shall be briefed on evacuation and control procedures.

   9.4 Damage to Services

In the event that gas services are damaged, all work shall cease immediately, machinery and vehicles turned
off and the area cleared of personnel as soon as possible. Traffic Controllers (and other personnel if
necessary) shall be deployed immediately to ensure no traffic or other road users approach the area. The
Police Service and relevant supply authority shall be called immediately. Damage to any other services shall
be treated in a similar manner except machinery may remain operational and access may be maintained
where it is safe to do so.

All site personnel shall be briefed on evacuation and control procedures.

   9.5 Failure of Services

   9.5.1   Failure of Traffic Signals

In the event that traffic signal infrastructure near the worksite is damaged or fails to operate correctly, all work
shall cease immediately and DTMR Network Operation Centre (TMC) shall be notified immediately (phone 13
90 40). Brisbane Metropolitan Transport Management Centre (BMTMC)

   9.5.2   Failure of Street Lighting

In the event that street lighting is damaged and fails to operate or operates incorrectly, Traffic Controllers (and
other personnel, if necessary, with appropriate temporary lighting) shall be deployed immediately if the lighting
failure adversely affects road user safety to control traffic movements as required. (BMTMC) shall be notified
immediately.

   9.5.3   Failure of Power

In the event that power infrastructure is damaged and poses a risk through live current, Traffic Controllers (and
other personnel if necessary) shall be deployed immediately to secure the site and prevent entry to the area
affected by live power. Energex/Ergon shall be notified immediately.




                Document MSF-AT-TMP-001| Issued 05 September 2024| Review: 05 September 2025| Owner: Trevor Leggett | Page: 38
                                       [UNCONTROLLED IF WHEN PRINTED AFTER 05 September 2024]

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to Information Request 10-6-2025 Traffic management plan.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.