                                              Officer:          Evelyn Murphy
                                              Direct Telephone: (07) 5449 5225
                                              Response Address: PO Box 141, Tewantin QLD 4565
                                              Email:            [email protected]
                                              Our Reference:    2008/1867
                                              Your Reference:   00800 LO5 MK
24 March 2009

Chantay Too Pty Ltd
CARE Martoo Consulting Pty Ltd
PO Box 1684
NOOSA HEADS QLD 4567



Dear Madam

                                      Decision Notice
                                    Integrated Planning Act 1997

I refer to your application and advise that on 24 March 2009 Council decided to approve the
application in full subject to conditions.
Details of the decision are as follows:

1        APPLICATION DETAILS

    Application No:                  2008/1867
    Street address:                  51 Elanda Street, Sunshine Beach
    Real property description:       Lot 403 RP 48112
    Planning Scheme:                 The Noosa Plan
2        DECISION DETAILS

The following type of approval has been issued:
        Development Permit for Material Change of Use - Multiple Housing Type 2 - Duplex
3        RELEVANT PERIOD OF APPROVAL

The relevant period for this Development Approval is identified in the Assessment Manager
conditions.

4        ASSESSMENT MANAGER CONDITIONS

Land Use
1.       Development undertaken in accordance with this approval must generally comply with the
         approved plans of development. The approved plans are listed in the following table and may
         be amended by these conditions: -
          Plan         /     Rev.   Plan / Document Name                         Date
          Document No.
          DA-D03                    Ground Floor Plan West – Andrew Bock         17 October 2008
                                    Architecture


                                                                                        Page 1 of 14
Full text of the other 13 pages

Page 2

                                                                                        2008/1867



     DA-D04                      Ground Floor Plan East – Andrew Bock        17 October 2008
                                 Architecture
     DA-D05                      Floor Plan Level 1 – Andrew Bock            17 October 2008
                                 Architecture
     DA-D06                      Floor Plan Level 2 – Andrew Bock            17 October 2008
                                 Architecture
     DA-D07                      Roof Plan – Andrew Bock Architecture        17 October 2008
     DA-E.01                     North Elevation      –      Andrew   Bock   17 October 2008
                                 Architecture
     DA-E.02                     South Elevation         –   Andrew   Bock   17 October 2008
                                 Architecture
     DA-E.03                     East Elevation       –      Andrew   Bock   17 October 2008
                                 Architecture
     DA-E.04                     West Elevation       –      Andrew   Bock   17 October 2008
                                 Architecture
     DA.F.01             A       A-Section    01     –       Andrew   Bock   28 January 2009
                                 Architecture
     DA-F.02                     -Section 02 – Andrew Bock Architecture      28 January 2009
     DA-F.03                     -Section 03 – Andrew Bock Architecture      28 January 2009
     DA-F.04                     -Section 04 – Andrew Bock Architecture      28 January 2009
     DA-F.05                     -Section 05 – Andrew Bock Architecture      28 January 2009
     DA-Z.03                     View from South East – Andrew Bock          17 October 2008
                                 Architecture
     DA-Z.04                     View from South West 2 – Andrew Bock        17 October 2008
                                 Architecture

2.   The development must be undertaken and operated in a manner that causes no detrimental
     effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
     lighting nuisance or other emissions.
3.   The open space and setback areas are to be landscaped in accordance with Council’s Policy
     on Landscaping Guidelines and a properly prepared landscape plan. Such landscaping is to
     be completed prior to the premises being occupied and maintained at all times thereafter and
     shall include:-
     3.1     A minimum of 2 street trees are to be provided along the sites frontage.
     3.2    Screening vegetation is to be provided along the side boundaries.
4.   Existing trees on the site and within road reserves are to be retained, except where required to
     be removed due to building operations or the conduct of the approved use. These landscape
     plans required to be submitted are to denote areas of existing vegetation or existing trees
     proposed or required to be retained.
5.   All fencing shall be setback at least 1 metre from the front property boundary, with at least half
     of the fencing setback 2 metres. The area of land between the fence and the front property
     boundary shall be densely landscaped to screen any fencing from the street
6.   Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like,
     thus remaining as open structures.

