Council archive · source document
Response to Information Request 10-6-2025 Traffic management plan · OPW25/0042
Plans and drawings: the text below has words only, no drawings.
Traffic Management Plan – 25040286
ITEM DESCRIPTION
Hours / Days of Work 9 hrs
Duration of Work 07:00 to 16:00
Other Constraints None
Concurrent/adjacent Works or No other works identified at this location
Projects
Contacts & Details
2.3 Existing Traffic and Road Environment
ITEM DESCRIPTION
Existing road configuration Two-way Divided
Existing pedestrian / cyclist facilities Footpath Existing near working Area and no Cycle lanes
at the working area
2.4 Community Considerations
ITEM DESCRIPTION
Sporting Venues N/A
Cultural Venues Pinaroo Park
Educational Institutions N/A
Medical Centres N/A
Shopping Complexes Noosa Junction K Hub
Entertainment Precincts Noosa Reef Hotel
Document MSF-AT-TMP-001| Issued 05 September 2024| Review: 05 September 2025| Owner: Trevor Leggett | Page: 7
[UNCONTROLLED IF WHEN PRINTED AFTER 05 September 2024]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request 10-6-2025 Traffic management plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.