Response:
Refer attached amended proposal plan which indicates a preliminary floor plan. This floor plan is
however subject to change as part of detailed building design and tenant requirements.

7. Details of the medical facilities proposed to operate from the site and the maximum number
   of practitioners and staff who will be able to operate from the site at any one time.

Response:
The only confirmed use is tenancy 2 which will be for radiology and imaging. It is intended that the
other medical uses will be specialist medical uses complementary to the Eden private hospital.

Exact staffing numbers are unknown at this stage , however it is anticipated that the radiology practice
will have 2 medical practitioners and 8 - 10 support staff with the other tenancies each having 3
medical practitioners and 2- 3 support staff.


Issue
There is concern as to the effectiveness of approximately 1.15 metres of landscaping to the eastern
boundary to adequately screen and buffer the development from surrounding uses. The Landscaping
Code requires a minimum of 2.0 metres.

Information Required
8. An increased landscape buffer, at least 2 metres, adjacent to the eastern boundary.

Response:
The landscape buffer to the eastern boundary has been increased to 2m where it adjoins an existing
residential dwelling. The landscape concept plan demonstrates the ability the provide sufficient
landscape planting along the eastern boundary and which includes tall screening shrubs to 6m, where
adjoining residential use and a mix of medium screening shrubs to 3m and tall foliage planting to
3.5m, where adjoining commercial use. This outcome will provide adequate screening and buffering
to surrounding uses.


Issue - Stormwater
In relation to the proposed stormwater management and layout, the following issues need to be
addressed/clarified:
a. Concerns regarding potential of conflict with existing sewer main near the southwest corner of the
site (current 47A Maple St property).

Information Required
9. Investigate the potential of conflict with existing sewer main and seek endorsement of
    Unitywater in this regard.

Response:
A review of the existing and proposed services has been undertaken and it is not considered there will
be any conflict between the existing sewer main and proposed stormwater drainage in the southwest
corner. The concept stormwater management plan has been updated to show the existing sewer line
in relation to the proposed drainage line, together with likely easement extents. As seen on this plan
the drainage line is outside the sewer zone of influence and easement extent. This can be further
addressed as part of a subsequent Unitywater connection approval and Council operational works
approval.

Log in to download the original (Information response.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.