Original source · versioned page text
Attachment 4 - Existing Approval
Very large file: it may take a few minutes
The original of this document is very large (10.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Town Planning Consent Permit - TPC 2559 Page 3 10. 11, 12: 13% c. Aminimum 1 metre setback to any fencing to be installed along the northern frontage. d. Amore detailed identification of species to be planted on the site, together with a schedule of planting which indicates the size to be installed. e. Landscaping to be undertaken between the Council boardwalk in the Parade and the northern boundary of the site. f. Additional landscaping of the Hastings Street footpath in keeping with recent upgrading works elsewhere in the street. Construction work and other associated activities are permitted only during the hours of 7.00 a.m. to 6.00 p.m. Monday to Saturday. No work is permitted on public holidays, except where extended hours are approved by the Building Surveyor. Any advertising sign or device is to comply with the provisions of Council’s policies on advertising. The footpath across the Hastings Street frontage of the site is to be fully paved and landscaped from the kerb and channel to the property alignment and landscaped in accordance with condition 7 above, to the satisfaction of the Shire Engineer. The developer shall bear the cost of alteration of any public utility or other facilities necessitated by the development of the land or associated construction works external to the site. Connection to Council’s existing water supply and sewerage reticulation systems at the developer’s expense to the standards and requirements of the Shire Engineer. The developer is to satisfy Council that the sewer line at the rear of the property can be abandoned. If this is not the case, the developer shall be responsible for the relocation of the sewer line to the satisfaction of the Shire Engineer. The developer shall provide a metered water connection from the water supply system to the proposed development, in accordance with Council’s standards and to the satisfaction of the Shire Engineer.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.