                                                                                     Page 2 of 14

Page 3

                                                                                       2008/1867



7.    The premises are to be identified by the provision of a street number in a prominent location to
      ensure it is identifiable to all persons, particularly emergency services personnel.
8.    Building Height is to be a maximum of 3 stories and 12 metres above natural and finished
      ground level as per the Noosa Plan. A verification survey of the building is to be carried out by
      a Licensed Surveyor and a certificate lodged with Council at completion of work confirming
      compliance with the maximum allowable building height as required by either the conditions of
      approval or the Planning Scheme.
9.    Security in the form of a cash bond or trading bank guarantee to the sum of $15,000 must be
      submitted, to secure performance of all conditions of this approval, prior to the issue of a
      Development Permit for operational works. The cash bond or trading bank guarantee will be
      returned on performance of the conditions of approval less any costs incurred by Council in
      respect of enforcing performance of this permit.
10.   The requirements of this development approval are to be effected, prior to the use of the
      premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
      this approval to effect compliance with conditions.
11.   The Development Permit for a material change of use of premises lapses if the use has not
      happened by 24 March 2013, unless an application to extend the relevant period is approved
      by Council.
12.   The developer must obtain all of the other Development Permits referred to in the Decision
      Notice, prior to obtaining a Development Permit for Building Works.
Building Services
13.   Fences are not permitted to exceed 2 metres above natural ground level.
Land Development
Vehicle Access
14.   A vehicular access driveway shall be constructed to the site frontage with a maximum width of
      3.5m within the Elanda Street Road Reserve. The driveway must then increase in width to a
      minimum of 5.5m within the property to allow passage of two cars on the driveway.
15.   The driveway shall be designed and constructed to Council’s design standards and to grades
      that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians
      movements along the footpath without any step or level difference. Should any driveways be
      constructed to grades that do not comply with AS/NZS 2890.1-2004, Council will require that
      the driveway be removed and reconstructed to levels that do comply.
      Please note, a step between the driveway and the footpath shall be avoided, as it is preferred
      to have the footpath continue at a constant grade to minimise the potential for pedestrians to
      trip or fall.
16.   To ensure pedestrian safety between vehicles exiting the site and pedestrians on the footpath,
      the driveway and any associated fencing or vegetation near the driveway shall comply with the
      minimum sight line requirements as defined in AS 2890.1, section 3.2.4. The applicant shall
      demonstrate compliance by illustrating these sight lines on the plans submitted for both
      Operational Works approval and Building Works approval.
17.   All vehicles shall enter and leave the site in a forward direction.
18.   The vehicle manoeuvring area at the northern end of the driveway shall remain unobstructed
      at all times. Signage shall be installed to ensure vehicles do not park in the vehicle
      manoeuvring area.
Off Street
19.   The carparking area shall be designed to comply with the provisions of AS/NZS 2890.1-2004
      for user class 1A with allowance for vehicles to enter the space in a forward gear, reverse and
      leave the site in a forward gear in a total of three movements.
                                                                                     Page 3 of 14

