Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Information response

of 12

Page text read automatically using OCR, there may be inaccuracies

June 2020
Our Ref: 19399
Council Ref: MCU20/0027



WASTE MANAGEMENT PLAN
Commercial Business - Type 2 Medical

45 MAPLE STREET AND 9 MYALL STREET, COOROY
LOTS 15 & 18 ON C5605 AND LOTS 1 & 2 ON RP99323


This waste management plan has been prepared as a guideline of likely waste generation, waste
storage and collection requirements for the proposed medical centre.

The waste management hierarchy is a framework that is specified in the Environmental Protection
(Waste Management) Policy 2000 for prioritising waste management practices to achieve the best
environmental outcome. The following waste management practices from the hierarchy are listed in
the preferred order of adoption –

1.   Waste avoidance – preventing/reducing the generation of waste;
2.   Waste reuse – reusing waste without substantially changing its form;
3.   Waste recycling – treating waste that is no longer usable in its present form and using it to
     produce new products;
4.   Energy recovery – recovering and using energy generated from waste;
5.   Disposal – treating and disposing of waste in a manner that causes least environmental harm.


In order to assist in outlining the waste management requirements, the sites uses have been broken up
into the following activities:

    Office Space
    Procedure Rooms
    Consulting Rooms

Waste streams shall be sorted on-site into general waste, recyclable waste and clinical waste.


Waste Generation – Office Space
Based on the preliminary tenancy plan, less than 50% of the medical centre floor area will be used for
office space. However for the purpose of waste generation assessment 50% of the proposed floor
space will be considered.
                                                                  2
The accepted rate for office/medical waste is 10- 20L/100m /day for general waste and 10 -
        2
20L/100m /day for recyclable waste.
                           2
Using a floor area of 440m the estimated waste generation per week (for a 5 – 6 day working week) is
220L – 5284L for general waste and 220L – 528L for recyclable waste.

Notwithstanding this relatively small waste requirement, the development proposes this use of 2 x
1100L waste collection bins (1 for general waste and 1 for recyclable water) , which will ensure
sufficient surplus capacity for waste storage.

Log in to download the original (Information response.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.