Traffic Management Plan – 25040286

   1. INTRODUCTION
   1.1 Purpose and Scope

This Traffic Management Plan (TMP) outlines the traffic control and traffic management procedures to be
implemented by CML Investments to manage potential hazards associated with the traffic environment during
the project.

The project involves Trucks turning with hold and release for Tree Clearing And Bulk Excavation job at
Serenity Close, Noosa Heads

   1.2 Objective and Strategies

The objectives of the Traffic Management Plan are to ensure:

 • The safety of the road workers.

 • All road users, including vulnerable road users, are safely guided around, through or past the work site.

 • The performance of the road network is not unduly impacted and the disruption and inconvenience to all

   road users are minimised for the duration of the works.
 • Impacts on users of the road reserve and adjacent properties and facilities are minimised.

In an effort to meet these objectives the Traffic Management Plan will incorporate the following strategies:

 • Providing a sufficient number of traffic lanes to accommodate vehicle volumes.

 • Ensuring delays are minimised.

 • Ensuring all road users are managed including motorists, pedestrians, cyclists, people with disabilities and

   people using public transport.
 • Ensuring work activities are carried out sequentially to minimise adverse impacts.

 • Provision will be made for works personnel to enter the work area in a safe manner in accordance with safety

   procedures.
 • All entry and exit movements to and from traffic streams shall be in accordance with the requirements of safe

   working practices.



   1.3 Engagement

CMI Investment have engaged AVADA Traffic TMR Registration 0403 to prepare this Traffic Management
Plan and associated controls for the works.

The TMP will be implemented by AVADA Traffic TMR Registration 0403




               Document MSF-AT-TMP-001| Issued 05 September 2024| Review: 05 September 2025| Owner: Trevor Leggett | Page: 5
                                      [UNCONTROLLED IF WHEN PRINTED AFTER 05 September 2024]

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to Information Request 10-6-2025 Traffic management plan.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.