Page 4

                                                                                      2008/1867



20.   The carpark and driveway area must have a minimum head clearance (headroom) of 2.2m at
      any point.
Frontage Works
21.   Footpath improvements such as topsoiling, grassing, and tree planting are required to the
      Elanda Street frontage of the site in accordance with Planning Scheme Policy PSP03
      Landscaping Plants & Guidelines. Grass shall be couch, free of weeds.
22.   A new 1.5m wide concrete path shall be constructed along the Elanda Street frontage of the
      site in accordance with Council’s design standards and to an alignment that protects any
      significant vegetation or any underground services. The footpath shall connect to and match
      evenly with the existing footpath networks located to the north and south of the site.
23.   All paths, driveways and parking areas shall be designed and constructed to ensure
      pedestrian safety using non-slip materials, to produce an evenly graded surface finish, and to
      be in accordance with the Disability Discrimination Act 1992 and Australian Standard 1428.1
      Design for Access & Mobility.
Road Works
24.   The full length of the Elanda Street frontage of the development site shall be upgraded by
      providing kerb and channel, bitumen road widening and landscaping improvements to the
      footpath. The new kerb and channel shall be aligned so that it is located 8 metres off the
      existing kerb and channel on the western side of the road measured from the nominal face of
      the kerb,
      All associated and ancillary work including pavement correction to the existing pavement,
      drainage works, modification of the footpath, and adjustments to the existing infrastructure
      shall be undertaken to complete the roadworks widening.
      In this regard, plans detailing this work shall be prepared and submitted to Council for
      approval prior to obtaining a Development Permit for Operational Works.
Roof Water & Stormwater Drainage
25.   Roof runoff from any new building shall be directed to a rainwater storage system or tank that
      is installed to ensure water from the rainwater storage system or tank is used for external uses
      (such as watering gardens, irrigation, ornamental ponds, water features, topping-up swimming
      pools, outdoor cleaning, etc) and for internal (ground floor) use in washing machine cold taps
      and toilet cisterns. All rainwater tanks are to be designed and installed in accordance with the
      Queensland Development Code (QDC) current at the time of building approval, and shall be
      part of the plumbing application for approval. The location and capacity of the tanks shall be
      clearly shown on the plans submitted for Operational Works approval and any overflow shall
      be directed to the approved stormwater discharge point.
26.   All stormwater drainage shall be collected on site and discharged so there is no net increase
      in stormwater runoff from the site. Stormwater drainage permitted to drain from the site may
      be discharged to Council’s existing drainage structures at either the grated stormwater pit at
      the south east corner of the site or to the kerb and channel in the Henderson Street road
      reserve. Stormwater drainage permitted to drain from the site must be in accordance with an
      Operational Works Approval for stormwater drainage.
      The Operational Works application for stormwater drainage must clearly demonstrate to the
      satisfaction of the CEO’s delegated officer that the stormwater structure nominated to receive
      site drainage has sufficient capacity to receive any additional flows generated from the site.
      Plans of the drainage design shall be prepared by a Registered Professional Civil Engineer of
      Queensland (RPEQ) and submitted to Council prior to obtaining a Development Permit for
      Operational Works.
      The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street
      drainage system at any one location is 25 litres/second.
                                                                                    Page 4 of 14

Page 5

                                                                                        2008/1867



      A Development Permit for Building Works shall not be granted until a Development Permit for
      Operational Works has been issued in regard to the drainage scheme.
27.   As the site is proposed to be filled, stormwater drainage pipes and/or an overland flow-path
      that caters for drainage from the adjoining sites for a design storm with an Average
      Recurrence Interval of 1 in 100 years shall be installed within the site to collect and discharge
      stormwater runoff from all adjoining properties to prevent additional ponding/flooding on these
      properties.
28.   All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
29.   The site shall be connected to Council’s existing sewerage reticulation systems and be
      constructed in accordance with Council’s standards and requirements at no cost to Council.
30.   The existing sewer main that traverses the rear of the site and the ‘zone of influence’ (taken as
      the area within a 45-degree angle measured from the invert of the sewer main to the finished
      surface level) shall be accurately located and determined by a licensed Surveyor and shown
      on all plans submitted for Operational Works approval.
      To ensure Council’s sewer main is accessible for maintenance purposes and is protected from
      risk of damage no structures requiring a building permit (eg. buildings, swimming pools,
      retaining walls exceeding 1m in height, raised terraces, etc) shall be constructed within this
      ‘zone of influence’ or within 1.5m of the centreline of the sewer main, whichever is the greater.
      As such the applicant shall amend Operational Works plans including Building plans to ensure
      compliance.
Town Water Supply
31.   The site shall be connected to Council’s existing town water supply and be constructed in
      accordance with Council’s standards and requirements at no cost to Council.
32.   The development shall be served by individual water meters to each tenement and be capable
      of being separately rated.
33.   Each individual water connection to the water reticulation system shall extend to the property
      boundary and be metered. All fees for the supply of water meters shall be paid to the Council.
34.   All water meters must be located outside the property boundary and in an easily assessable
      location to facilitate unhindered reading by Council and/or Council’s contracted water meter
      readers, and not behind fences or locked gates. In this regard approval of the water meter
      configuration and location must be obtained from Council’s Water & Sewerage Capital Works
      Manager prior to lodgement and approval of hydraulic drawings.
Service Easements (Sewer)
35.   A registered easement shall be created over the zone of influence of all sewers within the
      subject site and over those parts of the subject site that are impacted upon by sewers on any
      adjoining sites. The easements shall generally be parallel to and centred over the sewer main
      and be equivalent in width to twice the depth to invert level of the sewer at the deepest point
      within the allotment (measured from the finished surface) and be no less than 3.0m wide
      overall. In this regard a licensed surveyor shall accurately locate all sewer mains and
      determine the necessary width of the easement, which shall be shown on any plans submitted
      for Operational Works approval. To this extent the surveyor shall certify that the sewer and the
      zone of influence is wholly contained within the easement to be created.
      In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate
      undertaking in writing that the Title Deed and the easement documents will be lodged at the
      Land Titles Office and any additional Titles Office forms or requisitions requiring the consent of
      Council will be attended to promptly.


