Approved plans and specifications

of 11

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                                                                          STRUCTURAL NOTES:                                                  EARTHWORKS AND PAVEMENT NOTES:
GENERAL NOTES
                                                                                                                                          REINFORCEMENT:
1.   UPON COMPLETION OF WORKS THE AREAS AFFECTED BY THE WORKS        ENVIRONMENTAL:                                                                                                                          1. STRIP NATURAL SURFACE TOPSOIL TO 150mm OR DEEPER AS REQUIRED. REMOVE ANY
     AND ASSOCIATED CONSTRUCTION ACTIVITIES SHALL BE CLEANED UP      17. CLEARING TREES ONLY AS REQUIRED. PRUNING OVER HANGING            1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE.           UNSUITABLE MATERIAL AND REPLACE WITH SUBGRADE REPLACEMENT TO DETAILS ON
     TO COUNCIL SATISFACTION.                                                                                                                                                                                    SHEET 011. TOPSOIL WITHIN WORKS AREA IS TO BE REMOVED, STOCKPILED, AND REUSED
                                                                         BRANCHES PRIOR TO WORKS. LEAVE ROOT BALL IN BANK, IF POSSIBLE,
                                                                                                                                          2. REINFORCEMENT IS REPRESENTED DIAGRAMMATICALLY AND NOT               ON ALL DISTURBED AREAS TO A COMPACTED DEPTH OF 75mm.
                                                                         OF TREES REMOVED ON CREEK.
2.   ENSURE ALL CONSTRUCTION VEHICLES AND MACHINERY HAVE BEEN                                                                                                                                                2. CONTRACTOR SHALL OBTAIN ONE CBR TEST PER MATERIAL TYPE OR AT EVERY 100m OF
                                                                                                                                             NECESSARILY SHOWN IN TRUE PROJECTION.
     CLEANED IN ACCORDANCE WITH DAF VEHICLE AND MACHINERY            18.   WORKS TO BE IN ACCORDANCE WITH:                                                                                                       ROAD (2 TESTS MINIMUM).
     CLEANDOWN PROCEDURES (2019) PRIOR TO ACCESSING SITE.                                                                                 3. CONCRETE ROAD SL102 SLAB MESH AND SL82 CUTOFF WALL MESH TO      3. NATURAL SUBGRADE MINIMUM COMPACTION SHALL BE 97% RDD (RELATIVE DRY
                                                                      18.1.   OPERATIONAL WORK CONDITIONS FOR WATERWAY BARRIER
                                                                                                                                             AS2780 SHALL BE LAPPED BY TWO TRANSVERSE WIRES PLUS 25mm.           DENSITY).
DEMOLITION, EROSION & SEDIMENT PREPARATION:                                   WORK DECISION NOTICE 2202-27372 SDA
                                                                                                                                             BUNDLED BARS SHALL BE TIED TOGETHER AT 30 BAR DIAMETER          4. SUBBASE AND BASE COURSE SHALL BE COMPACTED TO 100% RDD AND TESTED IN
                                                                      18.2.   CONSTRUCTION EMP FOR THE PROJECT                                                                                                   ACCORDANCE WITH MRTS05.
3.   DEMOLITION MATERIAL TO BE REMOVED AND LEGALLY DISPOSED OF                                                                               CENTRES WITH 3 WRAPS OF THE WIRE.
                                                                                                                                                                                                             5. SUBGRADE, SUBBASE, AND BASE COURSES SHALL EACH BE PROOF-ROLLED USING A
     OFF-SITE.                                                       REHABILITATION:                                                                                                                             FILLED WATER TRUCK UNDER THE SUPERVISION OF A SUITABLY QUALIFIED ENGINEER.
                                                                                                                                          4. REINFORCEMENT OF BOX CULVERT SLAB, WINGWALLS, AND APRON
4.   ALL EROSION AND SEDIMENT CONTROLS TO BE IN ACCORDANCE WITH      19. DISTURBED BATTERS OR CREEK BANKS TO BE MULCHED AND                  SHALL BE IN ACCORDANCE WITH SPECIFIED TMR STANDARD DRAWINGS     6. ASPHALT PAVEMENTS SHALL BE COMPACTED AND TESTED IN ACCORDANCE WITH
     "BEST PRACTICE EROSION AND SEDIMENT CONTROL", INTERNATIONAL         COVERED WITH JUTE COIR MATTING AND PINNED AS PER                    AND SPECIFICATIONS.                                                 MRTS30
     EROSION CONTROL ASSOCIATION (IECA), AUSTRALASIA CHAPTER, 2008       MANUFACTURERS REQUIREMENTS.                                                                                                         7. PAVEMENT DESIGN IS BASED ON A CBR5 VALUE USING AUSTROADS GUIDE TO PAVEMENT
     AND IPWEA STD DRGs DS-040 AND DS-041, TO THE SATISFACTION OF                                                                         5. WELDING OF REINFORCEMENT IS NOT PERMITTED WITHOUT THE               TECHNOLOGY PART 2. WHERE INSITU CBR TESTING RESULTS IN A CBR VALUE LOWER
     THE SUPERINTENDENT.                                             20. PLANT WITH NATIVE GROUND COVERS e.g. LOMANDRA HYSTRIX AND                                                                               THAN 3%, SUBGRADE REPLACEMENT PER "DESIGN PAVEMENT SECTION" ON SHEET 08
                                                                                                                                             APPROVAL OF THE SUPERINTENDENT.
                                                                         DIANIELLA CAERULEA, AT 0.3m CENTRES IN ACCORDANCE WITH                                                                                  SHALL BE INSTALLED.
5.   TEMPORARY STORMWATER DEVICES INCLUDING COFFER DAMS TO BE            COUNCIL'S LANDSCAPING CODE.                                                                                                         8. DESIGN ESA's ARE BASED ON NOOSA COUNCIL PLANNING SCHEME CLASSIFICATION.
     IN PLACE DURING CONSTRUCTION TO ALLOW FOR FLOW OF CREEK                                                                              6. ALL REINFORCEMENT TO BE SUPPORTED IN ITS CORRECT POSITION
                                                                     21. DISTURBED AREAS ADJACENT TO ROADWAYS TO BE SEEDED WITH              DURING CONCRETING BY APPROVED BAR CHAIRS, SPACERS OR            9. PAVEMENT WORKS SHALL BE IN ACCORDANCE WITH MRTS 04, 05, 11, 12, & 30 TECHNICAL
     AND PROTECTION OF STAGED CONSTRUCTION AREAS. USE OF                                                                                                                                                         SPECIFICATIONS.
                                                                         NATIVE GRASSES AND GROUND COVERS.                                   SUPPORT BARS.
     EXISTING CAUSEWAY/PIPES IS REQUIRED.                                                                                                                                                                    10. CONTRACTOR SHALL MEET ALL COSTS ASSOCIATED WITH TESTING.
6.   NEW CONSTRUCTION SHALL INTERFACE NEATLY INTO THE EXISTING                                                                            7. REINFORCING BARS TO BE AS4671:2001 WITH 60mm MIN. CLEARANCE.    11. IF ANY ADDITIONAL IMPORTED FILL IS REQUIRED, THE MATERIAL SHALL BE MINIMUM TYPE
     TERRAIN AND CHANNEL BANKS.                                                                                                                                                                                  2.5 MEETING MRTS 04 AND 05 REQUIREMENTS.

