Council archive · source document
08/0170 - Suspension of Applicant Appeal Period [As Published] · 132008.170
a All other clean stormwater, such as roof water, can be collected on site and discharged through a single underground drain line directly into the existing drainage system, by bypassing the grease/oil arrestor/gross pollutant trap. To this end, a detailed maintenance pian shall be prepared for the proposed grease/oil/arrestor/gross pollutant trap, which shail be submitted to the council for approval prior to obtaining a development permit for Operational Works. The approved maintenance plan shail be incorporated in the Community Management Scheme for the development sand a copy of this shall be provided for Council's records prior to commencement of the approved Use. A Development Permit for Building Works shail not be granted until a Development Permit for Operational Works has been issued in regard to the drainage scheme. Representation: The requirement to install a grease / oil arrestor on the subject site is not Amended Condition 45: Condition 45 considered reasonable nor relevant to the proposal. In this regard the applicant seeks only to construct two residential premises, which in accordance with Council’s car parking provisions generate an average of three vehicles in total (ie. 2 residents + 1 guest). Further, it is noted that the residential parking areas are entirely covered and therefore will not be subjected to rainfall. The applicant appreciates the need for the inclusion of a grease / oil arrestor in commercial and/or higher density residential developments given the high number of cars accessing the premises. However the requirement to provide this expensive and maintenance intensive facility on the subject site is considered completely irrelevant and unnecessary additional cost to the development process. Delete A registered easement shall be created over the zone of influence of all sewers within the subject site and over those parts of the subject site that are impacted upon by sewers on any adjoining sites. The easements shall generally be parallel to and centred over the sewer main and be equivalent in width to twice the depth to invert level of the sewer at the deepest point within the allotment (measured from the finished surface) and to be no less than 3.0m wide overall. In this regard a licensed surveyor shall accurately locate all sewer mains and determine the necessary width of the easement, which shall be shown on any plans submitted for Operational Works / Building Works approval. To this extent the surveyor shall certify that the sewer and the zone of influence is wholly contained within the easement to be created. In addition to this the Applicant’s Solicitor shall give Council's Solicitor an appropriate undertaking in writing that the Title Deed and the easement documents will be lodged at the Land Titles Office and any additional Titles Office forms or requestions requiring the consent of the Council will be attended to promptly. A duly executed copy of the easement shall be submitted to council for perusal prior to the use commencing. Any changes required by Council's Solicitor must be corrected immediately. Representation: Given the sewer line is located largely within Council property and the neighbouring property, the applicant has been required to rely on Council data with regard to its location and invert level. Should these records be incorrect and the zone of influence be greater than that currently detailed, the
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0170 - Suspension of Applicant Appeal Period [As Published]Related documentApplication case desk ↗
About this file
- File size
- 285 KB (small file)
- File type
No other editions are linked here.