                                                                                      Page 5 of 14

Page 6

                                                                                        2008/1867



      A duly executed copy of the easement shall be submitted to Council for perusal prior to the
      use commencing.
      Any changes required by Council’s Solicitor must be corrected immediately.
36.   No building or other structure shall be constructed or encroach over an easement.
Earthworks
37.   Earthworks on site shall be carried out in accordance with Council’s Planning Scheme Policy
      PSP5 – Engineering Design Standards, so as not to cause the additional ponding of water on
      any adjoining lands or the blockage of, or interference with, any natural watercourses. Detailed
      site surveys indicating natural surface levels and contours of the adjoining properties must be
      provided with the application for a Development Permit for Operational Works for Drainage.
      This may require the design and construction of drainage pipes and/or an overland flow-path
      within the development site that caters for drainage from the adjoining sites for a design storm
      with an Average Recurrence Interval of 1 in 100 years. A private easement for the Drainage of
      Water encompassing the drainage pipes or overland flow-path will also be required. In this
      regard a Development Permit for Operational Works shall be obtained.
      Should evidence be provided to Council indicating that no additional ponding of stormwater
      will occur on the adjoining properties the requirement for the drainage pipes, overland flow-
      path and easement shall not apply.
38.   Earthworks carried out on site shall not affect the structural integrity of any of the existing
      fences or structures that border the development site. Fences that are affected shall be
      replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard
      any fences to be replaced shall be clearly shown on the plans submitted for Operational
      Works approval.
Erosion and Sediment Control
39.   Any person acting on this permit shall prevent erosion and sediment export from leaving the
      site. Site control measures such as silt fencing, controlled gravel access to the site and
      controlled disposal of waste, will be necessary.
      In this regard plans detailing the methods of controlling erosion and sediment are required to
      be submitted to the Council for approval prior to obtaining a Development Permit for
      Operational Works.
40.   Scour of the site shall not occur as a result of the approved development. In this respect, all
      overland flow path areas must be suitably stabilised.
Contributions Towards Council Infrastructure
41.   Monetary contributions shall be paid to Sunshine Cost Regional Council towards the cost of
      providing and/or upgrading various infrastructure at the rates applicable at the time of
      payment. An estimate only of the contribution amounts under the current Council policies and
      requirements is outlined in the table below:

       Contribution Required For:                                                      Amount:
       PSP12 – Public Open Space Contributions (Park)                                  $ 3,164
       PSP16 – Sewerage Headworks Contributions                                        $3,513
       PSP17 – Water Supply Headworks Contributions                                    $4,956
       PSP20 – Pathway Trunk Network Contributions                                     $ 711
       TOTAL Contribution Amount =                                                     $ 12,344



                                                                                      Page 6 of 14

Page 7

                                                                                      2008/1867




       Please note, that these amounts are all subject to variations in the Consumer Price Index, All
       Groups Brisbane from December 2008 until the date of payment.