7.   INSTALL TREE PROTECTION ZONE (TPZ) FENCING PRIOR TO WORKS ON                                                                         CONCRETE:
     SITE.
                                                                                                                                          1. NO HOLES, CHASES OR EMBEDMENT OF PIPES OTHER THAN THOSE
EXISTING VEGETATION:                                                                                                                         SHOWN ON THE DRAWINGS TO BE MADE IN CONCRETE MEMBERS              REQUIRED HOLD POINT INSPECTIONS :
                                                                                                                                             WITHOUT PRIOR APPROVAL OF THE SUPERINTENDENT.                      ·   CONSTRUCTION PRE-START MEETING
8.   WEED TREATMENT TO BE UNDERTAKEN PRIOR TO CLEARING TO                                                                                                                                                       ·   SET OUT OF CULVERTS AND CONCRETE ROAD
     REDUCE THE RISK OF SPREADING WEEDS.                                                                                                  2. CONSTRUCTION JOINTS TO BE PROPERLY FORMED AND USED ONLY            ·   PLACEMENT OF COFFER DAMS/DE-WATERING BUND
9.   ALL EXISTING VEGETATION WITHIN THE CHANNEL AND ROAD RESERVE                                                                             WHERE SHOWN OR SPECIFICALLY APPROVED BY THE                        ·   BASE PREPARATION AND PROOF ROLLING
     THAT IS IMPACTED BY THE WORKS IS TO BE REMOVED & DISPOSED OF                                                                            SUPERINTENDENT. CONTRACTOR TO ENSURE STRUCTURE IS WATER            ·   CONCRETE PRE-POURS FOR EACH ROAD SECTION, WING
     OFF-SITE. REMOVED TREES SHALL BE OFFSET BY AN ADDITIONAL                                                                                PROOF.                                                                 WALL/HEADWALL, BASE SLABS, AND APRONS
     THREE TREES AS DIRECTED BY COUNCIL.                                                                                                                                                                        ·   RCBC LAYING
                                                                                                                                          3. EXPOSED EDGES TO BE CHAMFERED 20mm.                                ·   ROCK SCOUR PROTECTION INCLUDING ROCK TO BE USED AND
10. ENSURE WORKS ARE IN ACCORDANCE WITH TREE PROTECTION                                                                                                                                                             EXTENTS OF FILL
    REQUIREMENTS. REFER TO AUSTRALIAN STANDARD AS4970-2009.                                                                               4. CONCRETE SHALL COMPLY WITH THE REQUIREMENTS OF AS3600 WITH         ·   FINAL INSPECTION
                                                                                                                                             CONCRETE GRADE TO THE MINIMUM 28 DAY COMPRESSIVE STRENGTH.
SERVICE LOCATIONS:
                                                                                                                                          5. ALL MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH
11. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CONTACT THE
                                                                                                                                             AS3600.
    RELEVANT SERVICE UTILITY PROVIDERS TO CONFIRM THE LOCATION
    OF ALL EXISTING SERVICES PRIOR TO COMMENCEMENT OF WORKS.
                                                                                                                                          6. CONCRETE ROAD NOT TO BE TRAFFICKED ON UNTIL CONCRETE
SURFACE LEVELS:                                                                                                                              STRENGTH HAS REACHED 32MPa (APPROXIMATELY 7 DAYS) AS
                                                                                                                                             DETERMINED BY TESTING OF SITE CURED CYLINDERS.
12. SURFACE LEVELS OVER THE SITE HAVE BEEN INTERPOLATED
    THROUGH COMPUTER MODELLING OF FIELD SURVEY DATA. THESE                                                                                7. CONCRETE QUALITY MUST MEET THE FOLLOWING GUIDELINES:
    CALCULATED LEVELS MAY VARY FROM THE ACTUAL GROUND LEVEL
    AT THE CORRESPONDING POSITION ON SITE. WHERE MAJOR                                                                                      · ADMIXTURES SHALL NOT BE USED WITHOUT THE WRITTEN
    VARIATIONS OCCUR, THEY SHALL BE REFERRED TO THE                                                                                             APPROVAL OF THE SUPERINTENDENT
    SUPERINTENDENT FOR FURTHER CONSIDERATION WHERE SUCH                                                                                     · CEMENT SHALL BE TYPE 'A' NORMAL CLASS PORTLAND CEMENT
    VARIATION WILL CAUSE MAJOR PROBLEMS WITH CONSTRUCTING THE                                                                                   UNLESS NOTED OTHERWISE
    PROJECT IN ACCORDANCE WITH APPROVED PLANS.                                                                                              ·   MAXIMUM SIZE OF COARSE AGGREGATE SHALL BE 20mm
                                                                                                                                            ·   SLUMP SHALL BE 80mm (+/- 15mm)
SURVEY REFERENCE:                                                                                                                           ·   CONCRETE STRENGTH SHALL BE GRADE S40
                                                                                                                                            ·   MAXIMUM WATER/CEMENT RATIO OF 0.45
13. ALL CONSTRUCTION LEVELS SHALL BE SET BY THE CONTRACTOR WITH                                                                             ·   DRY SHRINKAGE STRAIN AT 56 DAYS NOT TO BE GREATER THAN 700
    REFERENCE TO SURVEYED STAKES AND SURVEYED BENCH MARKS                                                                                       x 10^-6 (AS1012.13)
    PROVIDED BY THE APPOINTED SURVEYORS. ALL SURVEY STATIONS,
    SETOUT STAKES AND PERMANENT SURVEY PEGS OR MARKS ON OR                                                                                8. SAMPLING AND TESTING OF CONCRETE AND CONCRETE
    ADJACENT TO THE CONSTRUCTION SITE SHALL BE PROTECTED                                                                                     CONSTITUENTS SHALL BE IN ACCORDANCE WITH AS1379.
    DURING CONSTRUCTION.

