Original source · versioned page text
Approved plans and specifications
Plans and drawings: the text below has words only, no drawings.
13 14 1
12
CH H21
21 8.6
C
8.
20 7
0
1
CH
11 2
CH2
22
3
0. 0
10
50.8
00
10
150
CH2
47.4
21
CH229.435
CH237.649
CH239.424
CH240.000
150 150
4
9
8 5
6
7
CAUSEWAY SETOUT TABLE
LAYOUT PLAN POINT NORTHING EASTING LEVEL LOCATION
1 481399.810 7080990.415 81.744 TOP OF APRON AT BACK OF WINGWALL
2 481398.113 7080990.847 81.708 TOP OF BASE SLAB CORNER
3 481397.960 7080991.010 83.176 TOP OF ROAD CORNER AT CULVERT EDGE
4 481394.468 7080989.965 83.103 TOP OF ROAD CORNER AT CULVERT EDGE
5 481394.430 7080989.744 81.631 TOP OF BASE SLAB CORNER
6 481392.591 7080989.262 81.593 TOP OF APRON AT BACK OF WINGWALL
7 481390.478 7080996.322 81.593 TOP OF APRON AT BACK OF WINGWALL
8 481392.279 7080996.929 81.631 TOP OF BASE SLAB CORNER
9 481392.432 7080996.767 83.103 TOP OF ROAD CORNER AT CULVERT EDGE
10 481395.924 7080997.812 83.176 TOP OF ROAD CORNER AT CULVERT EDGE
11 481395.963 7080998.032 81.708 TOP OF BASE SLAB CORNER
12 481397.414 7080998.894 81.744 TOP OF APRON AT BACK OF WINGWALL
13 481397.708 7080998.417 81.744 TOP OF CORNER OF APRON
14 481399.940 7080990.960 81.744 TOP OF CORNER OF APRON
CL01
1:4
A1 HORZ SCALE 1:10
A1 VERT SCALE 1:10
Callaghan & Toth 36 ROSES ROAD FEDERAL
Civil, Environmental & Hydraulic Engineers D
MICHAEL JONES CONCRETE JOINT PLAN & DETAILS 1 OF 2
A1
OPERATIONAL WORKS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.