      All contributions must be paid prior to the issue of a Development Permit for Operational
      Works.
      Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
      contributions not be paid at the due time, Council shall call upon the trading bank guarantee in
      full.
      Processing of bonds for security where specific Council approval has been given for the
      bonding of contributions will incur an administration fee in accordance with Council’s Land
      Development Commercial & Regulatory Fees at the time of lodgement.
      In the event that the Development Permit for Material Change of Use of Premises lapses or is
      cancelled, the paid contributions and/or the trading bank guarantee will be returned.
General
42.   Any damage caused to any public utility during the course of construction shall be repaired to
      Council’s standards and at no cost to Council.
43.   Any alteration of any public utility or other facilities necessitated by the development of the
      land or associated construction works external to the site shall be at no cost to Council.
44.   The transportation of all materials to and from the site shall be undertaken in a manner such
      that no particle matter escapes onto a public road. All vehicles carrying materials either to or
      from the site shall be covered to prevent materials including dust being windblown from the
      vehicle.
Environmental Health
45.   Where the development involves the removal, relocation or demolition of a building, a Waste
      Management Plan (construction and demolition) shall be submitted prior to demolition,
      removal or relocation of any building other than a shed.
      Waste Management Plans (construction and demolition) are required to be submitted in
      accordance with Planning Scheme Policy 11, Waste Management Plans see table below.
      Waste storage areas are to provide for adequate separation of all reusable, recyclable and
      waste materials. These shall be located so that they are convenient and safe to use. (Refer to
      Noosa Council Waste Management Code)
      The Plan shall contain the following information:
             The site area for the storage and separation of waste is to be shown on the plan
              drawings accompanying the application.
             A waste management table as indicated below is to be completed showing how waste
              material is to be segregated - recycled – reused or disposed.




                                                                                    Page 7 of 14

Page 8

                                                                                   2008/1867



       MATERIALS ON-SITE                                         DESTINATION
                                                    Re-use and Recycling                    Disposal
       Expected    waste   Estimated      On-site              Off-site               *specify contractor
       materials           volume(m³)     *specify   proposed *specify contractor     and landfill site or
                                          re-use or on-site and recycling outlet      other disposal site
                                          recycling methods
       Excavation
       material
       Green waste
       Bricks
       Concrete
       Timber-please
       specify
       Plasterboard
       Metals - please
       specify
       Asbestos
       Other - please
       specify
      Note * If a demolition contractor is undertaking works, then the Waste Management table is to
      be completed by the demolition contractor.
      The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
      effective reuse and recycling of such materials. Additionally Council rewards those who
      segregate waste by significantly reducing disposal fees at the landfill some items are free.
      Higher gate fees are charged for loads of mixed waste.
46.   The developer must provide waste storage and disposal facilities in accordance with Planning
      Scheme Policy “Waste Management Multi-Dwellings and Commercial and Industrial
      Premises”, including an external imperviously paved area correctly sized for all refuse and
      recycling containers and suitably screened from public places and neighbouring properties.
47.   Noise emission from mechanical equipment (air conditioners, refrigeration equipment or pool
      pumps etc) shall comply with the following requirements:
      47.1   The equipment shall be installed and located in a manner that prevents excessive
             noise in accordance with Council’s Local Law No. 12 - Control of Nuisances.
             Infringement Notices (on-the-spot fines) may apply for offences.
      47.2   A person must not use equipment on any day if it makes or causes noise to be made:
             47.2.1    From 10pm to 7am: More than the lower of either –
                            40 dB(A)
                            3 dB(A) above the background noise level
             47.2.2    From 7am to 7pm: More than the lower of either –
                            50 dB(A)
                            5 dB(A) above the background noise level
             47.2.3    From 7pm to 10pm: More than 3 dB(A) above the background noise level.
             47.2.4    Pool pumps must not be audible at an effected premises between 10pm-7am




                                                                                 Page 8 of 14

Page 9

                                                                                        2008/1867



       47.3    Submission of written certification from a suitably qualified person confirming that the
               noise levels comply when measured at either the residential boundary or outside the
               most exposed part of an affected building, whichever is the closest to the equipment.
               This is required immediately after installation of the equipment and prior to any
               occupation of the building, and in a format approved by Council. This assessment
               must take into account noise from all fixed equipment on the property e.g. swimming
               pool pump, heating equipment, that may increase the overall noise level emitted.
       Note: it is recommended that the consultant that will be engaged to certify the noise levels of
       mechanical equipment is asked to comment on the position and installation of equipment at
       the plan design stage, this way noise problems can be minimized or avoided cost effectively.

