2.0 Stormwater Runoff
2.1 Existing
As shown on the existing survey in Appendix A, the site drains to a large chamber located in the
north-east corner, which then discharges to an existing reserve. Neither the adjacent lots nor the
road reserve contribute to the site runoff.
Underground drainage from the common road reserve and adjacent lots pass through the site with
the road drainage contained within an easement.
2.2 Internal
The developed site will achieve 90% impermeable site coverage. All roof water and exposed
pavement runoff will be collected by field inlets and conveyed to detention storage incorporating the
existing chamber. Attenuated runoff will then discharge to the drainage reserve to the east of the
site. Pavements and finished ground levels will fall to the rear at grades of 0.5 - 2% as shown on the
preliminary pavement and stormwater design in Appendix B.
2.3 Detention
The design AEP for the existing drainage network is unknown, however for the purpose of detention
design it will be assumed that it has not been designed to cater for full development (Business
Centre 1 in 10-year as required by SPS6 of the Planning Scheme) of the urban catchment. As the
site impervious area has increased from 0% to 90%, on-site detention will be assumed to be
Actrol Noosaville
STP17-0504
Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Site Based Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.