TARGET FOUNDATION SOIL
ALL FOOTINGS TO BE FOUNDED 300 INTO NATURAL DILAPIDATION REPORT:
SANDTSTONE WITH A MINIMUM ALLOWABLE BEARING
CAPACITY OF 300kPa TO BE CONFIRMED VIA
GEOTECHNICAL TESTING, DEEPEN FOOTINGS AS
REQUIRED TO ACHIEVE THIS LAYER
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
1.73
1. Title:
Project
Date: Drawn Design
FALL
Drg No. Rev.
Rev. - 10.06.16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20220109 - SCG 31158-SD-Issue 2- 20.02.2023.pdfRelated documentApplication case desk ↗
20220109 - 21 Maher Tce, Sunshine Beach - Construction of Detached Dwelling and Swimming - SCG 31158-SD-Issue 2- 20.02.2023.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.