5      REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:

 Referral Trigger              Referral Status   Referral Agency         Referral Address

 Nil

6      APPROVED PLANS/DOCUMENTS

The approved plans and / or documents for this development approval are listed in the following
table:
 Plan / Document No.       Rev.     Plan / Document Name                       Date
 DA-D03                             Ground Floor Plan West – Andrew Bock       17 October 2008
                                    Architecture
 DA-D04                             Ground Floor Plan East – Andrew Bock       17 October 2008
                                    Architecture
 DA-D05                             Floor Plan Level 1 – Andrew Bock           17 October 2008
                                    Architecture
 DA-D06                             Floor Plan Level 2 – Andrew Bock           17 October 2008
                                    Architecture
 DA-D07                             Roof Plan – Andrew Bock Architecture       17 October 2008
 DA-E.01                            North Elevation     –      Andrew   Bock   17 October 2008
                                    Architecture
 DA-E.02                            South Elevation        –   Andrew   Bock   17 October 2008
                                    Architecture
 DA-E.03                            East Elevation      –      Andrew   Bock   17 October 2008
                                    Architecture
 DA-E.04                            West Elevation      –      Andrew   Bock   17 October 2008
                                    Architecture
 DA.F.01                   A        A-Section    01    –       Andrew   Bock   28 January 2009
                                    Architecture
 DA-F.02                            -Section 02 – Andrew Bock Architecture     28 January 2009
 DA-F.03                            -Section 03 – Andrew Bock Architecture     28 January 2009
 DA-F.04                            -Section 04 – Andrew Bock Architecture     28 January 2009
 DA-F.05                            -Section 05 – Andrew Bock Architecture     28 January 2009

                                                                                      Page 9 of 14

Page 10

                                                                                     2008/1867



 DA-Z.03                         View from South East – Andrew Bock         17 October 2008
                                 Architecture
 DA-Z.04                         View from South West 2 – Andrew Bock       17 October 2008
                                 Architecture

7    ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.   The applicant is advised that development contributions and infrastructure charges applicable
     to this development approval have been based on the following Uses Class/ Uses and
     applicable quantities:-

                 Existing Development                           Approved Development
       Existing Use Class                             Approved Use Class
                               Existing Quantity                               Approved Quantity
              / Use                                         / Use
                                                      Multiple Housing -
       Detached House         1 Dwelling                                       2 x 3 Bedroom Units
                                                      Type 2 – Duplex

2.   The development should be undertaken in a manner that causes no detrimental effect upon
     the amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-
     borne hazards, atmospheric pollutants (including dust or odours) nuisance or any other
     emissions in accordance with the nuisance provisions of the Environmental Protection
     Regulation 1998 or Council’s Local Law No. 12 – Control of Nuisances.
3.   In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint,
     cement, concrete, builder’s waste or rubbish should not be permitted to enter or be placed
     where it could reasonably be expected to move into a roadside gutter, storm water drain or a
     watercourse. On the spot fines apply for such offences.
4.   Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if
     the cost of operational works exceeds $80,000, then a portable long service leave levy is
     required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight
     the approved form issued by the Building and Construction Industry (Portable Long Service
     Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory
     declaration outlining the cost of the operational works must be submitted to Council with the
     lodgement of any application for operational works over the site.
5.   The applicant is informed that approval of this development application will trigger an
     Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure
     Charges Plan for the estimated amount of $1,102 and is subject to variations in the Consumer
     Price Index, All Groups Brisbane from December 2008 until the date of payment. An
     Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the Integrated
     Planning Act 1997.
6.   The applicant is informed that payment via credit card transaction will not be an acceptable
     method of payment for development contributions conditioned in this permit or for
     infrastructure charge notices issued separately.
7.   The applicant is advised that a Compliance Permit for all plumbing and drainage works within
     the boundaries of the development site shall be obtained from Council’s Plumbing Services
     Section prior to obtaining a Development Permit for Building Works.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
                                                                                  Page 10 of 14

Page 11

                                                                                         2008/1867



The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

8     PROPERTY NOTES

Not applicable
9     PRELIMINARY APPROVAL OVERRIDING SCHEME

Not applicable

10    FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required           Subject of the required Development Permit
 Development Permit for Building Works         All Building Works

 Development     Permit    for   Operational   Landscaping, Carparking and Access, Frontage
 Works                                         Works, Stormwater Drainage, Erosion & Sediment
                                               Control & Filling of the Site

11    SELF ASSESSABLE CODES

Not applicable
12    SUBMISSIONS

Not applicable

13    REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable

14    RIGHTS OF APPEAL

You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).

