SEDIMENT & EROSION CONTROL CHECK LIST SEDIMENT CONTROL LEGEND:
~ | | MANAGEMENT COMMITMENT AAAAS SEDIMENT FENCE TO DETAIL
N OBJECTIVE / TARGET Comply with all statutory regulations and maintain — _pIrEcTION oF FLow
them during earthworks/construction. cy
| | Comply with the erosion and sediment control plan. $ TWO-THREE SAND BAGS TO FORM A VEE CHECK DAM
MANAGEMENT STRATEGY | Site foreman to identify and check direction of storm water AT 10m CENTRES ALONG NEW TABLE DRAIN
land flows as shown on plan. Provide barriers and other ¢
measures shown on the plan to intercept storm water flows
at the end of table drains, and intercept sediments TEMPORARY SITE ACCESS TO IECA STD DWG ESC-01
before reaching gullies.
TASKS / ACTIONS Erect sedimentation barriers as shown on the plans —°——~_ SILT CURTAIN TO IECA STD DWG IECA FSC-01_03
before commencing earthworks or drainage improvements.
Place rock weirs in table drains as soon as the drains HHH BUND STAGE 170 DETAIL ON SHEET 015
are cut.
PERFORMANCE INDICATORS | Site foreman to check that sediment fence and rock weirs
are trapping the flows after rain. Ensure no bypass occurs. a | DE-WATERING PUMP WITH HOSE AND
FREQUENCY / DEADLINE Site foreman shall monitor performance and repair damage DE-SILTING BAG, AS REQUIRED
after every storm until grass is established. Sediment shall
be removed before it reaches overflow level
RESPONSIBLE PERSON The Principal Contractors foreman shall be
© y Ne. responsible for inspections.
S SS . a - Lf es iN ‘ REPORTING / REVIEW Site Foreman to advise workers: if they notice any COIR LOG FILTER DAM INSTREAM TO IECA LOG-01
a SSS NG 7 iia barrier requiring repair, report it to foreman. Ra RECESS LOG 4 DIA INTO THE GROUND
SE % CUE A CORRECTIVE ACTIONS Site foreman is to repair any damaged barriers
yay daily. Replacements are to be purchased ined
oy i; aily. Replacements are to be purchased as require
SK
By
2,
Ly)
go iy coe STRAINER WIRE
/ “ - +> [-}— TOP & BOTTOM
Lo wae |______—-FILTER FABRIC FIXED TO FENCE
7 Tena) t AND EMBEDDED INTO
~-4 eM WL 0.5 GROUND MIN. 200mm
~ Ay . 0 24 I) FLow — PROVIDE OVERFLOW WEIR 0.5 WIDE
. PLANS AND DOCUMENTS : K | WHERE BACKUP FLOW IS
‘ . LIKELY TO OVER TOP WEIR
SSO | referred to inthe REFERRAL {
. Queensland 0.3
AGENCY RESPONSE Goverment STAR PICKET
[oS
SARA ref: 2505-45871 SRA am
Date: 1 April 2026 SEDIMENT FENCE DETAIL
SCALE NTS
SEDIMENT FENCE SECTION
. Place on the toe of all fill batters
Amended In red by SARA on where shown or directed by the Engineer.
These fences are not to be used
1 April 2026 for concentrated flows with catchments
greater than 2000 sq. m.
SoS = _
TOPSOIL AND TURF STOCKPILE AREA PLASTIC Ayo SAND
4 SHEET
i eee {/\not approved as part of this
| TEMPORY 450° YE, | :
/ (| RCP GULLY application PLACE ROCKS
DIVERSION PIPE TO STABILISE
FLOW
—_
mm
DE-WATERING BUND DETAIL
‘APPROX. |
STOCKPILE 5 SCALE NTS
LOCATION *
" NOTE:
THIS IS ONLY A CONCEPT EROSION & SEDIMENT
L CONTROL PLAN. CONTRACTOR SHALL PREPARE AND
6 12. 18m SUBMIT AN RPEQ CERTIFIED EROSION & SEDIMENT
berm | CONTROL PLAN TO THE SUPERINTENDENT PRIOR TO
CONCEPT EROSION & SEDIMENT CONTROL PLAN Scale 1.300 @AI START OF WORKS.
Scale 1:100 @A1
CLIENT: SURVEYED BY: SHEET No. IN SET | REVISION.
Callaghan & Toth draulic Enei D [03/26 | CULVERT DESIGN CHANGE MP D ior] 26 ROSES ROAD FEDERAL 15 OF 18 D
til, Environment yeraulic Engineers Cc fv2s |ADDITION OF SIGHT DISTANCE PLAN cr JD ADT CONCEPT EROSION & SEDIMENT CONTROL PLAN
PO BOX 2305 NOOSA HEADS 4567 MICHAEL JONES MURRAY®& a hia FOR APPROVAL cr ” ADT [DRAWING NUMBER
1.16/90 GOODCHAP STREET NOOSAVILLE i ASSOCIATES
Ph: 54749081 www.callaghanandtoth.com.au i Suerons 8 Town Las A {00/25 _|FOR REVIEW ST iM OPERATIONAL WORKS 2319-015
INDEX| DATE _ [REVISIONS DRAWN [CHECKED | APPROVED
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.