BOX CULVERT WORKS:
14. INSTALLATION OF REINFORCED BOX CULVERTS SHALL COMPLY WITH
    THESE PLANS AND TMR STANDARD DRAWINGS AND SPECIFICATIONS
    MRTS03 & MRTS24.

WATERWAY PROTECTION:
15. EXISTING NATURAL WATERWAY FEATURES INCLUDING BANK
    ESTABLISHMENT, VEGETATION, AND CHANNEL PROFILE OUTSIDE OF
    CONSTRUCTION AREA SHALL BE MAINTAINED DURING ALL STAGES OF
    THE WORKS. DISTURBANCE OF THE WATERWAY OUTSIDE OF
    PROPOSED WORK AREA AND STAGING AREA IS NOT PERMITTED.
16. REQUIRED EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IN
    PLACE PRIOR TO START OF WORKS . INSTREAM MEASURES TO BE
    DESIGNED TO ALLOW FISH PASSAGE.




Callaghan & Toth                                                                                                                                                                        36 ROSES ROAD FEDERAL
Civil, Environmental & Hydraulic Engineers                                                                                                                                                                                                                                    D
                                                           MICHAEL JONES                                                                                                                GENERAL NOTES
                                                                                                                                                                                                                                                                                       A1
                                                                                                                                                                                        OPERATIONAL WORKS
Log in to download the original file

Approved plans and specifications.pdf · 7.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.