15    OTHER DETAILS

Please note that an Infrastructure Charge in accordance with the Coastal Major Road Network
Infrastructure Charges Plan has been triggered by the approval of this development application. An
Infrastructure Charge Notice is attached in compliance with Chapter 5 of the Integrated Planning Act
1997.
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
                                                                                     Page 11 of 14

Page 12

                             2008/1867



Yours faithfully,




Tracy Jones
SENIOR PLANNING OFFICER




                          Page 12 of 14


[OCR of page images]
2008/1867

 

Yours faithfully,

Tracy Jones
SENIOR PLANNING OFFICER

Page 12 of 14

Page 13

                                                                                                      2008/1867



                                                        Appeal Rights
                                                    INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




The following is an extract from the Integrated
                                                                    (6) If an application involves assessment against a
Planning Act (Chapter 4).                                      concurrence agency code, appeal rights for submitters
Division 8 - Appeals to court relating to                      for the application are not available against the part of
development applications                                       the approval that represents the concurrence agency’s
                                                               response for the code.
Appeals by applicants
                                                               Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application
may appeal to the court against any of the following-          4.1.29.(1) An advice agency may, within the limits of
                                                               its jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development      development approval for a development application
      application;                                             if-
(b) a matter stated in a development approval,                 (a) the development application involves impact
      including any condition applying to the                      assessment; and
      development, and the identification of a code
      under section 3.1.6;1                                    (b) the advice agency told the applicant and the
                                                                   assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a             application as a submission for an appeal.
      development permit was applied for;
                                                                  (2) The appeal must be started within 20 business
(d) the length of a relevant period;                           days after the day the decision notice or negotiated
(e) a deemed refusal.                                          decision notice is given to the advice agency as a
    (2) An appeal under subsection (1)(a) to (d) must          submitter.
be started within 20 business days (the “applicant’s           Appeals for matters arising after approval given
appeal period”) after the day the decision notice or           (co-respondents)
negotiated decision notice is given to the applicant.          4.1.30.(1) For a development approval given for a
    (3) An appeal under subsection (1)(e) may be               development application, a person to whom any of the
started at any time after the last day a decision on the       following notices have been given may appeal to the
matter should have been made.                                  court against the decision in the notice-
Appeals by submitters                                          (a) a notice giving a decision on a request for
4.1.28.(1) A submitter for a development application               extension of the relevant period for an approval;
may appeal to the court about-                                 (b) a notice giving a decision on a request to make a
(a) the giving of a development approval, including                minor change to an approval.
      any conditions (or lack of conditions) or other              (2) The appeal must be started within 20 business
      provisions of the approval; or                           days after the day the notice of the decision is given to
(b) the length of a relevant period for the approval.          the person.
    (2) The appeal must be started within 20 business                (3) Subsection (1)(a) does not apply if the
days (the “submitters appeal period”) after the day            approval resulted from a development application
the decision notice or negotiated decision notice is           (superseded planning scheme) that was assessed as
given to the submitter.                                        if it were an application under a superseded planning
                                                               scheme.
    (3) If a person withdraws a submission before the
application is decided, the person may not appeal the             (4) Also, a person who has made a request
decision.                                                      mentioned in subsection (1) may appeal to the court
                                                               against a deemed refusal of the request.
    (4) If an application involves both impact
assessment and code assessment, appeal rights for                 (5) An appeal under subsection (4) may be started
submitters are available only for the part of the              at any time after the last day the decision on the
application involving impact assessment.                       matter should have been made.
    (5) If an application is processed under section           Division 9 - Appeals to court about other matters
6.1.28(2), appeal rights for submitters for the                Appeals for matters arising after approval given
application are available only for the aspects of the          (no co-respondents)
development that would have required public
notification under the repealed Act.                           4.1.31.(1) A person to whom any of the following
                                                               notices have been given may appeal to the court
                                                               against the decision in the notice-
                                                               (a) a notice giving a decision on a request to change
                                                                   or cancel a condition of a development approval.
1
     Section 3.1.6 (Preliminary approval may override
    local planning instrument)
                                                                                                  Page 13 of 14

