Council archive · source document
20220109 - SCG 31158-SD-Issue 2- 20.02.2023 · OPW23/0182
Attached to the e-mail Operational Works Application OPW23/0182 - 21 Maher Tce, Sunshine Beach QLD 4567 (Email 2 of 4).
N_A N_B N_C N_D
E_A
E_B
S_
A
E_C
S_
B
E_D
S_
C
E_E
THIS DRAWING AND ASSOCIATED DETAILS
E_F
MUST BE READ IN CONJUNCTION WITH
THE NOTES CONTAINED ON 31158-N.
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title:
Project
Date: Drawn Design
Drg No. Rev.
Rev. - 10.06.16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20220109 - SCG 31158-SD-Issue 2- 20.02.2023.pdfRelated documentApplication case desk ↗
20220109 - 21 Maher Tce, Sunshine Beach - Construction of Detached Dwelling and Swimming - SCG 31158-SD-Issue 2- 20.02.2023.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.