Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Site Based Stormwater Management Plan · 132007.1841.7

Attached to the e-mail Response to Information Request - 132007.1841.7.

of 10

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                           Table 2 – Pre- and post-development runoff and detention calculations
The 100-year Inflow-Outflow-Storage hydrographs are shown below in Figure 3 and refine the required
storage volume to 12m3. Maximum outflow from the system will be limited to 0.073m3/s by a 300mm diameter
outlet pipe from the last inlet pit to the downstream chamber.




                                                                                                   Actrol Noosaville
                                                                                                       STP17-0504
                                                                                                            Page 6

Used in these records

About this file

File size
3.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Site Based Stormwater Management Plan.pdf · 3.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.