Page 14

                                                                                                   2008/1867

(b) a notice under section 6.1.442 giving a decision to     (d) the length of a period mentioned in section 3.5.21
    change or cancel a condition of a development                 relevant period;
    approval.                                               (e) a deemed refusal.
    (2) The appeal must be started within 20                    (2) An appeal under subsection (1)(a) to (d) must
business days after the day the notice of the decision      be started within 20 business days (the “applicant’s
is given to the person.                                     appeal period”) after the day the decision notice or
   (3) Also, a person who has made a request                negotiated decision notice is given to the applicant.
mentioned in subsection (1)(a) may appeal to the                (3) An appeal under subsection (1)(e) may be
court against a deemed refusal of the request.              started at any time after the last day a decision on the
    (4) An appeal under subsection (3) may be               matter should have been made.
started at any time after the last day the decision on      The Registrar for the Building and Development
the matter should have been made.                           Tribunal may be contacted at the website
Appeals against decisions to change approval                http://www.localgovernment.qld.gov.au/
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
                                                            For Infrastructure Charges Only
decision made on an application to change the               4.1.36 Appeals about particular infrastructure
conditions attached to an approval given under              charges
section 2.19(3)or section 4.4 of the repealed Act may       (1) This section applies to a person who has been
appeal to the court against-                                given, and is dissatisfied with, an infrastructure
(a) the decision; or                                        charges notice or a regulated State infrastructure
(b) a deemed refusal of the application.                    charges notice.
    (2) An appeal under subsection (1)(a) must be           (2) The person may appeal to the court against the
started within 20 business days after the day notice of     notice.
the decision is to be given to the person.                  (3) The appeal must be started within 20 business
    (3) An appeal under subsection (1)(b) may be            days after-
started at any time after the last day a decision on the    (a) if the notice is given because of a development
matter should have been made.                                    approval or master plan approval-the day the
Appeals against local laws                                       applicant is given notice of the decision about the
                                                                 approval; or
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions            (b)    otherwise-the day the notice is given to the
applied under a local law about the use of premises or             person.
the erection of a building or other structure permitted     (4) An appeal under this section may only be about-
by the planning scheme may appeal to the court              (a) whether a charge in the notice is so
against the decision or the conditions applied.                  unreasonable that no reasonable relevant local
    (2) The appeal must be started within 20 business            government, State infrastructure provider or
days after the day notice of the decision is given to the        coordinating agency could have imposed it; or
applicant.                                                  (b) an error in the calculation of the charge.
For Building Works Only                                     (5) To remove any doubt, it is declared that an
Rights of appeal conferred by Section 4.2.9 of the          appeal under this section can not be about the
Integrated Planning Act 1997 as follows:                    methodology used to establish the charge in the
                                                            relevant infrastructure charges schedule or regulated
Division 3 – Appeals to tribunals relating to
                                                            State infrastructure charges schedule.
development applications
Appeals by applicants
4.2.9(1) An applicant for a development application
may appeal to the Building and Development Tribunal
against any of the following-
(a) the refusal, or the refusal in part, of a development
    application;
(b) a matter stated in a development approval,
    including any condition applying to the
    development, and the identification of a code
    under section 3.1.6;3
(c) the decision to give a preliminary approval when a
    development permit was applied for;


2
   Section 6.1.44 (Conditions may be changed or
  cancelled by assessment manager or concurrence
  agency in certain circumstances)
3
   Section 3.1.6 (Preliminary approval may override
  local planning instrument)
                                                                                               Page 14 of 14

Used in these records

About this file

File size
83 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2008.00001867.001 [As Published].pdf · 83 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.