Original source · versioned page text
Confirmation Notice Assessment Manager OPW26 0079 [As Published]
Officer: Daniel Epps
Direct Telephone: 07 53296223
Our Reference: OPW26/0079
Your Reference: 241021
25 June 2026
PermaBuild
18 Shearwater St
PEREGIAN BEACH QLD 4573
[email protected]
Dear Sir/Madam,
Confirmation Notice
Planning Act 2016
Council confirms receipt of the application described below, which was properly made on 12
June 2026.
This Confirmation Notice has been prepared in accordance with the Development Assessment
Rules and contains information relevant to the processing and assessment of the application.
The following details are confirmed:
1. APPLICATION DETAILS
Application No. OPW26/0079
Street Address: 18 Shearwater St Peregian Beach Qld 4573
Real Property Description: Lot 424 P 93116
Planning Scheme: Noosa Plan 2020 (20 March 2026)
Level of Assessment: Code
2. TYPE OF DEVELOPMENT PROPOSED
The application seeks development approval for:
Development Permit for Operational Works - Vehicle Crossover
3. PUBLIC NOTIFICATION DETAILS
Public notification is not required for this application.
4. REFERRAL DETAILS
No referral is required.
5. INFORMATION REQUEST
Council may decide to make an information request.
ABN 97.969.214.121 PO Box 141
noosa.qld.gov.au Tewantin QLD 4565
[email protected] 07 5329 6500
Page 1 of 3
Document Set ID: 24898167
Version: 2, Version Date: 25/06/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 2 pages
Page 2
6. OTHER DETAILS
You can follow the progress of this application online at www.noosa.qld.gov.au. The “Online
Services” page can be accessed via "Quick Links" on the left hand side of the screen. Should
you have any further queries in relation to the above, please do not hesitate to contact me on
the number above.
Yours faithfully,
Daniel Epps
Senior Development Engineer
Page 2 of 3
Document Set ID: 24898167
Version: 2, Version Date: 25/06/2026
Page 3
Explanatory Note – Public Notification Procedures
Planning Act 2016 & Development Assessment Rules
INTRODUCTION (a) if both part 2 and part 4 are relevant to the application as a
result of the changed application, the day after part 3 has
The purpose of this Explanatory Note is to provide guidance to ended;
applicants on the public notification requirements under Section
53 of the Planning Act 2016 (the Act) and under the (b) otherwise, the day after the day notice is given under
Development Assessment Rules (the Rules). The Act and the section 26.2(a) or 26.2(c).
Rules, set out the requirements for the giving of public notice. WHAT IS PUBLIC NOTICE
These guidelines quote much of the material contained within The following is extracted from Part 4 of the Rules.
the Act and the Rules.
17. Public notice requirements
If there is doubt about a particular public notification aspect, the
applicant should refer to the Act and the Rules or have the public 17.1. The applicant, or the assessment manager acting under
notice procedures undertaken by a consultant who is familiar section 53(10) of the Act, must give public notice by—
with the public notice requirements. (a) publishing a notice at least once in a newspaper circulating
Whilst every care has been taken in preparation of this generally in the locality of the premises the subject of the
explanatory note, ultimately it is the applicant's responsibility to application; and
ensure that the procedures are correctly followed. Council will (b) placing notice on the premises the subject of the application
not accept any responsibility for incorrect giving of public notice. that must remain on the premises for the period of time up
OVERVIEW OF PUBLIC NOTIFICATION PROCEDURES to and including the stated day; and
(PUBLIC NOTICE) (c) giving notice to the adjoining owners of all lots adjoining the
There are three distinct tasks to be undertaken when carrying premises the subject of the application.
out public notice: 17.2. The applicant must give notice to the assessment
1. Publishing a notice in a local newspaper. manager of the intended start date of public notification.
2. Placing a notice or notices on the premises. 17.3. Schedule 3 prescribes the way in which public notice
3. Giving notice to adjoining owners. must be given.
After the notification period has ended, the applicant must give 17.4. All public notice requirements under section 17.1 and
the assessment manager notice of compliance with the public 17.2 must be undertaken within the period prescribed under
notice requirements. section 16.
One key aspect to note is that an application automatically 18. Notice of compliance
lapses if public notification does not start within 20 business 18.1. If the applicant gives public notice, it must, within 10
days of the completion of the relevant preceding part. days from the day after the last day on which a submission may
Furthermore, the application also automatically lapses if be made, or a further period agreed between the applicant and
applicant does not give the assessment manager the notice of the assessment manager, give the assessment manager notice
compliance with the public notice requirements within 10 of compliance with the public notice requirements.
business days from the day after the last day on which a
submission may be made. PUBLIC NOTIFICATION PERIOD
WHEN NOTIFICATION PART STARTS Section 53 of the Act states the required public notification
period. The following is an extract from Section 53.
Part 4 of the Rules states when the public notification part starts. 53(4) The notice must state that—
The following is an extract from Part 4.
(a) a person may make a submission about the application to
16. When this part starts the assessment manager; and
16.1. If there are no referral agencies for the application and (b) any submission must be made by a stated day that is at
part 3 does not apply because: least—
(a) the applicant has advised that it does not wish to receive an (i) for an application that includes a variation request—30
information request and it is not an application mentioned in business days after the notice is given; or
section 11.3; or
(ii) for an application of a type prescribed by regulation—
(b) the assessment manager states in the confirmation notice the period, of more than 15 business days after the
that it does not intend to make an information request; notice is given, prescribed for the application; or
public notification must start within 20 days of the day after
the confirmation notice is given to the applicant. (iii) for any other application—15 business days after the
notice is given.
16.2. If—
53(5) However, if the development assessment rules require
(a) the applicant has advised that it does not wish to receive an the notice to be given in more than 1 way, the period mentioned
information request; and in subsection (4)(b) starts on the day after the day when the last
(b) it is not an application mentioned in section 11.3; and notice is given.
(c) there are referral agencies; Please ensure that all public notices that are published in the
public notification must start within 20 days after the day newspaper, placed on the land, and given to adjoining land
the last referral assessment period for any referral owners clearly state that:
agency has started. (a) written submissions may be made electronically; and
16.3. If sections 16.1 and 16.2 do not apply, public notification (b) electronic submissions are to be sent to
must start within 20 days of the day after part 3 has ended. [email protected]
16.4. For a changed application, where public notification is (c) all submissions, including individual submitter's particulars,
required to be undertaken again from its beginning, public will be published on Council's website (Online Services) and
notification must commence within 20 days— therefore will be accessible to internet search engines
Page 3 of 3
Document Set ID: 24898167
Version: 2, Version Date: 25/06/2026