08/0745 - Operational Works - Landscaping [As Published] · 142008.745
INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 21.1, 3 March 2008
Hiidteh ser seehcesir i my 114. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a
purposes referral to the local government as the concurrence agency.
For more information go to schedule
2 table 1 of the IP Regytation.
Assessment period 15 days. No
response is a deemed refusal.
Design and siting 15. An application may trigger referral to the local government as the concurrence agency if the building work
yomere , information go b 3a Schedule does not comply with the performance criteria of parts 11 and 12 of the Queenstand Development Code.
1 period § days. No 16. An application may trigger referral to the local government as the concurrence agency if the building work
response is a deemed refusal. does not comply with the qualitative statement for building clearance and site cover.
17. An application may trigger referral to the local goverment as the concurrence agency if the building work
does not comply with the qualitative statement for Performance Criteria 4, 5, 7, 8 or 9 of the Queensland
Development Code, part 11 or 12.
While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of
this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own
enquiries regarding the interpretation and application of the applicable legislation to your circumstances.
To the full extent permitted by !aw DIP expressly disclaims all liability (including but not limited to liability for negligence) for errors or
omissions of any kind or for any loss {including direct and indirect losses), damage or other consequence which may arise from your
reliance on this process and the information contained on this form.
Fire safety in particulay budget 18. An application may trigger referral to the local soverment as the concurrence agency to determine the
Formere Yon go . schedule building will comply with the fire safety standard under the Building Act 1975 when the building work has
2 table 1 of the IP Regulation. been completed.
Assessment period 15 days. No
response is a deemed refusal.
Higher risk personal appearance | 19. An application may trigger referral to the focal government as the concurrence agency to determine if the
For more in goto schedule building work
"| 2table 1 of the IP Roda and * — complies with the performance criteria of the Queenstand Development Code, part 15; and
the QOC part 15. . the work does not comply with an acceptable solution stated in the part.
Assessment period 15 days. No
response is a deemed refusal.
Building work for residential 20. An application for building work for premises in which residential care service under the Residential Services
or more in lo schedule (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger referral to the
2 able tof te IP Resulaon and local government as the concurrence agency.
the QDC part 20. .
Assessment period 15 days. No
response is a deemed refusal,
Bag work forremovel or | 21. An apptication for the removal and/or rebuilding at another site of a building or other structure, will trigger
For more infamaton goo schedule referral to the local government as the concurrence agency.
2 table 1 of the IP Reautation.
Assessment period 5 days, No
response is a deemed refusal.
Bulging werk for rainwater “tank 'n! 22. An application may trigger referral to the local goverment as the concurrence agency to determine if the
Fer uroinematon yo fo schedule building work or structure complies with the relevant performance criteria if -
2 lable 1 of the IP Regutation and « Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
the QDC part 25. building work, in a designated rainwater tank area; and
raane we donee days. No : * Under the Queensland Development Code, part 25, the rainwater tank does not include an-acceptable
: ~ solution for a relevant performance criterion.
Disclaimer:
APPENDIX 4, Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0745 - Operational Works - Landscaping [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.